Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7)
ML20154H803
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/05/1998
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20154H802 List:
References
U-603088, NUDOCS 9810150005
Download: ML20154H803 (2)


Text

. ~ . . ._. . - . ~ ..-..-- ._.- - - -.. -. - . - .. -.. - . -.~ ... .~ .

4 Attachment 3 to U-603088 Page 1 of 2 ,

t i

L

?

Marked-Up Page from the Technical Specifications 3

t 1

I P

i 1

f

?

i

,L 4

- l

' 9810150005 9910057 DR ADOCK 0 1

(

._m.. __ _ . _ _ . . _ . _ - . - . _ . _ _ _ _ . . _ _ _ . .

Attachment 3

  • to U-603088 Page 2 of 2 Programs and Manuals 5.5

-('

.. 5 .'5 Programs and Manuals (continued) 5.5.13 Primary Containment leakaae Rate Testina Proaram 4

1 M "4{g,j A program shall be established to implement the leakage rate testing of the primary containac ' as required by 10 CFR 50.54(o) 4(v;, - and 10 CFR 50, Appendix J, Option B, as modified by approved

  • exemptions. This program shall be in accordance with the '

4  %.,,I> guidelines' contained in Regulatory Guide 1.163, " Performance-Based

""b'"S* O Containment Leak-Test Program," dated September 1995,(except thaINif.

W Bechtel Topical Report BN-10P-1 is also an acceptatsle option for '

performance of Type A tests.

-. )

1 y g g , lhe peak calculated containment internal pressure for the design 6 basis loss of coolant accident, P,, is 9.0 rsig.

btkierale The maximum allowable primary containment leakage rate, L,, at P,,

v

+ashog d shall be 0.65% of primary containment air weight per day primbe3 Leakage Rate acceptance criteria are:

Nfalement penetra%)on a. Primary containment leakage rate acceptance criterion is s 1.0 L,. During the first unit startup following testing

'N in accordance with this program, the leakage rate acceptance tog be } criteria are s 0.60 L, for th. Type B and Type C tests and s 0.75 L, for Tyne A tests;.

IbtNerreb )d

) 'unfd the, f- b. Air lock testing acceptance criteria are:

D**b 1) - Overall air lock leakage rate is s 5 scfh wh'en tested  !

I at 1. P,,

P3 M mf l h 2) For each door, leakage rate is s 5 scfli when the gap between door seals is pressurized to 2 P,.

The provisions of SR 3.0.2 do not apply to the test frequencies

.specified in the Primary Containment Leakage Rate Testing Program.

The provisions of SR 3.0.3 are applicable to the Primary Containment Leakage Rate Testing Prograta.

1 o ,

i l

I CLINTON 5.0-16a Amendment No. l .

l  :

o ,