, ATTACHMENT 1 l

. l'. .D

$ ILLINOIS POWER COMPANY QAI - 710.08 QUALITY ASSURANCE INSTRUCTIONS Revision 3 l TITLE: OVERINSPECTION SAMPLE PLAN Scope of Revision:

Revision 3: Major rewrite - rewritten because the number of items / attributes to be overinspected are not known prior to the actual inspection.

Sample size by traveler / item listings have been chosen using a minimum sample dictated by MIL-STD-105D. Accept / Reject criteria now in QAI 710.09 QAI 710.08A01 Revised. QAI 710.08A02 Deleted.

,QAI 710.08F01, 710.08F02, 710.08F03 superceded by QAI 710.08F04.

,. f $~ f?i' *

.a a \;u m.1n w{,

a .;p[Y\  :.:

.1

'# h O u du 3 d D Y.i ,Jijij

.a., !g: .;) b' ,

f?i\ q My u \

't h

c SIGNATURES Rev. 3 Rev. 4 Rev. 5 Prepared by: , /ghd Superviaor of Welding, ND F and Testing. '

g-((~4 #

Sopervisor of Quality Engineering, j

rf QA Jg4 _ -

/

8407310322 840618 PDR ADOCK 05000461 G PDR L Manager - QA Approval:

Approval Date:

N100-183 (3/03)

p ILLINOIS POWER COMPANY QAI- 710.08 QUALITY ASSURANCE INSTRUCTION Revision

{"

1.0 PURPOSE / SCOPE 1.1 Purpose This instruction provides the sample plans and methods to be used in the Illinois Power (IP) Company Overinspection Program.

1.2 Scope This instruction applies to all installed safety related, augmented Class D, fire protection, and seismic HVAC sys-tems, items, or components.

2.0 DISCUSSION / DEFINITIONS 2.1 Discussion 2.1.1 The sample plans contained in this instruction are derived from MIL-STD-105D, " Sampling Procedures and Tables for Inspection by Attributes" (Reference 6.1).

f

( 2.1.2 The results obtained using these sample plans vill be evaluated in accordance with Reference 6.7.

2.2 Definitions 2.2.1 Lot: Collection of items from which a sample is drawn.

For the Overinspection program, the lot may be developed from travellcrs in a Turnover Package, items in a spec-ified ari a or system, groups of like items such as large bore pipe hangers, or small bore pipe, conduit, etc.

2.2.2 Master Lot Number: A number assigned by IP Overinspection to a let.made up of one or more Balduin Associates' (BA) lot (s) to assure traceability betueen IP and BA lots.

2.2.3 Monconformance

Deficiency in characteristic which renders the quality of an item unacceptable or indetermi-nate.

2.2.4 Overinspection

Program to provide additional inspection of previously verified items.

2.2.5 Random

Obj ective process in uhich all items being considered have an equal chance of selection. In the N100-184 (12-79) Page 1 5 of

ILLINOIS POWER COMPANY QAI- 710.08 QUALITY ASSURANCE INSTRUCTION Revision

{

overinspection program, randomness vill be achieved by the use of randon numbers.

2.2.6 Sample Plan: The required sample size for a given lot (Appendix 7.1).

2.2.7 Traveler

Document listing vork activities to be per-formed, their sequence, scope, requirements, etc.

2.2.8 Turnover Package: Appropriate documentation provided for a systeu, sub-system, area, etc. designated for turnover as a unit.

3.0 RESPONSIBILITIES 3.1 The Supervisor - Helding, NDE and Testing is responsible for the implementation of the Overinspection Program.

3.2 The Area Overinspection Supervisor (AOIS) reports to the Supervisor - Welding, NDE and Testing and is responsible tor:

( a. training of personnel implementing this QAI

b. verification of Overinspection Sample Plans 3.3 The Discipline Overinspection Supervisor (DOIS) reports to the AOIS and is responsible for:
a. preparation of Overinspection Sample Plans
b. determining the applicable Checklist (s)
c. assignment of inspection personnel
d. revicu and approval of completed inspection reports and checklists.

4.0 IMSTRUCTIONS 4.1 Baldwin Associates (BA) shall transmit a report of the results of their field verification inspections of each lot ,

submitted to Illinois Power Supervisor-Uelding, NDE and l Testing for Overinspection. The report shall define the following:

N100-184 (12-79) Page 2 og 5

e ,

ILLINOIS POWER COMPANY QAI- 710.08 QUALITY ASSURANCE INSTRUCTION Revision Identification of the lot inspected.

Traveler numbers Component numbers Inaccessible items UCRs initiated.

4.2 The Supervisor - Welding, NDE and Testing shall then foruard the Field Verification Report to the AOIS for action by the appropriate DOIS, who will initiate the Overinspection Sample Plan Form, Appendix 7.2. The DOIS shall obtain a Master Lot number from the Overinspection QA Analyst in accordance with Reference 6.3.

HOTE 1 Identification of lots and the population of the lot may be provided by BA prior to completion of BA inspections in order to allow IP to determine sample size and develop inspection packages.

r

\. NOTE 2 Lots submitted by BA that are comprised of items in the same discipline (electrical, HVAC, etc.) may be combined as approved by the Supervisor - Helding, NDE and Testing.

4.3 The DOIS shall determine which drawing (s) (design / supplier detailed drauings) are required, initiate and transmit a Request for Documents, Form JV-319(BA), to the BA Document Control Center for the required drawing (s).

All drawings utilized in the Overinspection prccess shall be marked with the Overinspection Report number and Master Lot number.

4.4 If sampling is to be perforned, the DOIS will identify the travelers or items that constitute the lot population.

Travelers or itene to be inspected will be selected using random numbers generated by a computer. The number of selections will be determined by utilizing the Overin-spection Sample Plan Table, Appendix 7.1. The selected samples shall be identified by circling the item on the lot identification document. A number of alternates, designated by the letter 'A' shall be identified in case some of the circled samples are found to be inaccessible or unavailable k N100-184 (12-79)

Page 3 og 5

ILLINOIS POWER COMPANY QAI- 710.08 QUALITY ASSURANCE INSTRUCTION Revision

(

for inspection due to additional work being performed on the item.

NOTE: The Supervisor - Uelding, NDE and Testing may option-ally determine to perform 100% overinspection of a lot.

4.5 The DOIS will obtain the applicabic Checklist Instructions and Checklist for each category and type inspection required, and record these on the Sample Plan.

4.6 The DOIS will foruard the completed Overinspection Sample Plan to the AOIS for verification. If the Master Lot is made up of more than one BAFV lot, the AOIS shall obtain the signature of the Supervisor - Welding, NDE and Testing.

4.7 If the system structure or component has been turned over to Illinois Power, interface with Plant Staff in accordance with Reference 6.4.

4.8 Physically locate items requiring inspection. If required, request craft support for scaffolding, cleaning, paint removal, etc. in accordance with Reference 6.5.

4.9 Perform inspection of selected items in accordance with the appropriate checklist instructions. Document results on the Overinspection Report, Checklists, and drawings as required in accordance uith Reference 6.2. .

4.10 Document all Nonconformances in actordance with Reference 6.6.

4.11 Initiate the evaluation process for e~ach Lot Overinspection Repcrt in accordance with Reference 6.7.

4.12 Transmit the Lot Overinspcction Report and associated documents generated in accordance with this OAI to the CPS Central File in accordance uith Reference 6.8.

5.0 RECORDS 3.1 Records generated a*s a result of overinspection activities shall be processed in accordance with Reference 6.8.

5.2 Overinspection documents are designated Record Type 4126.6-L.

N100-184 (12-79) Page 4 or 5

l ILLINOIS POWER COMPANY QAI- 710.08 QUALITY ASSURANCE INSTRUCTION Revision 3

{ _

6.0 REFERENCES

6.1 MIL-STD-105 D, Change Notice 2, 20 March 1964, Titled:

sal!PLING PROCEDURE AND TABLES FOR INSPECTION BY ATTRIBUTES 6.2 QAI-710.01 OVERINSPECTION PROGRAll 6.3 QAI-710.02 OVERINSPECTION DOCUt1ENTATION IDENTIFICATION, ISSUING AND TRACKING 6.4 QAI-710.03 IP PLANT STAFF IIITERFACE 6.5 QAI-710.04 OVERINSPECTION CRAFT SUPPORT REQUEST 6.6 QAI-710.06 OVERINSPECTION NONCONFORMANCE INSTRUCTION

. 6.7 QAI-710.09 OVERINSPECTION EVALUATION PROGRM1 6.8 QAP-117.01 RECORDS CONTROL 7.0 APPENDICES / DOCUMENTS:

(s 7.1 QAl-710.08A01 Overinspection Scaple Plan Table 7.2 QAI-710.08F04 Overinspection Sample Plan (Combined)

N100-184 (12-79) Page 5 or 5 1

i

I

,e 710. 03 A01

, OVERINSPECTION SAMPLE PLAll TABLE O^I-Revision 2 Date _ j l

. Population Sample Size Size N n 2-50 ALL 51-500 50 501-1200 80 1201-3200 125 3201-10,000 200 10,001-35,000 315 N100-183 (12-79) Page of

9

  • QAI- 71o_ngpos ILLIN0IS POUER COMPANY Revision n QUALITY ASSURANCE DEPARTMENT OVERIMSPECTION SAMPLE PLAN Date M Mechanical HVAC Master Lot Number S Structural E Electrical 0 Other Balduin Associates Field Verification Defined Lot Numbers Category Mechanical: [ Large and small bore piping {_HVACPiping supports / hangers

-~

Mechanical equipment --

~~

Instrunentation Other Structural: Structural steel Other Electrical: [] Electrical hangers / conduit ] Cable terminacion raceway

[] Electrical equipment Instrumentation Cable Routing / Termination (Electrical / mechanical)

Other Other:

Uumber of travellers in lot Required sample size Applicable Checklist Procedure (s), Checklist (s) and Revision Number OAI-710- QAl-710-QAI-710- QAI-710-QAI-710- ,

QAI-710-QAl-710- QAI-710-Reuarks:

Sample Plan Prepared by Date DOIS Signature Verified by Date AOIS Signature Approved by Date Supervisor-Welding, NDE &

Testing (as required by para. 4.6) 1:100 185 (12-79) Page of_ ,