ML20206H167

From kanterella
Jump to navigation Jump to search

Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423
ML20206H167
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/05/1999
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA4766, TAC-MA4767, NUDOCS 9905110077
Download: ML20206H167 (2)


Text

- 8 f ~"% g UNITED STATES ,

5 i NUCLEAR REGULATORY COMMISSION .

wAswiwoToN, o.c. sosas.oooi .

May 5,1999 MEMORANDUM FOR: Docket File FROM: Peter S. Tam, Senior Project Manager, Se 1

-p ,

/

/

Project Directorate 11 Division of Licensing Project Managemen #M. '. 'M Office of Nuclear Reactor Regulation

SUBJECT:

CATA'#BA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 178 and 170 TO OoERATING LICENSES (TAC MA4766 AND MA4767)

The attached document, transmitted by fax from thke Energy Corporation, signifies the implementation of operating license Amendment Nos.178 (for Unit 1) and 170 (for Unit 2),

regarding Reactor Building integrity surveillance and containment leak rate testing on April 23,1999.

Docket Numbers 50-413 and 50-414 l

}

Distribution Docket file i PUBLIC R. Emch

100:.'5 'T)f

\

9905110077 990505 PDR ADOCK 05000413 P PDR I

I

05/05/99 WED 05:41 FAI @ 003

, .* , ./~

Nuclear Policy Manual - Volurne 2 NSD Appendix D. 221. Implementation Sheet 1

APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET

)d.CNS O MNS O ONS UNIT NO. J51 (K 2 0 3 TS NO. 3. 6. I b ,, $~T, L DATE RECEIVED L[- L[97 AMENDM3 T. No. MO DESCRIPTION # r/v/W TJ 5% Fro /L Rx Rt ht0/;Vc ~

& cW 0fuM AKE /tenenth Auer 0 unh~ cTRGehRA1 IfVr%Wm , AWO f.fMct/gygg)g

1. LV/LEMENTATION DATES "

U-A. NRC ISSUE DATE (Date of NRC Cover letter): 'ff7!N . _ ,

l B. NRC IMPLEMENTATION DATE (From Text VRC ' letter): r/T[47 l C. STATION IMPLEMENTATION DATE '

3/77 l (No later than NRC Implementation Date):

2. PLAST NOTIFICATION ia E Mail Distribution; Include Site Technical Contacts
3. RGC TECHNICAL CONTENT REVIEW CRITERIA O A. All Discrepancies Have Been Resolved Via NRC Interface.

(B. No inadvertent Changes Were Made To TS Sheets Involved.

12' C. TS Change Was Issued As equ sted By DPC.

TECHNICAL REVIEWER: - / .<-

/ '77 v g7 y (Ilst Dtscrepancies tt ed Page) Date CHECKED BY: Md2Nf (List Discrepanci On Attached Page) Date

4. PIP NUMBER (If enerated):

E

~

0 ' C li - OJI7

5. [ALL APPLICAB E C CTIVE ACTIONS FROM ASSIGNED PIP C LETED VERIFIED BY: r L -- Y//l/7f Rhtory Compliance Date
6. ALL PRE-IMPLEMEN ATION ITEMS (flT.MS 1-5) COMPLETED

, ,h ,kk VERIFIED BY:/[n4/ - gf Regulatory Compliance Date

7. FINAL IMPLEMENTATION APPROVAL Af[h >l(A h egulatory Comphance Date Man' age'r, Safety Assurancs

/ Date

  • Approval may be waived (see 221.8 Item 6).

D-221-33 (30 SEPT 1998)