ML20217N331

From kanterella
Jump to navigation Jump to search

Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel
ML20217N331
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/25/1999
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA2359, TAC-MA2361, NUDOCS 9910280187
Download: ML20217N331 (2)


Text

..-.

y. tsarou

% UNITED STATES 1 g j' NUCLEAR REGULATORY COMMISSION

  1. WASHINGTON, D.C. 2056H21 49
  • * * ,o October 25,1999 MEMORANDUM FOR: Docket File 1

FROM: Peter S. Tam, Senior Project Manager, Sectio 1 S Project Directorate 11 .

+- J Division of Licensing Project Management ' i AA -

M t Office of Nuclear Reactor Regulation '

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 180 and 172 TO OPERATING LICENSES (TAC MA2359 AND MA2361)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the imp!ementation on September 29,1999, of operating license Amendment Nos.180 (for Unit 1) and 172 (for Unit 2), regarding transition to Westinghouse-supplied fuel.

1 Docket Numbers 50-413 and 50-414 I

l o e ie PUBLIC YINN kN kAbNkb Nbh* '

i R. Emch f

M p

._c ois  !

f 9910200187 991025 PDR ADOCK 05000413PDR P

i

I 10/25/99 MON 06:41 FAI~ _.@.0 01

, , ,s e M.r sW5T to 6C vJep re e tMF<.GMme uceNW ce/varrio/wl OMt-1 WKM w G A SSt W ATH (M tus Mankn oN 8 F KGMAuv0en O P 1 hkfff4TNOMGwT*

/

"A M1r hfR.t O fL T9 (M TALVTDOW --

-66 OF 0.KPA TL P-U6L.

1..,Lh3W

~

APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET GrCNS O MNS O ONS UNIT NO. DG IPl O 3  :

F rpee,2. s. : -I '

.TS NO.L L i . 3.2. A[<4,o e r,.r DATE RECEIVED T/A3[97 AMENDMENT. NO. (80f f YL DESCRIFFION (ai3 h exHoue. Frun ra avrm cw

/u.~uou nt;-~

1. IMPLEMENTATION DATES -

A. NRC ISSUE DATE (Date of NRC Cover I.etter): 2A[99 . .

l B. NRC IMPLEMENTATION DATE (From Tep ofjNRC letter): / O/n/49 l C. STATION IMPLEMENTATION DATE IO/AL/T4 l (No later than NRC Implementation Date):

2. PLANT NOTIFICATION i initials de

% , / df& E-Mail Distribution; Include Site Technical Contacts

3. RGC TECHNICAL CONTENT REVIEW CRITERIA O A. All Discrepancies Have Been Resolved Via NRC Interface.

Gr" B. No Inadvertent Chanra.s Were Made To TS Sheets Involved.

F C. TS Change Was Issaed As Requested By DPC.

TECHNICAL REVTcWER: .

FCA Z.f,OvM#ov 2J!? .. ,

(List Discrepancies On hbage) Date CHECKED BY:

M/v 7/2P/99' 1

i (List Discrepancies On Attached Page) Date

4. PIP NUMBER (If generated): C - TT- d7 P7 9 5, VAI(APPLICABLh0RRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETEDj h VERIFIED BY: // 7,L9,!99 M%y{

Regulatory Compliance Date j

6. ETALL PRE-IMPLEMENT TION ITEMS (ITEMS 1-5) COMPLETED l VERIFIED BY: _ , 7/19[99 Regulatory Compliance Date 7; FINAL IMPLEMENTATION APPROVAL

. win c49 Manager, Regula Compliance Date

~

ManaEer, Safety Xssurance Date l

  • Approval may be waived (see 221.8 Item 6).  !

D-2 F,1-33 (30 SEPT 1998)