ML20236R786

From kanterella
Jump to navigation Jump to search

Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715
ML20236R786
Person / Time
Site: Catawba  
Issue date: 07/16/1998
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA1299, TAC-MA1300, NUDOCS 9807220272
Download: ML20236R786 (2)


Text

, ' ',,.,

A ttr

/ pf g.,

~T UNITED STATES 1?:y.

[

NUCLEAR REGULATORY COMMISSION t'

WASHINGTON, D.C. 20066-0001 L6 ~ g July 16,1998 i

MEMORANDUM FOR:

Docket File ' 4 FROM:

Peter S. Tam, Senior Project Manager a

Project Directorate ll-2 hbp *. #

Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 /c9 IMP OPERATING LICENSES (TAC MA1299 AND MA1300) k-The attached document, transmitted by fax from Duke Energy Corporation, signifies the

. implementation of operating license Amendment Nos.167 (for Unit 1) and 159 (for Unit 2) on July 15,1998.

Docket Numbers 50-413 and 50-414 Distnbution Docket file PUBLIC H. Berkow l-

\\

L

\\

1 no\\

yRn in q'c;a CGM w baw-

.....v..,

9e07220272 9so716 PDR ADOCK 05000413 p

PM L_1_ - - - - _ _ - - _ - - - -

l wvinvruu uw3wu:coem uwwe

/

Nedear Policy Manual - Volume 2 NSD Appedix D. 221. Implemcatation Shed I

APPENDIX D. 221. FACILITY OPERATING l

LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT l IMPLEMENTATION SHEET l

.,%... i + n FACILITY OPERATING LICENSEffECHNTCAL SPECIFICATIONS ASENDMENT IMPIIMENFATION SHEET Ik2O kCNS O MNS O ONS UNIT NO.

TS NO$W 3,3-3 M$ DATE RECE!VED "I

. /T AMENDMENT. NO. IO //fi DESCRIPTION _Com.d s h ct24~EiM r%Qe

-Qrvd.v.to.l'it of it-mb f rec cv'e.<. Wr le-&r As adve.k L (t>u'.

3,' { IMPLEMENTATION DATES

' A 83*" '

A. NRC ISSUE DATE (Date of NRC Cover Letter):

'"7l el l9 R B. 'NRC EFFECTIVE DATE (From Text of NRC letter):

) f) }7N l

C. STATION IMPLEMENTATION DATE (Nob b NRC I h Date):

k i

2. PLANr NOTIFICATION initials date I

hk /J jihgVla E-Mail Distribution; Include Site Technical Contacts

3. RGC TECHNICAL CONTENT REVIEW CRITERIA O

A. All Discrepancies Have Been Resolved Via NRC Interface.

O B. No Inadvertent f~hmtes Were Made To TS Sheets Involved.

C. TS Change Was Issued As Requested By DPC.

IECHNICAL REVIEWER:

N b40M l'N7 M (list Discrepancies O ed Page)

[

Dat s,,,

.. /[ 98 CHECKED BY:.

w (list Discrepancies On Attached Page)

, Date "

45 PIP NINBER (If generated):

O ~ CD b - 34'II I h. O ALL APPLICABLE CORRECTIVE ACTIONS FROM ASSIGNED PIP CONPLETED VERIFIED BY:

1. Iil 9Y Tw<. ~ggggulatory Compliaice Date coemu gea l

l

6. [AI.L PRE IMP TION ITEMS (ITEMS 15) COMPLETED l

VERIFIED BY:

7 bfn[

l htory Compliance Date (31 M.AR 1998)

D-221-31