ML20209E055 | 6 July 1999 | 1999 Business Plan | Safe Shutdown Maintenance Rule Program Downpower |
ML20206F223 | 27 April 1999 | NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station | Safe Shutdown Fitness for Duty Systematic Assessment of Licensee Performance |
ML20206E628 | 31 December 1998 | Rev 17 to ODCM for Clinton Power Station | Time of Discovery Ultimate heat sink Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report Power change |
ML20236Q466 | 17 July 1998 | Rev 0 to Procedure 2800.93, Emergency Reserve Auxiliary Transformer Integrated Test | |
ML20236Q465 | 17 July 1998 | Rev 0 to Procedure 2800.92, Emergency Reserve Auxiliary Transformer Integrated Test | Temporary Modification |
ML20236Q457 | 17 July 1998 | Rev 0 to Procedure 2800.91, Emergency Reserve Auxiliary Transformer Test | Temporary Modification |
ML20203D565 | 19 February 1998 | Plan for Excellence | |
ML20149H899 | 30 June 1997 | CPS Long Term Improvement Plan | Enforcement Discretion Temporary Modification Foreign Material Exclusion Process Control Program |
ML20137A110 | 14 August 1996 | Rev 19 to App V Second 10-Yr Interval Pump & Valve Testing Program Plan | Stroke time Power-Operated Valves |
ML20137A102 | 10 July 1996 | Rev 5 to App IV Second 10-Yr Interval Inservice Exam Plan | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Scram Discharge Volume Liquid penetrant Dissimilar Metal Weld |
ML20117E300 | 6 November 1995 | Rev 18 to App V Pump & Valve Testing Program Plan | Stroke time Power Operated Valves |
ML20087J569 | 17 May 1995 | Rev 17 to App V, Pump & Valve Testing Program Plan of CPS ISI Program Manual | Stroke time |
ML20064K514 | 11 October 1993 | Rev 16 to Apps Iii,Iv & V of Clinton Power Station ISI Program Manual | Safe Shutdown Stroke time |
ML20249A660 | 14 April 1993 | Revised ESA-102, Electrical Engineering Std for Electrical & Physical Characteristics of Class B Electrical Cables | |
ML20126E458 | 30 November 1992 | Rev 13 to CPS IST Program,App III | |
ML20096G503 | 30 April 1992 | Rev 0 to Clinton Power Station Raw Water Treatment & Enhancement Program | Temporary Modification Zebra Mussel Biofouling |
ML20058L337 | 10 July 1991 | Rev 2 to Procedure Nragp 101-1, Nuclear Review & Audit Group Charter | Offsite Dose Calculation Manual Process Control Program |
ML20082J199 | 28 February 1991 | Rev 7 to Odcm | Ultimate heat sink Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report Power change |
ML20059N220 | 31 August 1990 | Rev 8 to, Pump & Valve Testing Program Plan | Stroke time |
ML20006C207 | 31 December 1989 | Rev 6 to Odcm. | Ultimate heat sink Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report Power change |
ML20006A832 | 20 October 1989 | Rev 3 to Inservice Exam Plan. | |
ML20236A528 | 28 February 1989 | Rev 5 to Odcm | |
ML20151M761 | 29 July 1988 | Rev 2 to Inservice Exam Program Plan | Hydrostatic Nondestructive Examination VT-2 Scram Discharge Volume Liquid penetrant Dissimilar Metal Weld |
ML20196J573 | 1 March 1988 | Pump & Valve Testing Program Plan | |
U-601006, Rev 3 to Pump & Valve Testing Program Plan & Summary of Changes | 20 August 1987 | Rev 3 to Pump & Valve Testing Program Plan & Summary of Changes | Safe Shutdown Stroke time Power Operated Valves |
ML20234E093 | 30 June 1987 | Rev 2 to Pump & Valve Testing Program Plan | |
ML20215M351 | 22 June 1987 | Revised Inservice Exam Program Plan for First 10-yr Interval | Coatings Nondestructive Examination VT-2 Liquid penetrant |
ML20215K570 | 23 February 1987 | Rev 0 to Procedure Dcrdr 5.2, Verification of Implemented Human Engineering Discrepancy Corrections | |
ML20212E970 | 6 February 1987 | Rev 8 to Station Operating Manual Maint Procedure 8451.02, Testing of Motor-Operated Valves Using Movats MOV Signature Analysis Sys | Stroke time |
ML20212E961 | 6 February 1987 | Rev 10 to Station Operating Manual Maint Procedure 8451.01, Preventive Maint for Motor-Operated Valves | |
ML20213F363 | 31 October 1986 | Long-Term Inservice Exam Plan for Class 1,Class 2 & Class 3 Component Supports for Clinton Power Station,Unit 1, First 10-yr Interval Final Plan | |
ML20213F386 | 30 September 1986 | Vols I & II to Long-Term Inservice Exam Plan for Class 1, Class 2 & Class 3 Piping & Components for Clinton Power Station,Unit 1, First 10-yr Interval Final Plan | Nondestructive Examination VT-2 Liquid penetrant |
ML20213F376 | 30 September 1986 | Inservice Exam Program Plan | Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML20214P114 | 15 August 1986 | Rev 7 to Operating Manual Maint Procedure 8451.02, Testing of Motor-Operated Valves Using Movats Motor-Operated Valve Signature Analysis Sys | Stroke time |
U-600481, Rev 2 to Administrative Procedure 1888.00, Process Control Program | 21 March 1986 | Rev 2 to Administrative Procedure 1888.00, Process Control Program | Boric Acid Process Control Program |
U-600487, Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program | 18 March 1986 | Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program | Stroke time |
ML20198S539 | 21 February 1986 | Rev 2 to Nuclear Station Engineering Instruction Nsei CS-4, UHS Monitoring. W/860522 Advance Instruction Change 1 | Safe Shutdown Ultimate heat sink Operating Basis Earthquake Earthquake |
ML20138Q091 | 30 November 1985 | Rev 1 to Offsite Dose Calculation Manual | Ultimate heat sink Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report |
ML20138Q983 | 30 November 1985 | Inservice Insp Pump & Valve Testing Program | High Radiation Area Stroke time Power Operated Valves |
ML20209H154 | 29 October 1985 | Rev 2 to Instruction PI-CP-079, Preparation,Review & Approval of Pump & Valve Operability Packages | Hydrostatic Coatings Anchor Darling |
ML20209H161 | 29 October 1985 | Rev 3 to Nuclear Station Engineering Dept Procedure D.22, Engineering Interdisciplinary Review & Impact Assessment for Plant Mode | |
ML20133N046 | 7 August 1985 | Rev 3 to Record Verification Program Plan,Clinton Power Station | |
ML20134L892 | 31 July 1985 | Program for Compliance W/Tmi Action Plan Item I.G.1, `Training During Low Power Testing.' | Shutdown Margin Unidentified leakage |
ML20134P882 | 8 July 1985 | Rev 1 to Procedure 1888.00, Process Control Sys. Addl Info Re ATI-VR-001-P-A, Associated Technologies,Inc Vol Reduction & Bitument Solidification Sys, Encl | Process Control Program |
ML20133N717 | 28 June 1985 | Revised Emergency Plan Implementing Procedures,Including Rev 1 to AP-01, Organization & Preparation of Controlled Documents & Rev 1 to Document Control | |
ML20128M002 | 14 June 1985 | Rev 0 to Procedure SPDS-DST-001, SPDS Dynamic Simulation Test Plan | |
ML20126C508 | 30 April 1985 | Offsite Dose Calculation Manual | Ultimate heat sink Grab sample Offsite Dose Calculation Manual |
ML20126B674 | 20 April 1985 | Emergency Plan Implementing Procedure EC-13, Reactor Core Damage Estimation | Reactor Vessel Water Level Fuel cladding |
ML20108B460 | 28 February 1985 | Preservice Insp Program | |
ML20116M778 | 27 February 1985 | Rev 8 to Radiation Safety Program Augmentation CPS-1, Instructions for Augmenting United States Testing Co Radiation Safety Program at Clinton Power Station | High Radiation Area Scaffolding |