Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
I M Trenone ot2i me;o Nuaw cmue P O Dow 4 Shmpmgp;#t PA 1$O7/-0004 ;
SepteM;er 9, 1992 Beaver Valley Power Station Ur.it 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatinct Repgrt U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is sutnitted for Unit 1 and Unit 2 for the month of August, 1992.
Very truly yours, ,
1 i h
. U. Sleber Vice President Nuclear Group DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA 9209140338 920831 PDR ADOCK 05000344 PDR
/p 1 R i
(
11ARRATIVE SLMRRY OF MotTIHLY OPERATTNG D:PERIDICE UNIT 1 AUGUST 1992 August 1 he Unit continued load following at approximately 70% output as initiated in the previous month. At 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> the Unit comenced a further load reduction to approximtely 54% output while continuing to load follow.
August 2 'Ihe Unit continued to operate at approxirately 54% output.
August 3 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the Unit comenced a power increase to 100%
output. A nominal value of 100% output was achieved at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />.
August 4 % e Unit operated at a nominal value of 100% output, through August 6 August 7 At 0023 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> the Unit reduced output to approximately 90% for erd of cycle fuel stretchout. At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit commenced a reduction in output to approximately 50% to load follow.
August 8 'Ihe Unit continued to operate at approximately 50% output through while load following.
August 9 August 10 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit commenced a power increase to 90%
output. Approximately 90% output was' achieved at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> as end of cycle fuel stretchout continued.
August 11 'Ihe Unit continued to operate at approximately 90% output for through end of cycle fuel stretchout.
August 21 August 22 At 0013 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> the Unit commenced a reduction in output to approximately 50% to load follow.
August 23 'Ihe Unit continued to operate at approximately 50% output while load following.
August 24 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Unit commenced a power increase to 90%
output. Approximtely 90% output was achieved ~
at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> as erd of cycle fuel stretchout continued.
August 25 'Ihe Unit continued to operate at approxirately 90% output for end of cycle fuel stretchout. At 2020 hours0.0234 days <br />0.561 hours <br />0.00334 weeks <br />7.6861e-4 months <br /> the Rcd Position Ind*. cation for Control Rod K-8 was declared inoperable as a result of fluctuating between 228 and 210 steps.
IF6RATIVE SUt@%RY OF MotIIHLY OPERATI!1G EXPERIDJCE UNIT 1 S AUGUST 1992 (continued)
August 26 he ~ Unit continued -to operate at approxirately 90% output for end of cycle fuel stretchout.
August 27 he- Unit continued to operate at approxirately 90% output for end of cycle fuel stretchout. At 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> the Rod Position.
Indication for Control Rod K-8 was declared operable.
.f August-28 he Unit continued- to operate at approximately.90% output for end of cycle fuel stretchout.
August 29 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit- commenced a reduction:in output to approximately 50%-to lead-follcw.
August 30 he Unit continued to operate at approximately.50%' output.while load following.- At 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br /> the Rcd Position Indication for Control Rod' K-2 was declared inoperable when prirary voltage readings could not be obtained. At 0907 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.451135e-4 months <br /> control Rod'K was- declared operable based on a satisfactory primary voltage readiry.
August 31 At 0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> --the Unit- ccumenced a power increase-to 90%
output.- Approximately 90% output was-achiuved at 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> as-end of cycle fuel stretchout continued.
9
I AVERAGE DAILY LUIT POER LEVEL DOCKEI' NO. 50-334 UNIT ~BVPS Unit 1 DATE Sept. 3, 1992 COMPLETED BY - David T. Jones TELEPHONE (412) 393-7612I_
Molmi Auctust 1992 CAY AVERAGE DAILY PCMER LEVEL DAY AVERAGE DAILY KHER LEVEL
(!Ee-Net) (tMe-Net) 1 458 17 729 2 392 18 729 3 758 19 733 ,
4 817 20 733-5 825 21 733 6 821 22 -379 7 721 23 342 8 358 24 650 9 342 25 725 10 638 _ 26 721
( 11 717 27 725 12 733 28 729 13 725 29 704 14 729 30 329 15 729 31 667 16 733 INSTRUCTIONS On this fomat, list the average daily unit power level MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
. - .= - - _ . . - - - . _ - .
OPERATING' DATA REPORT I DOCKET No.: 50 334 1
_ REPORT DATE: 09/03/92 _i COMPLETED BY: DAVID T. JONES ;
TELEPHONE: (412) 393-7612 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes 4
- 2. REPORTING PERIOD: AUGUST 1992
' 2652-
- 3. LICENSED THERMAL POWER (MWt):
- 4. NAMEPIATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835-
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860-
- 7. MAX. DEPENDABLE CAPACITY _(Net MWe): 810
- 8. IF CHANGES OCCUR-IN CAPACITY RATINGS. SINCE LAST REPORT, ~ GIVE REASONS:.
i-d
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MVe): None l~ 10. REASONS FOR RESTRICTIONS, .IF ANY: N/A THIS MONTH -YEAR'TO-DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 5855.0 143207.0 j 12. NO. OF HRS REACTOR WAS CRITICAL: 744.0 ~5855.0 91178.6 i 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 -0.0 4482.8 i 14. HOURS' GENERATOR WAS ON LINE: 744,0 5855.0 89286.2 -
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 - . 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 16C4887.0 14949281.0- 213461457.-5
' 17. GROSS ELECT. ENERGY GEN.'(MWH): '517530.0 4891050.0; 68689453.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH)
- 482990.0 4611780.0 64179330.0
- 19. UNIT SERVICE FACTOR:-(PERCENT)- 100.0 .100.0 64,4
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0' 100.0 64.4-
-- 21. UNIT CAPACITY _ FACTOR (MDC): PCT '80.1 - 9 7 .- 2 58.0-
- 22. UNIT CAPACITY FACTOR-(DER): PCT 77.7 94.3- 56.3 3
- 23. UNIT FORCED OUTAGE RATE:'(PERCENT)- l0.0- 0.0' 15.8 j 24. SHUTDOWNS LSCHEDULED OVER NEXT SIX . MONTHS (TYPE,DATE, AND DURATION OF EACH):
i
- 25. IF SHUT DOWN' AT END 0F REPORT PERIOD, ESTIMATED DATE OF'STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL _0PERATION):
. FORECAST- ACHIEVED INITIAL CRITICALITY . N/A N/A' INITIAL ELECTRICITY N/A N/A 3- COMMERCIAL OPERATION N/A N/A e-
+ ~n, - = . _ - -n - n- .L...--.,4.- n nw.-,. -~. ~,, .. ,,. ,
v.--i,....-.. , . . , - - - - - - - - - , - , .:.,,-----+-,,
UNIT SHUTDOWNS AND POWER REDUCTIONS (120%) Docket No. 50-334 ~
Unit Name BVPS Unit #1 Date September 3, 1992 Completed By David T. Jones - '
REPORT MONTH AUGUST 1992 Telephone (412) 393-7612 ,
Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. 'Date 'Typel (Hours) Reason 2 Down Reactor 3 Report # code 4 Codes Prevent Recurrence 5 920801 5 0 N 4 N/A 22 2222ZZ Unit continued to load follow at approyimately 70% output.
6 920801 S 0 H. 5 N/A 22 222222 Units output further reduced from i approximately 70% to approximately 54% to load fattow.
7 920807 5 0 M 5 N/A ZZ 222ZZZ Units output reduced from 100% to approximately 90% for end of cycle a fuel stretchout.
8- 920807 5 0 H 5 N/A 22 222222 Units output f urther reduced f rcm i approximately 90% to approximately 50% to load fottow.
9 920822 S O H $ N/A 22 222222 Units output reduced from approx.
90% to approximately 50% to load follow.
10 920829 5 0 M 5 N/A 22 2227Z2 Units output reduced from approx.
90% to approximately 50%.to load follow.
l 1 2 3 4 F-forced Reason: Hethod: Exhibit F-Instructions for S-Scheduled A-Equipment- Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) Fite C-Refueling 3-Automatic. Scram (NUREG0161).
4 D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 a
} F-Administrative .
9-Other Exhibit H-Shae Source.
G-Operational Error (Explain)
H-Other (Esplain) ,
e e
1 4
_ - - _ _ _ _ _ - _ - _ _ _ v
IUJRATIVE SUWARY OP !
.l IOtTIHLY OPERATIlri EXPERIENCE d
UNIT 2 i
d AUGUST 1992
- j. i
- August 1 'Ihe Unit operated at a nominal value of 100% output.
- _ thrmgh August 9 August 10 At 2245 hours0.026 days <br />0.624 hours <br />0.00371 weeks <br />8.542225e-4 months <br /> the Units output was reduced to approximately 97% to improve conditions in the cordenser hotwell.
August 11 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the Units output was returned to a namir .1 j value of 100%.
August 12 'Ihe Unit operated at a nantinal value of 100% output, thrmgh A" ,ast 31 i
i l
l i
1 I
I
AVERAGE DAILY UNIT POER LEVEL DOCKET NO. 50-412 UNIT BVPS Unit 2 DATE Sept. 3, 1992 Crt4PLETED BY David T. Jones TELEPHONE (412) 393-7612 FDtTIH Auoust 1992 DAY AVERAGE DAILY PCMER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 833 17 834
'2 833 18 833 3 830 19 _ 837 4 832 20 _,. 836 5 835 21 834 6 827 22 828 7 824 23 824
. 8 819 24 822 9 822 25 823 10 814 _
26 821 11 824 27 824
, 12 833 28 832 i
13 833 29 838 14 834 30 834 15 833- 31 836 16 832 INSTRUCI' IONS On this format, list the average daily unit pcwer level MWe-Net for each day in the reporting month. Ccquto to the nearest whole megawatt.
OPERATINC DATA REPORT DOCKET NO., 50-412 REPORT DATE: 09/03/92 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7612 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY PCWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: AUGUST 1992
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPIATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 744,0 5855.0 41990.0
- 12. NO OF HRS. REACTOR WAS CRITICAL: 744.0 4492.0 35572,2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0= 0.0 -
0.0' 14 HolmS GENERATOR WAS ON LINE: 744,0 4414.3 35296.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0 -0 0,0
- 16. CROSS THERMAL ENERGY GEN. (MWH): 1959446.0 10904033.0 - %263780.4
- 17. GROSS ELECT ENERGY CEN. (MWH): 649573.0 3544731.0 27719312.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 617062'.0 '3344103.0 26149588.0
- 19. UNIT ~ SERVICE-FACTOR:-(PERCENT) ' 100.0 75.4' 84.1
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 75.4 84.1 21; UNIT = CAPACITY FACTOR (MDC): PCT _
-101.1 69,7 75.3 22, UNIT CAPACITY FACTOR (DER): PCT 99,2 - 68.3 74.5
-23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 -0.3 3.5-
-24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST' ACHIEVED
-INITIAL CRITICALITY =
i N/A N/A INITIAL ELECTRICITY N/A N/A ,
COMMERCIAL OPERATION N/A N/A
]
UNIT SHUIDOWNS AND POWi!R REDUCTIONS (t20%) Docket No. 50-412 Unit Name BVPS Unit $2 Date September 3, 1992 -
Completed By *
- David t. Jones REPORT MONTH AL. GUST 1992 Telephone (412) 393-7612 ,
Method of Licensee Cause 1 Corrective Duration Shutting Event System Component Action to No. Date Typel (Hours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 crevent Recurrence-NONE 1 2 3 4
. F-Forced Reason: Method: Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) file C-Refueling 3-Automatic Scram . (NUREG0161).
D-Regulatory Restriction .
4-Cont'd.; f rom Previous Month E-Operator Training 1 License Exam 5-Reduction 5 F-Administrative . 9-Other Exhibit H-Same Source.
G-Operationat Error (Explain)
H-Other (Explain)'