ML20154N260

From kanterella
Jump to navigation Jump to search

Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007
ML20154N260
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/19/1998
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA3280, TAC-MA3281, NUDOCS 9810210227
Download: ML20154N260 (2)


Text

ptRE; I

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20656 0001

%,****+,o l

October 19,1998 l

l MEMORANDUM FOR:

Docket File FROM:

Peter S Tam, Senior Project Manager W(

W Project Directorate ll-2 i

Division of Reactor Projects - 1/II A.,/-

Office of Nuclear Reactor Regulation

)

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 172 and 163 TO i

OPERATING LICENSES (TAC MA3280 AND MA3281)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.172 (for Unit 1) and 163 (for Unit 2) on October 7,1998.

l i

Docket Numbers 50-413

/

and 50-414 i

/

Distribution

~

Docket file PUBLIC g;

H. Berkow 9810210227 981019 DR ADOCK 05000413 p

eor

..,c: w;t't v -;

., e-

. ; 'q

,,n,o

.t-a e

l s

(

s -;.

10/16/08 FRI 00: 20 FAX 002 Nrclear Policy Manual - Volume 2 NSD Appendix D. 221. Implementation Sheet

+

APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSE /IECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTA~ITON SHEET

  1. CNS O MNS O ONS UNrr NO. Dd V2 0 3 T!/Y TS NO.
4. 0.J~ /..b. 3 -

DATE RECEIVED AMENDMENT. NO.17ANU DESCRIPTION B JEdMMc/

br klY [0ML/~ I ltY f {Ln vM, 'ht)(nsN V s ne.t h b a 9 Y l$ma J

y

1. IMPLEMENTNI' ION DATES A. NRC ISSUE DATE (Date of NRC Cover I.etter):

9!/o[ff B. NRC EFFECTIVE DATE (From Text of NRC letter): 7, 0

.Q /'D!98 l

C. STATION IMPLEMENTATION DATE (No later than NRC Effective Date):

2. PLANT NOTIFICATION initials t

I b

sa E-Mail Distribution; Include Site Technical Contacts

3. RGC TECHNICAL CONTENT REVIEW CRITERIA O

A. All Ducrepancies llave Been Resolved Via NRC Interface.

  1. B. No Inadvertent Changes Were Made To TS Sheets Involved.

C C. TS Change Was Issued As Re ested By DPC.

ff TECHNICAL REVIEWER:

9//[/N (List Ihscwpancies On Attached Pah Date CHECKED BY:

&asik (W NISl49)

(List Discrepancies On A ched Page)

Date *

4. PIP NUMBER (If generated): 0 - C 92 - 340D q((, l S. [ALL APPLICAB ORRECTIVE ACTIONS FROM ASSIGNED PIP C MPLETED V

s>

/

k?

%Ypk6lw.ERIFIED BY:

v/-

Rebiatory Compliance Date j

6. [ALL PRE-IMPL TION ITEMS (ITEMS I-5) COMPLETED 7!N l

VERIFIED BY:

l Rehtory Compliance Date l

7. FINAL IMP XIION APPROVAL i

i l

l Manager, Regulatory Compliance Date M

l l

Manager, Safety Assurance Date

.