f ~"%
UNITED STATES,
8 g
5 i
NUCLEAR REGULATORY COMMISSION.
wAswiwoToN, o.c. sosas.oooi.
May 5,1999 MEMORANDUM FOR:
Docket File FROM:
Peter S. Tam, Senior Project Manager, Se 1
/
Project Directorate 11
-p
/
Division of Licensing Project Managemen
- M. 'M Office of Nuclear Reactor Regulation
SUBJECT:
CATA'#BA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 178 and 170 TO OoERATING LICENSES (TAC MA4766 AND MA4767)
The attached document, transmitted by fax from thke Energy Corporation, signifies the implementation of operating license Amendment Nos.178 (for Unit 1) and 170 (for Unit 2),
regarding Reactor Building integrity surveillance and containment leak rate testing on April 23,1999.
Docket Numbers 50-413 and 50-414 l
}
Distribution Docket file i
PUBLIC R. Emch
'T)f
- 100:.'5
\\
9905110077 990505 PDR ADOCK 05000413 P
PDR I
I
05/05/99 WED 05:41 FAI
@ 003
./~
Nuclear Policy Manual - Volurne 2 NSD Appendix D. 221. Implementation Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET
)d.CNS O MNS O ONS UNIT NO. J51 (K 2 0 3 TS NO. 3. 6. I b,, $~T, L DATE RECEIVED L[- L[97 AMENDM3 T. No.
MO DESCRIPTION # r/v/W TJ 5% Fr /L Rx Rt ht0/;Vc o
~
& cW 0fuM AKE /tenenth Auer 0 unh~ cTRGehRA1 IfVr%Wm, AWO f.fMct/gygg)g
- 1. LV/LEMENTATION DATES "
U-
'ff7!N A. NRC ISSUE DATE (Date of NRC Cover letter):
l B. NRC IMPLEMENTATION DATE (From Text VRC ' letter): r/T[47 3/77 l
C. STATION IMPLEMENTATION DATE l
(No later than NRC Implementation Date):
- 2. PLAST NOTIFICATION ia E Mail Distribution; Include Site Technical Contacts
- 3. RGC TECHNICAL CONTENT REVIEW CRITERIA O
A. All Discrepancies Have Been Resolved Via NRC Interface.
(B. No inadvertent Changes Were Made To TS Sheets Involved.
12' C. TS Change Was Issued As equ sted By DPC.
/ '77 TECHNICAL REVIEWER:
/
v g7 y (Ilst Dtscrepancies tt ed Page)
Date Md2Nf CHECKED BY:
(List Discrepanci On Attached Page)
Date 0 ' C li - OJI7
~
- 4. PIP NUMBER (If enerated):
E
- 5. [ALL APPLICAB E C CTIVE ACTIONS FROM ASSIGNED PIP C LETED Y//l/7f VERIFIED BY:
r L --
Rhtory Compliance Date 6.
ALL PRE-IMPLEMEN ATION ITEMS (flT.MS 1-5) COMPLETED
/[n4/
,,h,kk VERIFIED BY: - gf Regulatory Compliance Date
- 7. FINAL IMPLEMENTATION APPROVAL Af[h
>l(A Date h
egulatory Comphance
/
Date Man' age'r, Safety Assurancs
- Approval may be waived (see 221.8 Item 6).
D-221-33 (30 SEPT 1998)