Issue date | Title | Topic | |
---|---|---|---|
ML20209E055 | 6 July 1999 | 1999 Business Plan | Safe Shutdown Maintenance Rule Program Downpower |
ML20206F223 | 27 April 1999 | NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station | Safe Shutdown Fitness for Duty Systematic Assessment of Licensee Performance Unidentified leakage |
ML20199H277 | 20 January 1999 | Proposed Tech Specs Changing Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c,1.d,2.c & 2.d | Safe Shutdown Offsite Circuit Overspeed trip Overspeed |
ML20206E628 | 31 December 1998 | Rev 17 to ODCM for Clinton Power Station | Time of Discovery Ultimate heat sink Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report Power change Loss of condenser vacuum |
ML20196A094 | 20 November 1998 | Proposed Tech Specs Re Div 3 Diesel Generator Droop Issue | Safe Shutdown Offsite Circuit Overspeed trip |
ML20196A150 | 20 November 1998 | Revised Pages Constituting Rev 3 to CPS TS Bases,Consisting of Pages Annotated with Rev Numbers 3-1,3-2,3-3,3-4 & 3-5. Changes to Text Identified with Rev Bars.No Rev Bars Included for Changes to Format | Safe Shutdown High Radiation Area Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Qualified Offsite Circuit Offsite Circuit Unidentified leakage Operational leakage |
ML20155A563 | 23 October 1998 | Proposed Tech Specs LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys | Safe Shutdown Power-Operated Valves |
U-603088, Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) | 5 October 1998 | Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) | |
ML20153F420 | 23 September 1998 | Corrected Proposed Tech Specs Bases Page B 3.8-94 Re SVC Protection Sys | Probabilistic Risk Assessment |
ML20237E419 | 24 August 1998 | Proposed Tech Specs SR 3.8.1.17,revising Acceptance Criteria for Meeting ready-to-load Requirement for Division 3 DG | Overspeed |
ML20237C350 | 17 August 1998 | Proposed Tech Specs Partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability | Safe Shutdown Offsite Circuit Overspeed trip |
ML20236X007 | 31 July 1998 | Proposed Tech Specs,Revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 | Offsite Circuit Overspeed trip |
ML20236Q466 | 17 July 1998 | Rev 0 to Procedure 2800.93, Emergency Reserve Auxiliary Transformer Integrated Test | |
ML20236Q465 | 17 July 1998 | Rev 0 to Procedure 2800.92, Emergency Reserve Auxiliary Transformer Integrated Test | Temporary Modification |
ML20236Q457 | 17 July 1998 | Rev 0 to Procedure 2800.91, Emergency Reserve Auxiliary Transformer Test | Temporary Modification |
ML20216B151 | 4 May 1998 | Proposed Tech Specs Pages,Incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Qualified Offsite Circuit Offsite Circuit |
ML20217M335 | 27 April 1998 | Proposed Tech Specs Re Mgt Changes Occurring in Operations Organization at Plant | |
ML20203D565 | 19 February 1998 | Plan for Excellence | |
ML20212C695 | 23 October 1997 | Proposed Tech Specs,Constituting Rev 2 to CPS TS Bases.Rev Consists of Pages Annotated W/Rev Numbers 2-1 Through 2-14 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic High Energy Line Break Scram Discharge Volume Excess Flow Check Valve Offsite Circuit Unidentified leakage Operational leakage Control Room Habitability |
ML20149J170 | 22 July 1997 | Proposed Tech Specs Requesting Exemption to 10CFR50,App a, General Design Criteria to Allow Operation W/Identified Offsite Circuit Condition | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Offsite Circuit |
ML20149H899 | 30 June 1997 | CPS Long Term Improvement Plan | Enforcement Discretion Temporary Modification Foreign Material Exclusion Process Control Program Operability Assessment |
U-602714, Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation | 1 April 1997 | Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation | |
ML20133F205 | 7 January 1997 | Proposed Tech Specs 2.0 Re Safety Limits | Process Control Program |
ML20133A595 | 13 December 1996 | Proposed TSs Re Transfer of Minority Ownership | Safeguards Contingency Plan Fire Protection Program |
ML20134M318 | 19 November 1996 | Proposed Tech Specs Revising Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis & Degraded Voltage Dropout - 4.16 Kv Basis, re-numbering Items in Table & Revising Associated Notes | Safe Shutdown Offsite Circuit Overspeed trip |
ML20128K071 | 4 October 1996 | Proposed Tech Specs 3.3.8.1,adding Action Statement & Note Requiring Restoration of Inoperable Degraded Voltage Relays, Rev to Table 3.3.8.1-1 | |
ML20134C163 | 20 September 1996 | Proposed Tech Specs,Revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months | |
ML20116N110 | 15 August 1996 | Proposed Tech Specs 2.0, Safety Limits, Changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 | |
U-602619, Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses | 15 August 1996 | Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses | High Radiation Area Deep Dose Equivalent |
U-602623, Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling | 15 August 1996 | Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling | Shutdown Margin |
ML20137A110 | 14 August 1996 | Rev 19 to App V Second 10-Yr Interval Pump & Valve Testing Program Plan | Stroke time Power-Operated Valves |
ML20137A102 | 10 July 1996 | Rev 5 to App IV Second 10-Yr Interval Inservice Exam Plan | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Feedwater Heater Scram Discharge Volume Intergranular Stress Corrosion Cracking Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML20113E726 | 28 June 1996 | Proposed Tech Specs,Allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable | High Radiation Area |
U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures | 21 June 1996 | Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures | High Radiation Area Deep Dose Equivalent |
ML20108C943 | 1 May 1996 | Proposed Tech Specs,Implementing 10CFR50,App J - Option B | Ultimate heat sink Excess Flow Check Valve Safeguards Contingency Plan Fire Protection Program |
ML20107L001 | 19 April 1996 | Proposed Tech Specs,Revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met | Stroke time Fuel cladding |
ML20100H841 | 22 February 1996 | Proposed Tech Specs,Changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months | |
ML20100H790 | 22 February 1996 | Proposed Tech Specs,Deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Changing TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function from 3762V & 3832V to 3876V | Safe Shutdown Offsite Circuit Overspeed trip |
ML20100H817 | 22 February 1996 | Proposed Tech Specs,Changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv | Anticipated operational occurrence Hydrostatic |
ML20100H774 | 22 February 1996 | Proposed Tech Specs,Proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier | High Radiation Area Stroke time High Energy Line Break |
ML20095G514 | 14 December 1995 | Proposed Tech Specs 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation to Eliminate Periodic Response Time Testing of Analog Trip Modules | |
ML20095G640 | 14 December 1995 | Proposed Tech Specs Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys | |
ML20095G479 | 14 December 1995 | Proposed Tech Specs 3.4.2, Flow Control Valves Re Proposed Deletion of Average Rate of Movement Verification Requirement | |
ML20117E300 | 6 November 1995 | Rev 18 to App V Pump & Valve Testing Program Plan | Stroke time Excess Flow Check Valve Power Operated Valves |
ML20094D203 | 27 October 1995 | Proposed Tech Specs,Consiting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 | Scram Discharge Volume Overtravel |
ML20094D214 | 27 October 1995 | Proposed Tech Specs,Consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions | |
ML20085N062 | 23 June 1995 | Proposed Tech Specs Bases,Per TS 5.5.11, TS Bases Control Program | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Stroke time Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment High Energy Line Break Scram Discharge Volume Overtravel Fuel cladding Offsite Circuit Unidentified leakage Overspeed trip Subsequent actuation Operational leakage |
ML20085F596 | 9 June 1995 | Proposed Tech Specs,Incorporating Description of Exclusion Area Boundary | Water rod |
ML20087J569 | 17 May 1995 | Rev 17 to App V, Pump & Valve Testing Program Plan of CPS ISI Program Manual | Stroke time Excess Flow Check Valve |
ML20085J970 | 16 February 1995 | Proposed Tech Specs Reflecting Enforcement Discretion Re TS LCO for Div 2 DC Electrical Power Sources | Enforcement Discretion |