Proposed Tech Specs 2.0, Safety Limits, Changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7
ML20116N110
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/15/1996
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20116N085 List:
References
NUDOCS 9608210248
Download: ML20116N110 (1)


Text

_ _ _ _ - _ _ _ _ _ _ _ - _ - _ - _ - _ _ _ _ _ _ _ _ - _ - _ -

Attachmsnt 3 to U-602624 I NS-96-004 Page 1 of 1 SLs 2.0 2.0 3AFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:

THERMAL POWER shall be s 25% RTP.

2.1.1'. 2 With the reactor steam done pressure m 785 psig and core flow a 10% rate - flow:

l'. o9 MCPR 1 be 4,# or two recirculation loop operation or bree for s g e. recirculation loop operation.

i.10 ]

2.1.1.3 Reac or vessel water level shall be greater than the top of active irradiated fuel.

2.1.2 ' Reactor Coolant System Pressure SL Reactor steam dome pressure shall be s 1325 psig'. ,

2.2 SL Violations With any SL violation, the following actions shall be completed:.

2.2.1 Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

2.2.2.1 Restore compiiance with all SLs; and 2.2.2.2 Insert all insertable control rods.

2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the plant manager and the corporate executive responsible for overall plant nuclear safety.

(continued)

CLINTON 2.0-1 Amendment No. 9608210248 960815

. DR ADOCK0500g1 i