Notice of Violation from Insp on 970112-0215.Violation Noted:Activities Affecting Quality Were Not Accomplished, IAW Documented Prescribed Procedures & QA Condition Matls Were Not Stored in QA Controlled Hold AreaML20140B758 |
Person / Time |
---|
Site: |
Catawba |
---|
Issue date: |
03/17/1997 |
---|
From: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
---|
To: |
|
---|
Shared Package |
---|
ML20140B755 |
List: |
---|
References |
---|
50-413-97-03, 50-413-97-3, 50-414-97-03, 50-414-97-3, NUDOCS 9704010076 |
Download: ML20140B758 (2) |
|
|
---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath ML20149F9061997-07-0707 July 1997 Notice of Violation from Insp on 970427-0607.Violation Noted:Control Room Annunciator Alarm Response for Main Feedwater Containment Isolation Valve Low Nitrogen Actuator Pressure Inadequate ML20148F9291997-05-23023 May 1997 Notice of Violation from Insp on 970323-0426.Violation Noted:Improper Sequencing of Valves to Isolate & Drain Containment Penetrations Resulted in Loss of Inventory from Component Cooling Water Sys ML20141K6611997-05-16016 May 1997 Errata to NOV from Insp on 960324-0504.Violation Noted: Licensee Failed to Accomplish Activities Affecting Quality IAW Procedures as Evidenced by Listed Info ML20137X3291997-04-16016 April 1997 Notice of Violation from Insp on 970210-14.Violation Noted:Licensee Failed to Include Number of Structures,Sys & Components within Scope of Maint Rule as Required ML20140B7581997-03-17017 March 1997 Notice of Violation from Insp on 970112-0215.Violation Noted:Activities Affecting Quality Were Not Accomplished, IAW Documented Prescribed Procedures & QA Condition Matls Were Not Stored in QA Controlled Hold Area ML20128R0861996-10-0707 October 1996 Notice of Violation from Insp on 960728-0907.Violation Noted:On 960804,residual Heat Removal Sys Was Inadequate Which Resulted in Failure of Valve 2ND-53 ML20059G1591993-12-30030 December 1993 Notice of Violation from Insp on 931117-19 & 1129-1203. Violation Noted:On 931130,licensee Written Plan & Schedule Did Not Provide for Code Required Surface Exams on safe-end to Pipe Weld Safety Injection Accumulator Tanks ML20059K6891993-10-29029 October 1993 Notice of Violation from Insp on 930905-1002.Violation Noted:Instrumentation & Electrical Technicians Failed to Adequatley Implement Catawba Nuclear Site Directive 4.2.2 & Procedure IP/O/A/3890/01 ML20127E8361993-01-0606 January 1993 Notice of Violation from Insp on 921108-1212.Violation Noted:Design Control Measures Associated W/Ca Sys Were Inadequate & Design Deficiencies Rendered Sys Inoperable ML20062A1011990-10-0303 October 1990 Notice of Violation from Insp on 900803-0905.Violation Noted:Shift Supervisor Failed to Follow Procedural Requirements ML20059H0161990-08-31031 August 1990 Notice of Violation from Insp on 900624-0802.Violation Noted:Failure to Follow Instrumentation Procedures During Conduct of Plant Mod & Failure to Perform Adequate 10CFR50.59 Safety Evaluation Prior to Securing Annulus Door ML20056A5751990-07-23023 July 1990 Notice of Violation from Insp on 900611-19.Violation Noted: Control Room Operator Failure to Verify That Manual Valve Closed Resulting in Inadvertent Diversion of Reactor Coolant to Refueling Water Storage Tank ML20056A5091990-07-20020 July 1990 Notice of Violation from Insp on 900527-0623.Violation Noted:Solenoids on 3 Pilot Valves Associated W/Unit 2 High Pressure Fire Protection Sys Installed Backwards During Const ML20247C7021989-08-31031 August 1989 Notice of Violation from Insp on 890616-28.Violation Noted: from 890602-16,both Channels of Reactor Vessel Water Level Instrumentation Inoperable in Modes 1,2 & 3 Due to Closure of Isolation Valves on upper-range Pressure Transmitters ML20247R7211989-07-25025 July 1989 Notice of Violation from Insp on 890528-0701.Violation noted:post-accident Liquid Sampling Sys Periodic Test Inadequate to Ensure Valve Locked Closed After Use on 890602 in That Valve Discovered Open & Unlocked ML20246P7051989-07-10010 July 1989 Notice of Violation from Insp on 890405-0510.Violation Noted:On 890413,valve 1-KC-9 Not Locked in Position While Unit 1 at 100% Power & on 890412 & 0502,operators Did Not Frisk Upon Leaving Contaminated Area ML20246C0761989-06-27027 June 1989 Notice of Violation from Insp on 890326-0429.Violations Noted:Selected Control Room Drawings Do Not Reflect as-built Conditions & Support Documents Necessary to Discern Scope of Mods Not Available in Control Room ML20246N4451989-05-0404 May 1989 Notice of Violation from Insp on 890403-07 & 13.Violation noted:1988 Semiannual Effluent Release Rept Listed Two Abnormal Releases,But Did Not Include Descriptions of Events ML20245G2981989-04-20020 April 1989 Notice of Violation from Insp on 890226-0325.Violation Noted:Licensee Failed to Implement Procedure in That While Attempting to Close 1SV-27A,operator Inadvertently Closed 1SM-7,Steam Generator 1A MSIV ML20244A8971989-03-29029 March 1989 Notice of Violation from Insp on 890204-25.Violation Noted:Procedure PT/1/A/4200/55, CA Check Valve Leak Rate Test Inadequate to Ensure Auxiliary Feedwater Suction Piping Vented After Filling ML20246L6591989-03-0303 March 1989 Notice of Violation from Insp on 890130-0203.Violations Noted:Two Licensee Employees Not Provided W/Info & Instructions Re Entering High Radiation Area & Area Not Posted ML20236A2161989-03-0202 March 1989 Notice of Violation from Insp on 881127-0204.Violation Noted:Failure to Declare Equipment Inoperable & Perform Written Safety Evaluation & 890126 Partial Obstruction of Unit 1 Pit Drain ML20206J5821988-11-16016 November 1988 Notice of Violation from Insp on 880926-1025.Violations Noted:Two Instrument & Electrical Technicians Working W/O Procedures & Procedures AP-0-A-5500-34 & Omp 2-29 Inadequate ML20195B7161988-10-24024 October 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Lack of Environ Qualification for Certain Components of Electrical Equipment in Isolated Sys ML20205K0891988-10-17017 October 1988 Notice of Violation from Insp on 880826-0925.Violation Noted:Air Regulator for Valve 1CF-89 Replaced & Returned to Svc on 880721,w/o Being Tested to Demonstrate That Parameter Affected,Within Acceptable Limits ML20207J8011988-09-16016 September 1988 Notice of Violation from Insp on 880719-22.Violation Noted: Licensee Failed to Adhere to Radiological Control Procedures in That on 880604,operations Personnel Stopped Leaking Valve W/O Waiting for Surveys,Evaluations or Job Coverages ML20154A6141988-09-0202 September 1988 Notice of Violation from Insp on 880801-05.Violation Noted:No Objective Evidence Exists That Catawba Safety Review Group Reviews NRC Issuances,Industry Advisories or Other Sources Which May Indicate Areas for Improving Safety ML20153C5261988-08-19019 August 1988 Notice of Violation from Insp on 880626-0725.Violation Noted:Failure to Maintain Two Operable Channels Per Valve for PORV Block Valve Position Indicators from Initial Licensing Until 880520 ML20151E5531988-07-0808 July 1988 Notice of Violation from Insp on 880526-0625.Violation Noted:Personnel Exceeded Overtime Guidelines on Numerous Occasions During Jan & Feb 1988 W/O Prior Approval ML20195K1191988-06-17017 June 1988 Notice of Violation from Insp on 880426-0527.Violation Noted:Failure to Establish Measures to Assure That Stopwatches Properly Controlled,Calibr & Adjusted & Valve Not Tested Before Returning to Svc ML20195E4261988-06-13013 June 1988 Notice of Violation from Insp on 880310-18.Violation Noted:W/Unit 2 in Mode 1 & Operating at 20% Power,Three Independent Steam Generator Auxiliary Feedwater Pumps Not Operable During Actual Turbine Trip ML20154D1081988-05-0606 May 1988 Notice of Violation from Insp on 880326-0425.Violation Noted:Diesel Generator 2B Inoperable for Period Exceeding Tech Spec Limits & Licensee Failed to Place Unit in Hot Standby & Subsequently in Hot Shutdown ML20151B3441988-03-31031 March 1988 Notice of Violation from Insp on 880225-0325.Violation Noted:Failure to Follow Tech Spec Administrative Requirements for Approval of Mods ML20148E6871988-03-18018 March 1988 Notice of Violation from Insp on 880202-04.Violation Noted: Failure to Establish Adequate Measures to Control Eddy Current Testing of Steam Generator Tubes ML20148E9431988-03-14014 March 1988 Notice of Violation from Insp on 880111-15.Violations Noted: Unit 2 Entered Mode 5 Exceeding by Approx 96 Hrs Time Required to Shutdown ML20148H7361988-03-10010 March 1988 Notice of Violation from Insp on 880126-0225.Violations Noted:On 880123,RCS Pressure Allowed to Exceed 1,955 Psig & on 880109,equipment Operator Designated to Remove Safety Tag 410 Removed Tag & Repositioned Switch W/O Approval ML20149H3571988-02-0404 February 1988 Notice of Violation from Insp on 871226-880125.Violation Noted:Failure to Maintain Automatic Valve in Flow Path in Open Position When Above 10% Rated Thermal Power IR 07100126/20120251988-01-11011 January 1988 Revised Notice of Violation from Insp on 871126-1225. Violation Noted:On 871113,licensee Failed to Properly Classify Start Attempt Number 548 on Diesel Generator 1A as Invalid Failure 1999-07-22
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000413/19993021999-10-12012 October 1999 NRC Operator Licensing Retake Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23.Two Out of Three RO Candidates & One SRO Passed Retake Exam IR 05000413/19993011999-09-30030 September 1999 NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16.Eight of Fourteen Applicants Passed Exam IR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-017, on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground1999-05-18018 May 1999 PNO-II-99-017:on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws1999-05-0505 May 1999 PNO-II-99-015:on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed1998-08-28028 August 1998 PNO-II-98-037A:on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified1998-08-10010 August 1998 PNO-II-98-037:on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 PNO-II-98-025, on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed1998-05-11011 May 1998 PNO-II-98-025:on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc1997-12-31031 December 1997 PNO-II-97-066:on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc PNO-II-97-064, on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation1997-12-29029 December 1997 PNO-II-97-064:on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required IR 05000414/19970081997-12-19019 December 1997 Notice of Deviation from Insp on 971012-1122.Deviation Noted:On 971020,licensee Had Not Performed Alarm Set Point Adjustment Evaluation Discussed in Violation 50-414/97-08-01 ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath 1999-09-30
[Table view] |
Text
. . .. . . . . - . ..
)
NOTICE OF VIOLATION 1 l 1
Duke Power Company Docket Nos. 50-413 and 50-414 1 Catawba Nuclear Station License Nos. NPF-35 and NPF-52 l a
During an NRC inspection conducted on January 12 - February 15. 1997.
violations of NRC requirements were identified. In accordance with NUREG 1600
" General Statement of Policy and Procedure for NRC Enforcement Actions." the i violations are listed below: l l
A. 10 CFR 50. Appendix B. Criterion V. Instructions. Procedures, and ;
Drawings, as implemented by Duke Power Company Topical Quality Assurance !
(0A) Program (Duke-1-A) requires that activities affecting quality shall be accomplished in accordance with documented prescribed procedures.
Catawba procedures. 0AG-1 Receipt. Inspection, and Control of QA Condition Material. Parts, and Components, revision 34, and NPP-311.
Receipt. Ins)ection, and Testing of 0A Condition Commodities, revision
- 4. require tlat received QA condition materials and parts designated as OA hold status shall be stored in a OA controlled hold area until a final 0A disposition has been made.
Contrary to the above, as of February 2. 1997, activities affecting quality were not accomplished in accordance with documented prescribed procedures in that received QA condition materials were not stored in a l QA controlled hold area and were released for use without the required l OA final dispositions. Specifically, the receipt inspection documentation for the Spare Parts Diesel Generator (SPDG). dated August 28, 1987 designated the SPDG and all parts as 0A hold status, to be ,
stored in a OA level C storage area. All parts were to receive an i evaluation against Duke Power Diesel Generator Specification CNS 1301.00-00-0002, prior to use; however, the SPDG was not stored in a OA i controlled hold area and numerous parts including pistons, cylinders. l turbocharger, and shaft driven pumps, had been released for use without the documented QA final disposition.
This is a Severity Level IV violation (Supplement I).
B. Part 70.24(a)(3), of Title 10 of the Code of Federal Regulations, requires, in part, each licensee authorized to possess special nuclear material (SNM) in a quantity exceeding those identified. to maintain applicable emergency procedures and conduct drills to ensure personnel are withdrawn to an area of safety when a criticality alarm sounds in areas where SNM is handled, used or stored.
Contrary to the above, as of January 17. 1985, for Unit 1 and May 15.
1986, for Unit 2. the licensee never developed and maintained criticality emergency procedures or conducted emergency drills for areas where sufficient quantities of special nuclear material are handled, used or stored (new fuel unloading and storage areas). Furthermore the licensee's initial exemptions from the requirements of 10 CFR 70.24(a)
Enclosure 1 9704010076 970317 PDR ADOCK 05000413 G PDR
4 Notice of Violation 2 (contained as aart of its original NRC Material License for possessing SNM) expired w1en the Catawba Unit 1 and 2 construction permits were converted to operating licenses in 1985 and 1986 respectively. At that time, the licensee failed to implement appropriate emergency 3rocedures, or renew its exemptions. Since then, new fuel storage areas lave been used to handle and store new fuel assemblies on a regular basis prior to each unit refueling outage.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201. Duke Power Com)any is hereby required to submit a written statement or explanation to t1e U.S. Nuclear Regulatory Commission. ATTN: Document Control Desk. Washington D.C. 20555 with a copy to the Regional Administrator. Region II, and a copy to the NRC Resident Inspector at the Catawba Nuclear Station, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation. (2) the corrective steps '
that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full com)liance will be achieved. Your response may reference or 'nclude 3revious docteted correspondence, if the correspondence adequately addr?sses t1e required response. If an adequate reply is not received within the time 1 specified in this Notice, an order or Demand for Information may be issued as to why the license should not be modified, sus) ended, or revoked, or why such other action as may be proper should not be tacen. Where good cause is shown.
consideration will be given to extending the response time.
Because your res)onse will be placed in the NRC Public Document Room (PDR). to !
the extent possi)le, it should not include any personal privacy. 3roprietary, or safeguards information so that it can be placed in the PDR witlout ;
redaction. If personal privacy or proprietary information is necessary to i provide an acceptable response, then please provide a bracketed copy of your i response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must s)ecifically identify the portions of your response that you seek to have withield and provide in detail the bases for your claim of withholding (e.g. , explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of l protection described in 10 CFR 73.21. l l
Dated at Atlanta, Georgia l' this 17th day of March.1997 Enclosure 1
. ;