ML20154N260

From kanterella
Jump to navigation Jump to search

Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007
ML20154N260
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/19/1998
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA3280, TAC-MA3281, NUDOCS 9810210227
Download: ML20154N260 (2)


Text

ptRE; I UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20656 0001

%,****+ ,o l October 19,1998 l

l MEMORANDUM FOR: Docket File FROM: Peter S Tam, Senior Project Manager  !

i Project Directorate ll-2 Division of Reactor Projects - 1/II W(

A .,/- W l

Office of Nuclear Reactor Regulation

)

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -  ;

i IMPLEMENTATION OF AMENDMENTS 172 and 163 TO  ;

OPERATING LICENSES (TAC MA3280 AND MA3281) l The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.172 (for Unit 1) and 163 (for Unit 2) on October 7,1998. l l

i Docket Numbers 50-413

/

and 50-414 i

/

l

~

Distribution Docket file PUBLIC g; H. Berkow 9810210227 DR 981019 p ADOCK 05000413 eor

., e- v -; . .,c: w;t't

. ; 'qs e ,,n,o .t- '"'.

a

(

l s -;.

10/16/08 FRI 00: 20 FAX 002 Nrclear Policy Manual - Volume 2 ,,

NSD Appendix D. 221. Implementation Sheet

+ **

APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSE /IECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTA~ITON SHEET .

  1. CNS O MNS O ONS UNrr NO. Dd V2 0 3 TS NO. 4. 0.J~ / ..b. 3 - DATE RECEIVED T!/Y AMENDMENT. NO.17ANU DESCRIPTION B JEdMMc/ _

br klY [0ML/~ I ltY f {Ln vM , 'ht)(nsN y V s ne.t h b a 9 Y l$ma J

1. IMPLEMENTNI' ION DATES A. NRC ISSUE DATE (Date of NRC Cover I.etter): 9!/o[ff B. NRC EFFECTIVE DATE (From Text of NRC letter): 7, 0 l C. STATION IMPLEMENTATION DATE (No later than NRC Effective Date): .Q! /'D!98
2. PLANT NOTIFICATION initials t I b sa E-Mail Distribution; Include Site Technical Contacts
3. RGC TECHNICAL CONTENT REVIEW CRITERIA O A. All Ducrepancies llave Been Resolved Via NRC Interface.
  1. B. No Inadvertent Changes Were Made To TS Sheets Involved.

C C. TS Change Was Issued As Re ested By DPC.

TECHNICAL REVIEWER:

ff 9//[/N (List Ihscwpancies On Attached Pah Date CHECKED BY: &asik (W NISl49)

(List Discrepancies On A ched Page) . Date *

4. PIP NUMBER (If generated): 0 - C 92 - 340D q(( , l S. [ALL APPLICAB ORRECTIVE ACTIONS FROM ASSIGNED PIP C MPLETED V

%Ypk6lw.ERIFIED BY:

s> /

k?-

v/-

Rebiatory Compliance Date j 6. [ALL PRE-IMPL TION ITEMS (ITEMS I-5) COMPLETED l VERIFIED BY: - 7!N l Rehtory Compliance Date l 7. FINAL IMP i . XIION APPROVAL i l

l Manager, Regulatory Compliance Date l

  • M l Manager, Safety Assurance . Date

.