ML20136B996

From kanterella
Revision as of 11:10, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-445/97-04 & 50-446/97-04 on 970210-14 & Notice of Violation
ML20136B996
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/05/1997
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20136B999 List:
References
NUDOCS 9703110227
Download: ML20136B996 (5)


See also: IR 05000445/1997004

Text

~-, . .-- - ~ ~ ~ . - . - - - - , - - . . . - - . _ -

.

g* "%g UNITED STATES

8 ft NUCLEAR REGULATORY COMMISSION  !

.

3 g REGloN IV .

,

.

611 RYAN PLAZA drive, SulTE 400

(% . . .' . * #g

'

AR LINoToN, T E xAS 76011-0064

MAR 5 1997

Mr. C. L. Terry

TU Electric ,

Group Vice President, Nuclear

ATTN: Regulatory Affairs Department

P.O. Box 1002

Glen Rose, Texas 76043

SUBJECT: .NRC INSPECTION REPORT 50-445/97-04;50-446/97-04 AND NOTICE OF

VIOLATION

Dear Mr. Terry:

An NRC inspection was conducted February 10-14,1997, at your Comanche Peak Steam

Electric Station, Units 1 and 2 reactor facilities. The enclosed report presents the scope

and results of that inspection.

During this inspection, one violation of NRC requirements was identified by our inspectors.

The violation involved the failure to correct a previously identified exercise weakness

stemming from implementation of site evacuation procedures. This violation is of concern

because it involves protection of plant personnel and because it indicates that corrective

actions for key emergency responsibilities were not fully effective. l

!

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the  !

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with j

regulatory requirements. '

In addition to the violation, one exercise weakness was identified during the simulator

walkthroughs as discussed in Section P4 of the enclosed inspection report. The weakness

involved the failure to make a timely protective action recommendation following a general  !

emergency declaration.

According to 10 CFR Part 50, Appendix E.IV.F.2.g, exercise weaknesses are inspection

findings that need to be corrected by the licensee. You are requested to provide this office

with a description of your corrective measures and your schedule for completing these

actions within 30 days after receipt of this letter.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room. To

the extent possible, your response should not include any personal privacy, proprietary, or

safeguards information so that it can be placed in the Public Document Room without

redaction,

i

9703110227 970305

PDR ADOCK 0500 4 5 i{

"

.

5.Umpp.sppus

A

. - _ - _ - . .

I

-

TU Electric -2-

,

i

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

c -

fis /

ennett . Bro man, Acting Director

Division of Rdictor Safety

Docket Nos.: 50-445;50-446  !

License Nos.: NPF-87; NPF-89

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-445/97-04;50-446/97-04

cc w/ enclosures:

Mr. Roger D. Walker

TU Electric  ;

Regulatory Affairs Manager

P.O. Box 1002

Glen Rose, Texas 76043

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

TU Electric

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

George L. Edgar, Esq.

Morgan, Lewis & Bockius

1800 M. Street, NW

Washington, D.C. 20036

_ , _ _ . _ _ _ _ _ . . . _ . - - . _ _. _ _ - _ ._ .. _ -_. _

.

I

l

TU Electric -3- l

<!

l

!' G. R. Bynog, Program Manager /

Chief Inspector

! Texas Department of Licensing & Regulation i

1 Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

l

'

Honorable Dale McPherson

County Judge

P.O. Box 851

,

Glen Rose, Texas 76043

1

i Texas Radiation Control Program Director

1100 West 49th Street l

Austin, Texas 78756

!

John Howard, Director

Environmental and Natural Resources Policy

l Office of the Governor

P.O. Box 12428

4

Austin, Texas 78711

, )

i

.,

'$

t - 1

lf( l

l

l

1

TU Electric -4-

E-Mail report to T. Boyce (THB)

E-U, ail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE35)

bec distrib. by RIV:

Regional Administrator Resident inspector (2)

DRP Director DRS-PSB ,

Branch Chief (DRP/A) MIS System l

'

Project Engineer (DRP/A) RIV File

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

T. Essig (NRR/DRPM/PERB)

DRS AI 9 7-G-0035  :

!

I

l

DOCUMENT NAME: R:_CP\CP704RP.GMG

To receive copy of document, Indicate in box: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy

SEPA:PSB _

E RS:PSB lE C:PSB ,l E AD:DRS N AD:DRP kN

GMGood \]'~ TAAndrews BMurray 9 KEBrockgan ff ATHowellQ/dl

02g97 02/2497 w 02 @ 7 02/@ 977

>

0)/[,/97 /)' f7

AD:DRS N

KEBryckrgjn g

03/i/97 # l/ 1/

'

y OFHCIAL RECORD COPY

_

_. -~. . - - _ . ._ . - . - .- - - . . .- - .

. .

1

'

,

TU Electric -4-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE35)

$ bec distrib. by RIV:

1

Regional Administrator Resident inspector (2)  ;

DRP Director DRS-PSB

Branch Chief (DRP/A) MIS System

Project Engineer (DRP/A) RIV File

, Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

T. Essig (NRR/DRPM/PERB)

i

DRS AI 9 7-G-0035

i

DOCUMENT NAME: R:_CP\CP704RP.GMG

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

SEPA:PSB _

E RS:PSB E C:PSB ,

E AD:DRS N AD:DRP cN

GMGood Q TAAndrews BMurray 9 KEBrockgan ff A_THowellQ/g

02g97 02h497 w Oj/[,/97 / ) ' [y

'

l02 @ 7 02/$977 >

.

ADiDRS N

KEBrfckngn g

oS{/97 # (/ A)

y OFHCIAL RECORD COPY

l