Rev 2 to Draft QA Procedure BQA-191, Field Verification Sampling PlanML20093L211 |
Person / Time |
---|
Site: |
Clinton |
---|
Issue date: |
05/16/1984 |
---|
From: |
BALDWIN ASSOCIATES |
---|
To: |
|
---|
Shared Package |
---|
ML20093L171 |
List: |
---|
References |
---|
BQA-191-DRFT, NUDOCS 8407310329 |
Download: ML20093L211 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20209E0551999-07-0606 July 1999 1999 Business Plan ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20199H2771999-01-20020 January 1999 Proposed Tech Specs Changing Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c,1.d,2.c & 2.d ML20206E6281998-12-31031 December 1998 Rev 17 to ODCM for Clinton Power Station ML20196A0941998-11-20020 November 1998 Proposed Tech Specs Re Div 3 Diesel Generator Droop Issue ML20196A1501998-11-20020 November 1998 Revised Pages Constituting Rev 3 to CPS TS Bases,Consisting of Pages Annotated with Rev Numbers 3-1,3-2,3-3,3-4 & 3-5. Changes to Text Identified with Rev Bars.No Rev Bars Included for Changes to Format ML20155A5631998-10-23023 October 1998 Proposed Tech Specs LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys U-603088, Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7)1998-10-0505 October 1998 Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) ML20153F4201998-09-23023 September 1998 Corrected Proposed Tech Specs Bases Page B 3.8-94 Re SVC Protection Sys ML20237E4191998-08-24024 August 1998 Proposed Tech Specs SR 3.8.1.17,revising Acceptance Criteria for Meeting ready-to-load Requirement for Division 3 DG ML20237C3501998-08-17017 August 1998 Proposed Tech Specs Partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability ML20236X0071998-07-31031 July 1998 Proposed Tech Specs,Revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 ML20236Q4661998-07-17017 July 1998 Rev 0 to Procedure 2800.93, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4651998-07-17017 July 1998 Rev 0 to Procedure 2800.92, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4571998-07-17017 July 1998 Rev 0 to Procedure 2800.91, Emergency Reserve Auxiliary Transformer Test ML20216B1511998-05-0404 May 1998 Proposed Tech Specs Pages,Incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS ML20217M3351998-04-27027 April 1998 Proposed Tech Specs Re Mgt Changes Occurring in Operations Organization at Plant ML20203D5651998-02-19019 February 1998 Plan for Excellence ML20212C6951997-10-23023 October 1997 Proposed Tech Specs,Constituting Rev 2 to CPS TS Bases.Rev Consists of Pages Annotated W/Rev Numbers 2-1 Through 2-14 ML20149J1701997-07-22022 July 1997 Proposed Tech Specs Requesting Exemption to 10CFR50,App a, General Design Criteria to Allow Operation W/Identified Offsite Circuit Condition ML20149H8991997-06-30030 June 1997 CPS Long Term Improvement Plan U-602714, Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation1997-04-0101 April 1997 Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation ML20133F2051997-01-0707 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A5951996-12-13013 December 1996 Proposed TSs Re Transfer of Minority Ownership ML20134M3181996-11-19019 November 1996 Proposed Tech Specs Revising Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis & Degraded Voltage Dropout - 4.16 Kv Basis, re-numbering Items in Table & Revising Associated Notes ML20128K0711996-10-0404 October 1996 Proposed Tech Specs 3.3.8.1,adding Action Statement & Note Requiring Restoration of Inoperable Degraded Voltage Relays, Rev to Table 3.3.8.1-1 ML20134C1631996-09-20020 September 1996 Proposed Tech Specs,Revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20116N1101996-08-15015 August 1996 Proposed Tech Specs 2.0, Safety Limits, Changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 U-602619, Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses1996-08-15015 August 1996 Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses U-602623, Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling1996-08-15015 August 1996 Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling ML20137A1101996-08-14014 August 1996 Rev 19 to App V Second 10-Yr Interval Pump & Valve Testing Program Plan ML20137A1021996-07-10010 July 1996 Rev 5 to App IV Second 10-Yr Interval Inservice Exam Plan ML20113E7261996-06-28028 June 1996 Proposed Tech Specs,Allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures1996-06-21021 June 1996 Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures ML20108C9431996-05-0101 May 1996 Proposed Tech Specs,Implementing 10CFR50,App J - Option B ML20107L0011996-04-19019 April 1996 Proposed Tech Specs,Revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met ML20100H8411996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20100H7901996-02-22022 February 1996 Proposed Tech Specs,Deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Changing TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function from 3762V & 3832V to 3876V ML20100H8171996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv ML20100H7741996-02-22022 February 1996 Proposed Tech Specs,Proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier ML20095G5141995-12-14014 December 1995 Proposed Tech Specs 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation to Eliminate Periodic Response Time Testing of Analog Trip Modules ML20095G6401995-12-14014 December 1995 Proposed Tech Specs Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys ML20095G4791995-12-14014 December 1995 Proposed Tech Specs 3.4.2, Flow Control Valves Re Proposed Deletion of Average Rate of Movement Verification Requirement ML20117E3001995-11-0606 November 1995 Rev 18 to App V Pump & Valve Testing Program Plan ML20094D2031995-10-27027 October 1995 Proposed Tech Specs,Consiting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 ML20094D2141995-10-27027 October 1995 Proposed Tech Specs,Consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions ML20085N0621995-06-23023 June 1995 Proposed Tech Specs Bases,Per TS 5.5.11, TS Bases Control Program ML20085F5961995-06-0909 June 1995 Proposed Tech Specs,Incorporating Description of Exclusion Area Boundary ML20087J5691995-05-17017 May 1995 Rev 17 to App V, Pump & Valve Testing Program Plan of CPS ISI Program Manual ML20085J9701995-02-16016 February 1995 Proposed Tech Specs Reflecting Enforcement Discretion Re TS LCO for Div 2 DC Electrical Power Sources 1999-07-06
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20209E0551999-07-0606 July 1999 1999 Business Plan ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20206E6281998-12-31031 December 1998 Rev 17 to ODCM for Clinton Power Station ML20236Q4661998-07-17017 July 1998 Rev 0 to Procedure 2800.93, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4651998-07-17017 July 1998 Rev 0 to Procedure 2800.92, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4571998-07-17017 July 1998 Rev 0 to Procedure 2800.91, Emergency Reserve Auxiliary Transformer Test ML20203D5651998-02-19019 February 1998 Plan for Excellence ML20149H8991997-06-30030 June 1997 CPS Long Term Improvement Plan ML20137A1101996-08-14014 August 1996 Rev 19 to App V Second 10-Yr Interval Pump & Valve Testing Program Plan ML20137A1021996-07-10010 July 1996 Rev 5 to App IV Second 10-Yr Interval Inservice Exam Plan ML20117E3001995-11-0606 November 1995 Rev 18 to App V Pump & Valve Testing Program Plan ML20087J5691995-05-17017 May 1995 Rev 17 to App V, Pump & Valve Testing Program Plan of CPS ISI Program Manual ML20064K5141993-10-11011 October 1993 Rev 16 to Apps Iii,Iv & V of Clinton Power Station ISI Program Manual ML20249A6601993-04-14014 April 1993 Revised ESA-102, Electrical Engineering Std for Electrical & Physical Characteristics of Class B Electrical Cables ML20126E4581992-11-30030 November 1992 Rev 13 to CPS IST Program,App III ML20096G5031992-04-30030 April 1992 Rev 0 to Clinton Power Station Raw Water Treatment & Enhancement Program ML20058L3371991-07-10010 July 1991 Rev 2 to Procedure Nragp 101-1, Nuclear Review & Audit Group Charter ML20082J1991991-02-28028 February 1991 Rev 7 to Odcm ML20059N2201990-08-31031 August 1990 Rev 8 to, Pump & Valve Testing Program Plan ML20006C2071989-12-31031 December 1989 Rev 6 to Odcm. ML20006A8321989-10-20020 October 1989 Rev 3 to Inservice Exam Plan. ML20236A5281989-02-28028 February 1989 Rev 5 to Odcm ML20151M7611988-07-29029 July 1988 Rev 2 to Inservice Exam Program Plan ML20196J5731988-03-0101 March 1988 Pump & Valve Testing Program Plan U-601006, Rev 3 to Pump & Valve Testing Program Plan & Summary of Changes1987-08-20020 August 1987 Rev 3 to Pump & Valve Testing Program Plan & Summary of Changes ML20234E0931987-06-30030 June 1987 Rev 2 to Pump & Valve Testing Program Plan ML20215M3511987-06-22022 June 1987 Revised Inservice Exam Program Plan for First 10-yr Interval ML20215K5701987-02-23023 February 1987 Rev 0 to Procedure Dcrdr 5.2, Verification of Implemented Human Engineering Discrepancy Corrections ML20212E9701987-02-0606 February 1987 Rev 8 to Station Operating Manual Maint Procedure 8451.02, Testing of Motor-Operated Valves Using Movats MOV Signature Analysis Sys ML20212E9611987-02-0606 February 1987 Rev 10 to Station Operating Manual Maint Procedure 8451.01, Preventive Maint for Motor-Operated Valves ML20213F3631986-10-31031 October 1986 Long-Term Inservice Exam Plan for Class 1,Class 2 & Class 3 Component Supports for Clinton Power Station,Unit 1, First 10-yr Interval Final Plan ML20213F3861986-09-30030 September 1986 Vols I & II to Long-Term Inservice Exam Plan for Class 1, Class 2 & Class 3 Piping & Components for Clinton Power Station,Unit 1, First 10-yr Interval Final Plan ML20213F3761986-09-30030 September 1986 Inservice Exam Program Plan ML20214P1141986-08-15015 August 1986 Rev 7 to Operating Manual Maint Procedure 8451.02, Testing of Motor-Operated Valves Using Movats Motor-Operated Valve Signature Analysis Sys U-600481, Rev 2 to Administrative Procedure 1888.00, Process Control Program1986-03-21021 March 1986 Rev 2 to Administrative Procedure 1888.00, Process Control Program U-600487, Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program1986-03-18018 March 1986 Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program ML20198S5391986-02-21021 February 1986 Rev 2 to Nuclear Station Engineering Instruction Nsei CS-4, UHS Monitoring. W/860522 Advance Instruction Change 1 ML20138Q0911985-11-30030 November 1985 Rev 1 to Offsite Dose Calculation Manual ML20138Q9831985-11-30030 November 1985 Inservice Insp Pump & Valve Testing Program ML20209H1541985-10-29029 October 1985 Rev 2 to Instruction PI-CP-079, Preparation,Review & Approval of Pump & Valve Operability Packages ML20209H1611985-10-29029 October 1985 Rev 3 to Nuclear Station Engineering Dept Procedure D.22, Engineering Interdisciplinary Review & Impact Assessment for Plant Mode ML20133N0461985-08-0707 August 1985 Rev 3 to Record Verification Program Plan,Clinton Power Station ML20134L8921985-07-31031 July 1985 Program for Compliance W/Tmi Action Plan Item I.G.1, `Training During Low Power Testing.' ML20134P8821985-07-0808 July 1985 Rev 1 to Procedure 1888.00, Process Control Sys. Addl Info Re ATI-VR-001-P-A, Associated Technologies,Inc Vol Reduction & Bitument Solidification Sys, Encl ML20133N7171985-06-28028 June 1985 Revised Emergency Plan Implementing Procedures,Including Rev 1 to AP-01, Organization & Preparation of Controlled Documents & Rev 1 to Document Control ML20128M0021985-06-14014 June 1985 Rev 0 to Procedure SPDS-DST-001, SPDS Dynamic Simulation Test Plan ML20126C5081985-04-30030 April 1985 Offsite Dose Calculation Manual ML20126B6741985-04-20020 April 1985 Emergency Plan Implementing Procedure EC-13, Reactor Core Damage Estimation ML20108B4601985-02-28028 February 1985 Preservice Insp Program ML20116M7781985-02-27027 February 1985 Rev 8 to Radiation Safety Program Augmentation CPS-1, Instructions for Augmenting United States Testing Co Radiation Safety Program at Clinton Power Station 1999-07-06
[Table view] |
Text
,-
ATTACHMENT 3
'n . ::. .
g CUALITY ASSURANCE REVISION PR003)URE PAUL 2 L D A B. D b"l D Cd
~
\ h 3 g @ @ Q d 'y g 3 (m . =
j BQA-191 - FIELD VERIFICATION SAMPLIIK
._m.
1 PAGE 0F 5 REVISION DATE DESCRIPTION
- APPROVAL DATE y.A. F2 Lwa 2 GENERAL REVISION (revised and rewritten) " U" 'Y[ 8'8 QiTS FW MG a f "yM 3 /+a' Q.A. F'.'JOW S QiTSFUCUCER 3% Q.A. FW MGER i
t)"(mb b. u .4 QiTS WCU6ER Q.A. FW GGER
.]y +, ri" <m, e,n r .- :,,.sn -
g
- y .;
- ; , ya .c.n, s,..\
- aQicsM. %a:- -
n ,p- I
, , , .. q .e4nh,3q u\/
au .a a .
a -a.aa u , a aa .Q. A. .wCwam a <
Q&TS FW aGER Q.A. LW uGER QsTS WCaGER Q. A. bWUCS yciTS F.G.Ga
)
8407310329 840618 Q. A. NdLbui'.
GPDR ADOCK 05000461 PDR QSTS FW MGER s.
t0FM JV 835 (4/82)
- y . , . . :n. . ' '
W . ':$ $$. yYN1
, 4 $Nb
[ CUAUTY ASSURANCE g PROCEDURE E0A 191' bkbbN N FIELD VERIFICATION 2 gggggy"" SAMPLING PL/d; pgg
. 1 CF I 1.0 PURPOSE This procedure provides the sample plans and nethods to be used in the Baldwin Associates (BA) Field Verification Program.
2.0 SCOPE This procedure applies to all safety related, augmented Class D, fire protection, and scismic HVAC systems, ite.s. or components and the exposed structural steel in the auxiliar,, fuel handling, containment, and control buildings per Reference 3.2.
3.0 REFERENCES
.3.1 Mil Std. 105D Sa:pling Procedures & Tables for Inspection by Attribute 3.2 BQA-190 Field Verification 3.3 BQA-193 Inaccessibic items l 3 . l. BAP-1.0 Nonconformances 3.5 BQA-194 Field verification of Turned-over Systems 3.6 BQA-195 Field Verification Document Tracking 3.7 BQA-196 Field Verification Evaluation Program l
4.0 DEFINITIONS l
4.1 Attribute - Characteristic of an iten, component, or unit of work which can be evaluated and deter =ined to be conforming or noncon-forcing with specified criteria.
i 4.2 Checklist - Document used for field verification containing those attributes to be verified or inspected. Checklists shall also list for each attribute the applicable acceptance criteria or tolerances.
4.3 Field Verification - Quality Assurance prograt, using approved l' proccoures and inspection checklists designed to review hardwarc for the purpose of determining conformance to requirements.
4.4 tot - Collection of itens from which a sample is drawn.
l 4.5 Noncenformances - Deficiency in characteristic which renders the s' '" ../;' ' "
. quality of an item unacceptabic or indeterminate. ..
'i W;$'
'. 4
. w, :
M y g ; w (( y; ._ m ;. . ,
- . ~ .
v -
.{.
CUALITY ASSURANCE g PROCEDURE boa 191 b kb FIELD VERIFICATION 2 g & n' s== r== m SAMPLING PLtd:
'D@w '
ZAs& d MD par
. ./
3\ OFI 4.6 Random - Objective process in which all ces being considered have an equal chance of selection. In the Field Verification program, randomness will be achieved by the use of random num-bers.
4.7 Sample Plan - The required sa=ple si::e for a given lot.
4.8 Traveler - Docu=ent listing work activitics to be performed and their sequence, scope, requirements, etc.
5.5 Turnover Packace (TOP) - Appropriate documentation provided for a system sub-system, area, etc. that lilinois Power Company Start-up has classified as a system or partial system for turn-over purposes.
5.12 Work Control Packace (WCP) - Docu=cntation which identifics work perior:cd and the inspection anc. acceptance of the work (travel-crs , d rawings , e tc. ) .
5.0 RESPONSIBILITIES 5.1 The Baldwin Associates Manager of Quality Assurance (MQA) is responsible for the i=ple=entation and overall ad=inistration of the Field Verificatica Program.
5.2 The Baldwin Associates Assistant Manager of Quality Assurance (AMQA) is responsible for implccentati3n of the Field Verifica-tion Program and for assigning qualified and certified personnel to these activitics.
5.3 The Baldwin Associates Senior QA Engineer - Field Verification (SQAE) is responsible for: ,,
. .i ,
5.3.1 Supervising personnel assigned to the Field Verification Progra= and for assigning personnel to perforn specific 1 tasks. !!
i!
5.3.2 Determining lot f ormation, size of sampic and Field !!
Verification Procedures and Checklists to be utilized. .
5.4 The Baldwin Associates Field Verification Engineer (FVE) is '
responsible for actual reverification, re-exa=inations, or reinspections using the appropriate procedures and checklists.
, . ; . . . q Qn's i '
'. -2 6&
>-^c M M. [ h. @W $
2 W%%MWw.m,
?. .
,- + . - n.
CUA!JTY ASSURANCE !
.g PROCEDURE EnA 191 FIFLD VERIFICATION 2 QQQQg"" SA!TLl?'G PLN; FME
_._ .v .- Imi 6.0 GE';ERAL 6.1 The sample plans contained in this precedure are derived from till-STD-105D, " Sampling Procedures and Tables for Inspection by Attributes" (Reference 3.1).
6.1.1 The plan for critical attributes shall ensure a 95%
confidence that 5% or less defcetive attributes exist in the unexn=ined portion of the population under evaluation.
6.1.2 The plan for non-critical attributes shall ensure 95%
confidence that 15% or less defective attributes exist in the unexamined portion of the population under evaluation.
.6. 2 Sa=ples will be drawn from defined lots consisting of one or more work control packages (travelers, drawings, etc.).
NOTE: When ite=s selected are found to be inaccessible. they vill be excluded from the sample and an alternate item selected.
6.3 For items or systems that have been turned over to Illinois Power Cc:pany (IPC), Field Verification vill require interface and coordination with the IPC Start-Up Coordinator in accordance with Reference 3.5.
6.4 Sampling is not permitted on lots retuYned to BAFV by the IPC Overinspection Progran for re-examination.
7.0 PROCEDL'RE 7.1 Upon receipt of the preliminary Turnover Package or determination of secpc of work the SQAE or his designec shall determine if sampling can be utilized based on the lot si:c and other criteria.
7.2 Lot si:e fer structural steel shall be deternined as follows.
7.2.1 The SQAE or his designec shall request structural drawings from the Document Control Center for the arca(s)/ build-ing(s). Lot si:c(s) may consist of the number of structural members in cach main framing elevation plus other members located within the building, but not on a main framing elevation:
NOTE:
?!ain structural framing elements include beams, girders, columns, purlins and girts. 111scellancaus f raming. .
z , -l. '
Calletysteelandstairwayswillnotbe'includedin 1, cope of Field Verification. d
. ,.t
'.',g,d$?..bfj@gg T 3GS.!W.YI2!/$E1ggd'3 t,q
I. r
. ,u-o .
~
CUAUTY ASSURANCE g PROCEDURE BOA 191 kb b FIELD VERIFICATI0::
SAHPb1 G L#Ui 2
$$.hhhyg"""] -
EA6E 3 l OF l
. ./
t 7.2.2 The lot size for structural steci in the contain=cnt building will be deter =ined by the number of structural cembers in the specific quadrant, including all framing elevations.
7.3 Lot size for electrical cabic tray, conduit, and supports shall consist of all elements relating to raceways and supports within a specific building /arca/cicvation.
7.4 If sampling is to be perforned, the SQAE shall determine the required sampic si:c for each lot from Exhibit 1.
7.5 Itens to be inspected will be scleatcJ from the lot using random nu=bers. A number of alternates, designated by the letter "A" shall also be sc1ceted in case some of the original sa ple items are fotind to be inaccessible or unavailable for inspection. The ecthod of selection used shall be noted on the system completion letter.
7.6 Perfor= field verification of selected items in accordance with References 3.2 and 3.6.
l
) 7.7 Inaccessible items shall be documented per Pcierence 3.3.
i I
7.S Docu ent all nonconfor:anccs in'acccrdance with Reference 3.4. ,
l 7.9 The results of the fic1d verification @fforts shall be processed and evaluated in accordance with Reference 3.7.
8.0 ErdI3ITS s
f1-Sa:ple Plan l ,
i L
I
,7, ,,p .;W. i 4
..d t'.m[.k.h.gng .- h .m I 7.
l
, ., p s CUAUTY ASSURANCE PROCEDURE BOA 191 g
Q 7) i
/y} '
g{ggg FIELD VERIFICATIO:
SMJ' LII;C PLM; REV. 2 eL".
. . /-
hhhhh]M DRAFT FAGr-l OF l EXillBIT #1 (pg. 1 of 1)
SM'PLE PLM; Lot Size Sa.ple Site 2-50 All 51-500 50 501'-1200 SO 1201-3200 125
, 3201-10,000 200 10.000-35,000 315 t
, .E, '
'fa,;hsUhblQdi3Ik c , ,
i
, 4. :/s 9,2 +,'i??.-lQg 4'f3 g .. ,,, ,
y -- -- ha q w . m a w <& 4