ML20147A872

From kanterella
Revision as of 15:40, 25 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-341/96-12 on 961007-10,28-31,1104-07, 18-21 & 1212.No Violations Noted
ML20147A872
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/23/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20147A879 List:
References
NUDOCS 9701280351
Download: ML20147A872 (3)


See also: IR 05000341/1996012

Text

- - . - - . _ . . -. . - . - - - . . .- .

.

.

January 23, 1997

Mr. D. R. Gipson

Senior Vice President

Nuclear Generation

The Detroit Edison Company ,

6400 North Dixie Highway , 1

Newport, MI 48166

SUBJECT: NRC INSPECTION REPORT NO. 50-341/96012(DRS)

Dear Mr. Gipson:  ;

This refers to the inspection conducted by Mr. J. H. Neisler of this office on October 7-10, i

28-31, November 4-7, 18-21, and December 12,1996, at your Fermi 2 nuclear facility. l

At the conclusion of the inspection, the inspection results were discussed with those l

members of your staff identified in the enclosed report.  ;

i

The inspection examined your activities relative to the rebuild of the main turbine, l

refurbishment of the Station Blackout / Appendix R combustion turbine, materials )

engineering relative to equivalent parts evaluations and your activities to correct main '

steam line vibration problems.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter j

and the enclosures will be placed in the NRC Public Document Ro'am. '

We will gladly discuss any questions you have concerning this inspection. Your

cooperation with us is appreciated.

Sincerely,

/s/ M. Icach (for)

l

'

Geoffrey E. Grant, Director

Division of Recctor Safety

Docket No. 50-341 l

Enclosure: Inspection Report No. 50-341/96012(DRS)

l

Digtribution: 1

See attached list l

SEE ATTACHED CONCURRENCES

DOCUMENT NAME: G:\FER96012.DRS

To receive a copy of thle document, Indicate in the box "C" = Copy w/o attach /enci T = Copy w/ attach / encl "N" = No copy

0FFICE Rlll:DRS l RIII:DRS l RIII:DRP l Rill:DRS W I

NAME Neisler Gardner Jordan Leach / Grant #Vx.

DATE 01/ /97 01/ /97 01/ /97 01/ 2.3 /97

0FFICIAL RECORD COPY

9701280351 970123

PDR ADOCK 05000341

0 PDR

. - -_. _ _ ._ - _ - _ . . _ ._ _ . . . . - - _ . . .. . . _ _ . _ _

9

.

?

Mr. D. R. Gipson  !

Senior Vice President

Nuclear Generation

The Detroit Edison Company

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: NRC INSPECTION REPORT NO. 50-341/96012(DRS)

Dear Mr. Gipson:

This refers to the inspection conducted by Mr. J. H. Neisler of this officer on

October 7-10, 28-31, and November 4-7,18-21,1996, at your Fermi 2 nuclear facility.

At the conclusion of the inspection, the inspection results were discussed with those

members of your staff identified in the enclosed report.

The inspection examined your activities relati.e to the rebuild of the main turbine, j

refurbishment of the Station Blackout / Appendix R combustion turbine, materials, i

engineering relative to equivalent parts evaluations and your activities to correct main l

steam line vibration problems. j

i

in accordance wi'.h 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and the enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection. Your

cooperation with us is appreciated.

Sincerely,

1

Geoffrey E. Grant, Director i

Division of Reactor Safety

Docket No. 50-341

Enclosure: Inspection Report No. 50-341/96012(DRS)

Distribution:

See attached list

DOCUMENT NAME: G:\FER96012.DRS

To receive a copy of this document, indicate in the box *C" = Copy w/o attach /enci *E" = Copy w/ attach /enct *N" = No copy

0FFICE RIII:DRS, . l4f

_

RIII:DRS l t. RIII:DRP l RIII:DRS l

NAME Neisler/N'TT Gardner W Jordan #f/7'+ Leach / Grant

DATE 01/g i /97 01/ W /97 01/2 3 /97 01/ /97

0FFICIAL RECORD COPY

.

9

D. R. Gipson 2 January 23, 1997

cc w/encts: N. Peterson, Supervisor of Compliance

P. A. Marquardt, Corporate Lega! Department

James R. Padgett, Michigan Public

Service Commission ,

Michigan Department of Public Health 1

Monroe County, Emergency Management Division

Distribution:

Docket File w/ encl Rlli PRR w/enci Enf. Coordinator, Rlli w/enci

'

USLIC IE-01 w/ encl? SRI, Fermi w/enci CAA1 w/enct

/LFDCB w/enci LPM, NRR w/enci

DRP w/ encl A. B. Beach, Rlli w/ encl

DRS w/ encl W. L. Axelson, Rlll w/enci

i

i

l

!

280047

i \