Intervenor Exhibit I-MOSBA-71,consisting of Presentation to Region II on Plant Site Area Emergency Held on 900320ML20086G373 |
Person / Time |
---|
Site: |
Vogtle |
---|
Issue date: |
05/17/1995 |
---|
From: |
GEORGIA POWER CO. |
---|
To: |
|
---|
References |
---|
OLA-3-I-MOSBA71, NUDOCS 9507140273 |
Download: ML20086G373 (12) |
|
|
---|
Category:EXHIBITS (DOCKETING AND SERVICES BRANCH INFORMATION
MONTHYEARML20100B7601995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-39A,consisting of Case Number 2-90-020R Re List of Exhibits ML20100B7631995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-97,consisting of Case Number 90-ERA58 Transcript Re Deposition of K Mccoy ML20100B7641995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-111,consisting of Procedure Number 00057-C Re 900711 Event Rept Entitled, DG 2A Start Failure ML20100B7651995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-272,consisting of File Number 90-ERA-30 Transcript Re Deposition of LB Glenn ML20099L3881995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-23A,consisting of Transcipt Re Intervenor Exhibit 23A Tape 29 Side B, ML20099L3711995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-8A,consisting of Transcript Re Joint Exhibit 8A Tape 8 Side B, ML20099L3831995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-21A,consisting of Transcript Re Intervenor Exhibit 21 Tape 32-1,dtd 900404,TR 41-44 ML20099L4041995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-153,consisting of Cover Sheet & Page from CRC Handbook of Chemistry & Physics ML20100B6781995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-222,consisting of Cooper Outage Logbook ML20099L4311995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-216,consisting of 900511 Interoffice Memo Re Enterprise Engine S/N 76021 Loss of Offsite Power on 900320 ML20100B6821995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-225,consisting of Correspondence Re Jul 1990 Starting Air Valve Problem ML20099L4291995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-215,consisting of History Re Alnor Dewpointer Model 7200U Serial 24355 Calibr ML20099L4331995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-217,consisting of Handwritten Statement Re Events of 1A DG Loss of Offsite Power ML20099L4081995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-170A,consisting of Transcript Re Intervenor Exhibit II-170A Tape 207,dtd 900717 ML20099L4001995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-94B,consisting of Transcript Re Intervenor Exhibit 94B Tape 32,dtd 900404,TR 46-49 ML20099L3971995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-94A,consisting of Transcript Re Intervenor Exhibit 94A Tape 32,dtd 900404,TR 46-49 ML20100B6801995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-223,consisting of RA Johnston Personal Outage Notes ML20100B6831995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-227,consisting of Correspondence Re Pneumatic Control Component Testing ML20099L3801995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-9A,consisting of Transcript Re Intervenor Exhibit 9 Tape 10,dtd 900323,TR 22-23 ML20099L3891995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-51A,consisting of Transcript Re Joint Exhibit 51 Tape 7,dtd 900322,TR 20-21 ML20099L3691995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-4A,consisting of Transcript Re Intervenor Exhibit 4 Tape 99,dtd 900508,TR 43-53 ML20100B7001995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-237A,consisting of Tape 218 Re 900725 Conversation Between Mosbaugh & Horton ML20099L4031995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-118A,consisting of Transcript Re Intervenor Exhibit 118A Tape 24A,dtd 900330 ML20100B6901995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-232A,consisting of Tape 3,side a of 900223 Conversation Between Bockhold & Mosbaugh ML20099L3041995-10-0606 October 1995 Applicant Exhibit A-181A,consisting of 900404 Tape 34, Beginning of Side B ML20099L4131995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-196,consisting of Nuclear Plant Maint Work Order Re DG 1A That Tripped Twice Following Two Actual Loss of Offsite Start Conditions ML20099L3821995-09-28028 September 1995 Intervenor Exhibit I-MOSBA-19A,consisting of Transcript Re Intervenor Exhibit 19 Tape 25,dtd 900330,TR 2 ML20099L3861995-09-28028 September 1995 Intervenor Exhibit I-MOSBA-22B-1,consisting of Transcript Re Intervenor Exhibit 22B Tape 89 Side A,50%,dtd 900502 ML20099L2111995-09-28028 September 1995 Applicant Exhibit A-120A,consisting of Transcript of Audiotape 72 ML20099L2121995-09-28028 September 1995 Applicant Exhibit A-133A,consisting of Transcript of Audiotape 69 ML20099L3581995-09-27027 September 1995 Applicant Exhibit A-202,consisting of Re Licensee Suppl Reply to NOV & Proposed Imposition of Civil Penalties ML20099L3601995-09-27027 September 1995 Applicant Exhibit A-203,consisting of Licensee on NRC Demand for Info Re G Bockhold ML20100B7541995-09-26026 September 1995 Intervenor Exhibit I-MOSBA-270,consisting of M&TE Traveler Re Alnor Derpointer W/Last Calibr Date of 890907 & Next Calibr Date of 900307,extended to 900407 ML20099L4111995-09-26026 September 1995 Intervenor Exhibit I-MOSBA-183A,consisting of Transcript Re Intervenor Exhibit II-183A (Joint Version) Tape 99 Side a, ML20099L4021995-09-22022 September 1995 Intervenor Exhibit I-MOSBA-95,consisting of 900823 Interoffice Correspondence Re NRC Areas of Concern, Log:SRBS-00044 Security Code:Nc ML20100B6991995-09-22022 September 1995 Intervenor Exhibit I-MOSBA-237,consisting of Tape 218,side B at 70% Re 900725 Conversation Between M Horton & Mosbaugh ML20099L1411995-09-22022 September 1995 Board Exhibit Bd-10,consisting of Drawing W/Related Info ML20099L4051995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-169,consisting of Demonstrative Aid 4 (Rev 950713) Re Dew Point Data,Diesel Air Sys ML20100B6971995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-235 Sup,Consisting of Transcript of Pages 83 & 84 Re OI Investigation ML20100B7501995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-266,consisting of Final Rept, Enhancement on On-Site Emergency DG Reliability ML20100B6921995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-233 Sup,Consisting of Transcript Re Page 689 ML20099L3541995-09-21021 September 1995 Applicant Exhibit A-199,consisting of Affidavit of Ja Bailey Re Vogtle Project ML20100B7431995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-262,consisting of Amount of Water in Humid Air at Any Pressure ML20100B7411995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-260,consisting of to NRC Document Control Desk Re Plant Special Rept Invalid DG Failure ML20100B7421995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-261,consisting of Estimate of DG Daily Air Leakage ML20099L3461995-09-19019 September 1995 Applicant Exhibit A-195,consisting of Professional Resume Re Ht Hill ML20099L3481995-09-19019 September 1995 Applicant Exhibit A-196,consisting of Paper Re Vogtle Experience W/Calcon Sensors in DG Trip Circuits ML20099L3511995-09-19019 September 1995 Applicant Exhibit A-198,consisting of Rept Re Plant DGs Airstart Cap Evaluation,Log 95-MT 039 ML20100B7471995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-264,consisting of Water Formation in Control Air Supply Typical Conditions (Early Apr 1990) ML20100B7461995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-263,consisting of Amount of Water in Humid Air at 240 PSIG (17.3 Atm) 1995-09-28
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20196J3291999-06-28028 June 1999 Comment Supporting Proposed Rule 10CFR50 Re Industry Codes & Standards ML20206M7291999-04-30030 April 1999 Comment Supporting Draft RG DG-1083, Content of UFSAR IAW 10CFR50.71(e). Licensee of Listed Plants in Total Agreement with Comments Provided to NRC by NEI HL-5717, Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC1998-12-18018 December 1998 Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC HL-5715, Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments1998-12-14014 December 1998 Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments HL-5702, Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols1998-10-23023 October 1998 Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols HL-5695, Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers1998-10-13013 October 1998 Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers HL-5690, Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC1998-10-0505 October 1998 Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC HL-5983, Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed1998-09-21021 September 1998 Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed ML20153B2391998-09-15015 September 1998 Comment on Draft NUREG-1633, Assessment of Use of Ki as Protective Action During Severe Reactor Accidents. Endorses NEI Comments HL-5682, Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute1998-09-15015 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute HL-5602, Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds1998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds HL-5586, Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps1998-03-0404 March 1998 Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps HL-5582, Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events1998-02-27027 February 1998 Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events HL-5564, Comment on Draft NUREG 1555, Updated Environ Standard Review Plan1998-01-30030 January 1998 Comment on Draft NUREG 1555, Updated Environ Standard Review Plan HL-5554, Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public1998-01-15015 January 1998 Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public HL-5546, Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements1997-12-31031 December 1997 Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements HL-5529, Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard1997-12-0101 December 1997 Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard ML20199J0031997-11-24024 November 1997 Comment Supporting Proposed Rule Re Financial Requirements for Decommissioning Nuclear Power Reactors & Draft RG 1060 HL-5424, Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions1997-07-0707 July 1997 Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions ML20148N0741997-06-19019 June 1997 Comment on Proposed Suppl to Bulletin 96-001 Re Control Rod Insertion Problems.Util in Complete Agreement That Incomplete Rcca Insertion Not Acceptable HL-5407, Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ1997-05-27027 May 1997 Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ ML20137C2581997-03-18018 March 1997 Summary of Director'S Decision Under 10CFR2.206 of Mb Hobby & AL Mosbaugh, ML20137C4261997-03-18018 March 1997 Director'S Decision Under 10CFR2.206 Re Petition Re Allegation of Illegal Transfer of OLs to Southern Nuclear Operating Co.Petitions Filed by Mb Hobby & AL Mosbaugh Denied HL-5268, Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols1996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols ML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20129J5481996-10-30030 October 1996 Order.* Extends Time within Which Commission May Take Sua Sponte Review of Memorandum & Order LBP-96-16 to 961129. W/Certificate of Svc.Served on 961030 ML20129K4291996-10-0202 October 1996 Comment Supporting Proposed Rule 10CFR25 & 95, Access to & Protection of Classified Info HL-5247, Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations1996-10-0101 October 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20128K2791996-09-30030 September 1996 Order.* Time within Which Commission May Take Sua Sponte Review of Memo & Order LBP-96-16 Extended Until 961030. W/Certificate of Svc.Served on 960930 ML20116J8921996-08-0202 August 1996 Withdrawal of AL Mosbaugh.* AL Mosbaugh Voluntarily Withdraws Intervention,Opposition & Contention in Proceedings.W/Certificate of Svc & Svc List ML20116J8551996-08-0202 August 1996 Joint Notice of Termination.* AL Mosbaugh Voluntarily Withdrew Intervention,Opposition & Contentions in Proceeding.W/Certificate of Svc & Svc List ML20116J8431996-08-0202 August 1996 Intervenor Response to Georgia Power Motion for Reconsideration.* Intervenor Supports Motion for Reconsideration.W/Certificate of Svc & Svc List ML20116N5881996-07-31031 July 1996 Comment Re Proposed Rule 10CFR26, Mods to Fitness-For-Duty Program Requirements. Supports NEI Comments ML20116A4931996-07-15015 July 1996 Georgia Power Company Motion for Reconsideration of 960628 Memorandum & Order Or,In Alternative,For Certification.* Gpc Requests That Board Not Require Submittal or Approval of Settlement Between Gpc & Mosbaugh.W/Certificate of Svc ML20115H2671996-07-0808 July 1996 Comment Supporting Final Rule 10CFR51, Environ Review of Renewal of Nuclear Power Plant Operating Licenses HL-5195, Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors1996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20114E6491996-06-20020 June 1996 Joint Motion to Defer Issuance of Initial Decision.* Requests That ASLB Defer Issuance of Decision in Proceeding Until 960920,in Order to Allow Gpc & Mosbaugh to Reach Settlement Agreement.W/Certificate of Svc IA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 HL-5103, Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use1996-02-0606 February 1996 Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use ML20096A4911995-12-22022 December 1995 Georgia Power Co Reply to Intervenor & NRC Staff Proposed Findings of Facts & Conclusions of Law.* W/Certificate of Svc ML20095D9821995-12-12012 December 1995 Georgia Power Co Motion to Correct Record of Exhibits of Diesel Generator Reporting Issues Allegation Hearing.* W/Certificate of Svc ML20095D9771995-12-0808 December 1995 Comment on Proposed Generic Ltr Boraflex Degradation in Spent Fuel Pool Starage Racks. Request for Licensees to Demonstrate Subcriticality Margin in Unborated Water,Seems Inconsistent W/Stated Benefit of Borated Water ML20094S2751995-11-30030 November 1995 Intervenor Final Statement of Fact & Conclusions of Law.* Board Finds That Util & Applicant Failed to Meet Burden of Proof Re Ultimate Issue of Character,Competence & Integrity. W/Svc List ML20094S2411995-11-22022 November 1995 Georgia Power Co Response to Intervenors Motion for Continuance.* Intervenor Motion Unjustified & Prejudicial & Should Be Denied.W/Certificate of Svc & Svc List ML20094S2931995-11-21021 November 1995 Intervenor Motion for Continuance for Good Cause.* Requests Deadline for Filing Post Hearing Brief Be Extended Until 951130.W/Certificate of Svc & Svc List ML20094K1161995-11-0909 November 1995 Intervenor Motion to Admit Supplementary Exhibits.* Moves That Naslp Admit Encl Documents Into Evidence for Listed Reasons.W/Certificate of Svc & Svc List ML20094J9301995-11-0606 November 1995 Georgia Power Company Motion to Correct Record of Diesel Generator Reporting Issues Allegation Hearing.* Moves Licensing Board to Order That Corrections Be Made to Transcript.W/Certificate of Svc & Svc List ML20094J9281995-11-0606 November 1995 Gap Proposed Findings of Fact & Conclusions of Law on Diesel Generator Reporting Issues.* Findings of Fact & Conclusion Accepted.W/Certificate of Svc ML20094J9201995-11-0101 November 1995 Affidavit of Ck Mccoy to Correct Info Contained in Intervenor Exhibit II-97,which Consists of Portions of Deposition in a Mosbaugh Complaint Against Gap 1999-06-28
[Table view] |
Text
- - .. ___ _ _ _
T-/l/DS&9 - 7/
l DOCHETED Exhibith,pagfl.SQRQQ PRESENTATION TO REGION II
% D -6 P3 '43 ,
NUCLEAR-RESULATORY COPMISSION OFFICE OF SECRETARY ON 00CKETING & SERVICE V06TLE SITE AREA EERGENCY BRANCH ,
MARCH 20, 1990 AGENDA e OPENING REMARKS C. K. MCC0Y e EVENT REVIEW TEAM CRITIQUE G. BOCKHOLD e IRUCK/ SWITCHYARD e 0FF-SITE NOTIFICATIONS e PERSONNEL ACCOUNTABILITY O e COMMUNICATIONS CORPORATE / SITE e MID-LOOP OPERATIONS e DIESEL IESTING/0PERABILITY G. BOCKHOLD e QUARANTINE COMPONENTS G. BOCKHOLD e UNIT 2 G. BOCKHOLD NUCLEAR REGULATORY COMMISSION n- 424-e t .4 -34 Docket f.ofo- 42 5-c a . 3 Official Exh. No. T- m + - -) I ,
in tht, matter of 6 eM e4 n 1-i Suff IDENTIFIED App! cant RECEIVED w intervenor & REJECTED Contg Oftr Contractor DATE O 7- I7-4 T Other - Witness S e,%fdeel
- Reparter C ^% -
92 PROJECT 9507140273 950517 gDR ADOCK 05000424 PDR
Exhbit ,page of O
1 INITIATING EVENT l l
FUELING TRUCK STRUCK INSULATOR SUPPORT INSIDE THE LOW VOLTAGE SWITCHYARD CAUSING A FAULT TO l
THE 1A RESERVE AUXILIARY IRANSFORMER.
e DIRECT CAUSE IRUCK DRIVER AND ESCORT WERE INATTENTIVE l TO SAFE OPERATION OF THE TRUCK.
e CONTRIBUTING CAUSES CONTROL OF VEHICLES NEAR VULNERABLE AND
() -
SENSITIVE AREAS NOT ESTABLISHED.
MAINTENANCE EQUIPMENT STAGED INAPPROPRIATELY.
THE USE OF GROUND-GUIDES INSIDE THE PROTECTED AREA WAS NOT CLEAR. ,
k 2
O 92 PROJEC) 006205
_.._. . _ . . _ - . . . . _ . . . _ . . . . _ _ _ . _ , . . . . . . . . - - - - _ ~ . _ _ _ ~ _ . _ , _ . . . _ _ _ . . . ~ . . . . _ _ . . . _ _ . . . _ . _ - -
~ _.
i ntroffice correspond:n e GeorgiaPower A i
O 1 Exhibit ,page _ of DATE: March 27, 1990
. RE: Vehicles In Perimeter Area FROM: G. Bockhold Jr.
T0: Site Personnel Due to the recent plant event of March 20 1990, the following shall be implemented immediately:
All vehicles within the Perimeter Area (PA) in which the driver does not have rearview visibility OR that are larger than a pickup truck, are required to have a fTigman at all times then the vehicle is backing up.
O Additional policies / procedures on this issue will be forthcoming.
d&6I p*
3 e O .
92 Pft03t[CT 006206
(
O Exhibit- ,page of-EER6ENCY PLAN IMPLEENTATION DURING THE EMERGENCY, OFF-SITE NOTIFICATIONS
. HERE LATE AND/OR DELAYED BEYOND THE 15 MINUTE TIME LIMIT. ,
e DIRECT CAUSES POWER TO THE PRIMARY ENN (IE EMERGENCY POWER) WAS LOST.
ALL EMERGENCY AGENCIES WERE NOT INCLUDED ON THE BACKUP ENN. (BURKE COUNTY AND GEMA ADDED 4/6/90)
' "'"'8""' c^"SES O '
CONTROL ROOM COMMUNICATORS AND SUPERVISORS WERE NOT FULLY KNOWLEDGEABLE OF THE COMMUNICATIONS SYSTEM CAPABILITIES. (PRIMARY ENN IN ISC HAD POWER FROM THE SECURITY SYSTEM DIESEL.)
THE SERIES METHOD OF NOTIFICATION CONTAINED UNSATISFACTORY DELAYS.
EMERGENCY DIRECTOR DID NOT ENSURE PROMPT NOTIFICATION OF OFF-SITE AGENCIES.
AMPLIFYING INFORMATION WAS NOT PROVIDED TO LOCAL GOVERNMENT OFFICIALS. .
k N .
O 92 rRO3ECT 207 o
Interoffice Correspondence Geo:3iaPower A DATE: April 4,1990 Exhibit ,page_ of RE: Emergency Notification Network (ENN) Communication j
FROM: George Bockhold, Jr. j T0: Emergency Directors (ED) and Comnunicators To ensure that ENN consnunication, is timely, Emergency Directors will ensure that the following improvements are implemented: ,
)
- 1. Innediately upon the declaration of an emergency, the conmunicator (Shift Clerk) will perform a roll call :
to detennine the operability of the ENN while the message is being prepared by the ED.
- 2. Burke County and GEMA is in the process of being added to the backup ENN and this will be installed and tested within the next few days.
- 3. The ED will personally ensure notifications are timely and problems are resolved. The ED will assign extra personnel or use TSC facilities to solve communication problems as necessary.
- 4. The TSC uses different power supplies than the Control Room and TSC comnunication systems may be operable when Control Room systems are not.
Since Burke County must respond quickest to most emergencies, ED's will ensure that Burke County receives the highest priority for ENN i notifications.
j We are investigating improved consnunication hardware and techniques.
In the meantime, your personal attention to ENN conmiunications must ensure 4
that we do not have the problems that we experienced on 3/20/90.
e b.
b ,*
. 1 G0/g* .-(*
) s 5 . :
O
O Exhibit ,page Of EERGENCY PLAN IPFLEENTATION DURING THE EMERGENCY, SITE PERSONNEL ACCOUNTABILITY NEEDED IMPROVEMENT.
e DIRECT CAUSE ACCOUNTABILITY PROCEDURES DID NOT PROVIDE FOR THE SITUATION OF NOT EVACUATING THE SITE. (GENERAL MANAGER'S MEMO OF 4/6/90) o CONTRIBUTING CAUSES THE INITIAL PAGE ANNOUNCEMENT WAS DELAYED APPROXIMATELY 20 MINUTES.
PERSONNEL WERE ALLOWED TO RE-ENTER THE PROTECTED AREA.
PAGE ANNOUNCEMENTS ARE DIFFICULT TO HEAR IN SOME PLANT AREAS..
4 -
THE COMPUTER GENERATED PRINTOUT DID NOT ALLOW QUICK IDENTIFICATl0N OF PERS0h'NEL.
]
THE EMERGENCY DIRECT 0rt FAILES TO PROVIDE
! GUIDANCE AFTER DECIDING NOT TO EVACUATE i PERSONNEL.
I j ..
- u i
6 l 92 Pft03ECT 006209
GeorgiaPower A Int:roffice Correspondence ODATE: April 6,1990 Exhibit- ,page. of_
RE: Accountability During Erargencies Log: NOV-00426 FROM: G. Bockhold, Jr.
TO: All Emergency Directors and Site Personnel Intheeventofsiteemergencyconditions$wswillimplement the following revised procedures. These changes will enhance personnel accountability and safety and ensure better information flow for employees. They will also provide flexibility to the plant when rasponding to emergency situations.
When the Emergency Director (4Dhe,9kes an emergency classification, he will make the appropriate 4ene-endsyfge'anWDuncement on the plant PA system. He will directesiteApersonnol tu the appropriate. locations.
He or she If you can notthear4he+pager-reportsto,your sppervisor. e will direct you appropriately. Nonna11y non-essential personnel will report to the Admin.- Building-atuttorium.or.-parking lot. David Phillips, the Financial: Services 75cpervisory-has authorttydo coordinate with the ED and control the disposition of non-essential personnel.
Odnhisabsence,theseniorpersonpresentwillcontacttheSecurity Captain for additional assistance.
Emergency Response Organization (ERO) personnel should report insnediately to the appro9riate facility. OthereshiftspursDhnel, supervisors, and managers on4 site should report initially to the 4SC.ma-Overflow personnel will assemble in the maintenance machine shop area. .
When directed by the ED, the security department will initiate accountability. The security department cannot account for personnel l
- who fail to logajatadhe_appropriata EllF (e.g., control room. TSC, er OSC) so it is essential me comply with the Id's instructions as j soon as possible.
Your assistance implementing thess instructions will ensure l
j we manage emergencies better and provide plant personnel with sufficient
- j information to keep them informed of abnormal plant activities.
l Thankyouforyourassjpance.
b l
i GB/ erd 7 l
i \ xc: Department Heads NM 92 PRO.7Ec7 006210 i
,._ ._ _.__ . _ _ . . _ , . _ , _ _ _ _ _ _ _ _ _ _ , _ _ - _. _ - _ ._ _ . _ _ _ . _ . - ~
O Exhibit , page of
- EER6ENCY PLAN IPPLEENTATIOJ COMMUNICATION BETWEEN CORPORATE AND ISC NEEDS TO BE IMPROVED.
e DIRECT CAUSES IHE STATUS LOOP TELEPHONE BRIDGE WAS NOT OPERABLE AT THE BEGINNING OF THE EMERGENCY BECAUSE OF THE LOSS OF POWER, lO i
)
1 4
a
! l 4
- e e
1
- 8 i
1 l0 -
i 92 MtOJECT 006211
- - - - - - - - - , . - - , , . . - - --.- , - c-- - ..-----,-.n.n,em e- m --e w-, .- - - ,-e., , , , . , . ,-,-,,-,-e-, .-,n ,-,, -- , , ,, - . , , - . - , , - - - .. -- , - , . - - -
l l
MID-LOOP OPERATIONS ACTIONS TO RESPOND TO LOSS OF CORE COOLING AT MID-LOOP SHOULD BE IMPROVED.
i e DIRECT CAUSE I
J THE " LOSS OF RESIDUAL HEAT REMOVAL" PROCEDURE SHOULD PROVIDE IMPROVED GUIDANCE FOR A LOSP CONDITION.
Id b -
e CONTRIBUTING CAUSES
[stooroe.
THE " LOSS OF RHR" PROCEDURES ARE TOO NARROWLY Nio./,ep Ga FOCUSED FOR MODE 5 & 6 CONDITIONS. fa. N4reA 84Eg 1 -
DIRECTIONS FROM THE EMERGENCY DIRECTOR i HERE NOT ALWAYS EXPLICIT.
I i
=*
9 .
l 1
- O 92 PROJECT 006212 l
1
DIESEL TESTING j
O- Exhibit- ,page of
^
- NORMAL 36 MONTH DVERHAUL AND INSPECTION
.la ,
lE
- 3/20 EVENT IN OVERHAUL l 5 STARTS, IROUBLESH00 TING SENSOR CALIBRATION
! LOGIC TESTING E-RUN BUBBLE TESTING MULTIPLE STARTS (14)
UV RUN TEST 6 MONTH RUN SURVEILLANCE DIESEL OPERABLE SENSOR CALIBRATION LOGIC TESTING E-RUN BUBBLE TESTING LUBE OIL DCP RUN MULTIPLE STARTS (5) DCP UV RUN FUNCTIONAL UV RUN TEST 6 MONTH SURVEILLANCE DIESEL OPERABLE HI JACKET WATER RUNS (3)
DCP UV RUN TEST 18SUCCESSFULSTARTS 19 SUCCESSFUL STARTS Srner.s
//f?Rouencxtrs 10 gicreay
- 2evisto/Dernneo CAL. Trac. g g, g,g g,g
(~ e h erogen ARPs (fM'C4 Reser)
L + ,ep,y,a4 2 Acr Aoss %
92 PROJECT
- %sr MTri fx4 rat % df , ALL SitccEssoGL -
cnx, xovc, %reie
^
file c.xtosin y i- .
l 4
i QUARANTINE COPPONENTS Exhibit ,page_ of _
TEPPERATURE SWITCHES l
e .1A PROBABLE TRIP CAUSE JACKET WATER TEMPERATURE (2/3 LOGIC) 1 INTERMITTENT ,
1 POST CALIBRATION LOW (186*F & VENTING) e 1A OTHER TEMPERATURE COMPONENTS 1 LUBE OIL TEMPERATURE (SLUGGISH) e IB TEMPERATURE COMPONENTS 4 JACKET WATER TEMP (VENTING) 2 LUBE OIL TEMP (VENTING & CALIB.)
O PRESSURE SWITCHES 1
e 1A 1 LUBE OIL PRESSURE (TRIPPED) 2 LUBE OIL PRESSURE (CONSEaVATIVELY REPLACED) e IB 2 LOGIC (WOULD NOT TRIP ENGINE) 1 h/K 0llAur){ - '
& ,rw % % ygg
- Temm A fea6esr kroiar
- Aa n % ,o G o Aie Gus arr' 11 Ce &hy L brs's .
O c.6 h/C fff6/WK lNSWA'ONaa., s,c riaa A> ' -
o Pon.y be Ecccwex.LeeMAI ,, ,,, e ,
006214
llU Y'D' NO "f#
y Dirsti O .,
met. --,pageO of it UNIT 2 e UNIT 2 TRIP UNIT 2 RAT B TRIP /PRrMARY DIFFERENTIAL IRIP i
i TURBINE TRIP / REACTOR TRIP SAFETY SYSTEM RESPONSE PROPER i
o CAUSE 1
j -
DIFFERENTIAL RELAY CT SET 3000/5 vrCE 2000/5 i e CORRECTIVE ACTIONS 1
TEST THE REMAINING RELAYS ON UNIT 2 l l
UPDATE SWITCHYARD DRAWINGS BASED ON AUDIT t -
CLARIFY EXISTING POLICIES FOR SWITCHYARD l f
i l
l i
l r*
12 . .
O 92 rytOJECT 006215 ,