Notice of Violation from Insp on 900611-19.Violation Noted: Control Room Operator Failure to Verify That Manual Valve Closed Resulting in Inadvertent Diversion of Reactor Coolant to Refueling Water Storage Tank
ML20056A575
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/23/1990
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20056A574 List:
References
RTR-REGGD-01.033, RTR-REGGD-1.033 50-413-90-17, NUDOCS 9008080259
Download: ML20056A575 (2)


Text

a .

ENCLOSURE NOTICE OF VIOLATION Duke Power Company Docket No. 50-413 Catawba Nuclear Station License No. NPF-35 Unit 1 EA 90-118 During the: Nuclear Regulatory Commission (NRC) inspection conducted on June 11-19, 1990, a violation of NRC requirements was identified. In

+

accordance with the 10 Enforetnent Actions," " General Statement CFR Part of Policy 2, Appendix C. (and Procedures for NRC1990), the v listed melow:

Technical Specification 6.8.1 requires that writt' aved procedures shall. be established. implemented, and maintaint ' applicable activities recommended in Appendix A of Regulator Revision 2, February 1978.

Appendix A of Regulatory Guide 1.33, Revision 2, February 1978, recommer' procedures for surveillance tests. Test proce/ PT/1/A/4200/57, FW ak ND Check Valve Full Stroke Test, requires th; talve IND-33 be closed .

prior to opening valves IND-36B, 37A, 32A, and 4NI-178B. 1 Contrary to the above, on June 11, 1990, during the performance of test procedure PT/1/A/4200/57, FW and ND Check Valve Full Stroke Test, the Unit I control room operator failed to verify that manual valve IND-33 had been closed as required by the procedure before proceeding with subsequent procedure steps. This resulted in an inadvertent diversion of 5,000 gallons of reactor coolant to the Refueling Water Storage Tank, violations of the pressurizer cooldown -and heatup rate limitations -an inadvertent operating Mode . change, and a momentary loss of residual heat removal capability.

.This is a Severity Level IV Violation and applies to Unit 1 only.

(SupplementI).

Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby  :

required to submit a written statement or explanation to the Nuclear Regulatory Commission ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Regional' Administrator, Region II, and a copy to the NRC Resident Inspector, Catawba, within thirty (30) days of the date of the letter transmitting this Notice. This reply should be clearly marked as a " Reply to a Notice- of Violation" and should include for each violation: (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved. Where good cause is shown, ~

consideration will be given to extending the response time.

9008080259 900723 PDR O ADOCK 03000413 PDC

kb ,

m.

Q(! ' . G;s W'T DbkePowerCompany .

2 Docket No. 50-413 .

.i t ', t i :i . Catawba Nuclear Station License No. NPF-35

? "p '

Unit 1 EA 90-118 Oj If- an. adequate reply-is not received within the time specified in this Notice,

" an order may be issued to'show cause why the license- should. not be modified, yil- suspended, or revoked'or why such other action as may be proper should not be Ltaken, w

ln., .

, FOR THE NUCLEAR REGULATORY COMMISSION

-f

p , suf()

Stewart D. Ebneter

, , Regional Administrator-i

' -w Dated at Atlanta, Georgia = 4 this 23 day of. July 1990 '!