ML20154N322
| ML20154N322 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/15/1998 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M99629, TAC-M99630, NUDOCS 9810210251 | |
| Download: ML20154N322 (2) | |
Text
_
, gp tt:
., g UNITED STATES j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20666 4001 w
October 15,1998 MEMORANDUM FOR:
Docket File FROM:
Peter S. Tam, Senior Project Manager Pioject Directorate ll-2 g
Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 170 and 162 TO OPERATING LICENSES (TAC M99629 AND M99630)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.170 (for Unit i) and 162 (for Unit 2) on October 1,1998.
Docket Numbers 50-413 and 50-414
//
Distribution
.j Docket file
'/
PUBLIC H. Berkow c
[t??*[IC'T "S QC 9810210251 981015 V-ub--'d L d PDR ADOCK 05000413 5" 6 ' ---
P PDR
'; t,,,,
-2
10/16/98 FRI 00:20 FAI
@ 004 NuclekPolOy Manual-Volume 2 NSD Appendix D. 221. Implementation Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACu ITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPIEMENTATION SHEET EP6NS O MN'S O ONS UNIT NO. Erl EPfD 3 m
TS No. "Rkat 14 Js.u-3 4 4-r.11+.9,v.1., DATE RECEIVED lbPhcf anx s r.3 AMENDMENT. NO. l~/ 0/1 f. "L DESCRIPTION Low h anivo Ove#/wwurem f
_PrGfwh
[Vlea4ve,lCetJ0tah TX Ame,9,eE
- 1. IMPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover Letter):
2 L 4P B. NRC EFFECTIVE DATE (From Text of NRC letter): 8 I
l C. STATION IMPLEMENTATION DATE (No later than NRC Efective Date): /0 7 !7
- 2. PLANT NOTIFICATION l
.7 ff Via E-Mail. Distribution; Include Site Techmcal Contacts
- 3. RGC TECHNICAL CONTENT REVIEW CRITERIA O
A. All Discrepancies Have Been Resolved Via NRC Interface.
M. ' No Inadvertent Changes Were Made To TS Sheets Involved.
, -}
VC. TS Change Was Issued As Requested By DP.
TECHNICAL REVIEWER: M an-
'?/! Pef l
v --
su y
(-;
(List Discrepancies On Attached Page)
D CHECKED BY:
b M+b I II9 l
f (List Dzscrepancies On Attached Page)
Date *
- 4. PIP NUMBER (If generated):
% C '18 '" 3 Il'7 l %5. [ALL APPLICABLE C'ITVE ACTIONS FROM ASSIGNED PIP COMPLETED VERIFIED BY:
A
/0 !'72 v
w y
Refatory Compliance Date
]
- 6. [ALL PRE-IMP TION ITEMS (n EMS 1-5) COMPLETED l
VERIFIED DY:
M
/D f j
j l
Re ry Compliance Date l
- 7. FINAL IMPLEMENTATION APPROVAL i
A/b M
I l
Manager, Regulatory Compliance Date W
kl!A I
I Manager, Safeiy Assurance Date l
l l