Applicant Exhibit A-133A,consisting of Transcript of Audiotape 69ML20099L212 |
Person / Time |
---|
Site: |
Vogtle |
---|
Issue date: |
09/28/1995 |
---|
From: |
AFFILIATION NOT ASSIGNED |
---|
To: |
|
---|
References |
---|
OLA-3-A-133A, NUDOCS 9512200167 |
Download: ML20099L212 (15) |
|
|
---|
Category:EXHIBITS (DOCKETING AND SERVICES BRANCH INFORMATION
MONTHYEARML20100B7601995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-39A,consisting of Case Number 2-90-020R Re List of Exhibits ML20100B7631995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-97,consisting of Case Number 90-ERA58 Transcript Re Deposition of K Mccoy ML20100B7641995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-111,consisting of Procedure Number 00057-C Re 900711 Event Rept Entitled, DG 2A Start Failure ML20100B7651995-10-11011 October 1995 Intervenor Exhibit I-MOSBA-272,consisting of File Number 90-ERA-30 Transcript Re Deposition of LB Glenn ML20099L3881995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-23A,consisting of Transcipt Re Intervenor Exhibit 23A Tape 29 Side B, ML20099L3711995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-8A,consisting of Transcript Re Joint Exhibit 8A Tape 8 Side B, ML20099L3831995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-21A,consisting of Transcript Re Intervenor Exhibit 21 Tape 32-1,dtd 900404,TR 41-44 ML20099L4041995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-153,consisting of Cover Sheet & Page from CRC Handbook of Chemistry & Physics ML20100B6781995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-222,consisting of Cooper Outage Logbook ML20099L4311995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-216,consisting of 900511 Interoffice Memo Re Enterprise Engine S/N 76021 Loss of Offsite Power on 900320 ML20100B6821995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-225,consisting of Correspondence Re Jul 1990 Starting Air Valve Problem ML20099L4291995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-215,consisting of History Re Alnor Dewpointer Model 7200U Serial 24355 Calibr ML20099L4331995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-217,consisting of Handwritten Statement Re Events of 1A DG Loss of Offsite Power ML20099L4081995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-170A,consisting of Transcript Re Intervenor Exhibit II-170A Tape 207,dtd 900717 ML20099L4001995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-94B,consisting of Transcript Re Intervenor Exhibit 94B Tape 32,dtd 900404,TR 46-49 ML20099L3971995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-94A,consisting of Transcript Re Intervenor Exhibit 94A Tape 32,dtd 900404,TR 46-49 ML20100B6801995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-223,consisting of RA Johnston Personal Outage Notes ML20100B6831995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-227,consisting of Correspondence Re Pneumatic Control Component Testing ML20099L3801995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-9A,consisting of Transcript Re Intervenor Exhibit 9 Tape 10,dtd 900323,TR 22-23 ML20099L3891995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-51A,consisting of Transcript Re Joint Exhibit 51 Tape 7,dtd 900322,TR 20-21 ML20099L3691995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-4A,consisting of Transcript Re Intervenor Exhibit 4 Tape 99,dtd 900508,TR 43-53 ML20100B7001995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-237A,consisting of Tape 218 Re 900725 Conversation Between Mosbaugh & Horton ML20099L4031995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-118A,consisting of Transcript Re Intervenor Exhibit 118A Tape 24A,dtd 900330 ML20100B6901995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-232A,consisting of Tape 3,side a of 900223 Conversation Between Bockhold & Mosbaugh ML20099L3041995-10-0606 October 1995 Applicant Exhibit A-181A,consisting of 900404 Tape 34, Beginning of Side B ML20099L4131995-10-0606 October 1995 Intervenor Exhibit I-MOSBA-196,consisting of Nuclear Plant Maint Work Order Re DG 1A That Tripped Twice Following Two Actual Loss of Offsite Start Conditions ML20099L3821995-09-28028 September 1995 Intervenor Exhibit I-MOSBA-19A,consisting of Transcript Re Intervenor Exhibit 19 Tape 25,dtd 900330,TR 2 ML20099L3861995-09-28028 September 1995 Intervenor Exhibit I-MOSBA-22B-1,consisting of Transcript Re Intervenor Exhibit 22B Tape 89 Side A,50%,dtd 900502 ML20099L2111995-09-28028 September 1995 Applicant Exhibit A-120A,consisting of Transcript of Audiotape 72 ML20099L2121995-09-28028 September 1995 Applicant Exhibit A-133A,consisting of Transcript of Audiotape 69 ML20099L3581995-09-27027 September 1995 Applicant Exhibit A-202,consisting of Re Licensee Suppl Reply to NOV & Proposed Imposition of Civil Penalties ML20099L3601995-09-27027 September 1995 Applicant Exhibit A-203,consisting of Licensee on NRC Demand for Info Re G Bockhold ML20100B7541995-09-26026 September 1995 Intervenor Exhibit I-MOSBA-270,consisting of M&TE Traveler Re Alnor Derpointer W/Last Calibr Date of 890907 & Next Calibr Date of 900307,extended to 900407 ML20099L4111995-09-26026 September 1995 Intervenor Exhibit I-MOSBA-183A,consisting of Transcript Re Intervenor Exhibit II-183A (Joint Version) Tape 99 Side a, ML20099L4021995-09-22022 September 1995 Intervenor Exhibit I-MOSBA-95,consisting of 900823 Interoffice Correspondence Re NRC Areas of Concern, Log:SRBS-00044 Security Code:Nc ML20100B6991995-09-22022 September 1995 Intervenor Exhibit I-MOSBA-237,consisting of Tape 218,side B at 70% Re 900725 Conversation Between M Horton & Mosbaugh ML20099L1411995-09-22022 September 1995 Board Exhibit Bd-10,consisting of Drawing W/Related Info ML20099L4051995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-169,consisting of Demonstrative Aid 4 (Rev 950713) Re Dew Point Data,Diesel Air Sys ML20100B6971995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-235 Sup,Consisting of Transcript of Pages 83 & 84 Re OI Investigation ML20100B7501995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-266,consisting of Final Rept, Enhancement on On-Site Emergency DG Reliability ML20100B6921995-09-21021 September 1995 Intervenor Exhibit I-MOSBA-233 Sup,Consisting of Transcript Re Page 689 ML20099L3541995-09-21021 September 1995 Applicant Exhibit A-199,consisting of Affidavit of Ja Bailey Re Vogtle Project ML20100B7431995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-262,consisting of Amount of Water in Humid Air at Any Pressure ML20100B7411995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-260,consisting of to NRC Document Control Desk Re Plant Special Rept Invalid DG Failure ML20100B7421995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-261,consisting of Estimate of DG Daily Air Leakage ML20099L3461995-09-19019 September 1995 Applicant Exhibit A-195,consisting of Professional Resume Re Ht Hill ML20099L3481995-09-19019 September 1995 Applicant Exhibit A-196,consisting of Paper Re Vogtle Experience W/Calcon Sensors in DG Trip Circuits ML20099L3511995-09-19019 September 1995 Applicant Exhibit A-198,consisting of Rept Re Plant DGs Airstart Cap Evaluation,Log 95-MT 039 ML20100B7471995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-264,consisting of Water Formation in Control Air Supply Typical Conditions (Early Apr 1990) ML20100B7461995-09-19019 September 1995 Intervenor Exhibit I-MOSBA-263,consisting of Amount of Water in Humid Air at 240 PSIG (17.3 Atm) 1995-09-28
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20196J3291999-06-28028 June 1999 Comment Supporting Proposed Rule 10CFR50 Re Industry Codes & Standards ML20206M7291999-04-30030 April 1999 Comment Supporting Draft RG DG-1083, Content of UFSAR IAW 10CFR50.71(e). Licensee of Listed Plants in Total Agreement with Comments Provided to NRC by NEI HL-5717, Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC1998-12-18018 December 1998 Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC HL-5715, Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments1998-12-14014 December 1998 Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments HL-5702, Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols1998-10-23023 October 1998 Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols HL-5695, Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers1998-10-13013 October 1998 Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers HL-5690, Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC1998-10-0505 October 1998 Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC HL-5983, Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed1998-09-21021 September 1998 Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed ML20153B2391998-09-15015 September 1998 Comment on Draft NUREG-1633, Assessment of Use of Ki as Protective Action During Severe Reactor Accidents. Endorses NEI Comments HL-5682, Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute1998-09-15015 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute HL-5602, Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds1998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds ML20216B0731998-03-0505 March 1998 Exemption from Certain Requirements of 10CFR50.71(e)(4) Re Submittal of Revs to FSAR for Facility Changes Made Under 10CFR50.59 for Vogtle Electric Generating Plant,Units 1 & 2 HL-5586, Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps1998-03-0404 March 1998 Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps HL-5582, Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events1998-02-27027 February 1998 Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events HL-5564, Comment on Draft NUREG 1555, Updated Environ Standard Review Plan1998-01-30030 January 1998 Comment on Draft NUREG 1555, Updated Environ Standard Review Plan HL-5554, Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public1998-01-15015 January 1998 Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public HL-5546, Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements1997-12-31031 December 1997 Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements HL-5529, Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard1997-12-0101 December 1997 Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard ML20199J0031997-11-24024 November 1997 Comment Supporting Proposed Rule Re Financial Requirements for Decommissioning Nuclear Power Reactors & Draft RG 1060 HL-5424, Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions1997-07-0707 July 1997 Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions ML20148N0741997-06-19019 June 1997 Comment on Proposed Suppl to Bulletin 96-001 Re Control Rod Insertion Problems.Util in Complete Agreement That Incomplete Rcca Insertion Not Acceptable HL-5407, Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ1997-05-27027 May 1997 Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ ML20137C4261997-03-18018 March 1997 Director'S Decision Under 10CFR2.206 Re Petition Re Allegation of Illegal Transfer of OLs to Southern Nuclear Operating Co.Petitions Filed by Mb Hobby & AL Mosbaugh Denied ML20137C2581997-03-18018 March 1997 Summary of Directors Decision Under 10CFR2.206 of Mb Hobby & AL Mosbaugh, ML20137B3111997-03-17017 March 1997 Order Approving Southern Nuclear Operating Co,Inc.,As Exclusive Operator Vogtle Licenses HL-5268, Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols1996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols ML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20129J5481996-10-30030 October 1996 Order.* Extends Time within Which Commission May Take Sua Sponte Review of Memorandum & Order LBP-96-16 to 961129. W/Certificate of Svc.Served on 961030 ML20129K4291996-10-0202 October 1996 Comment Supporting Proposed Rule 10CFR25 & 95, Access to & Protection of Classified Info HL-5247, Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations1996-10-0101 October 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20128K2791996-09-30030 September 1996 Order.* Time within Which Commission May Take Sua Sponte Review of Memo & Order LBP-96-16 Extended Until 961030. W/Certificate of Svc.Served on 960930 ML20116J8431996-08-0202 August 1996 Intervenor Response to Georgia Power Motion for Reconsideration.* Intervenor Supports Motion for Reconsideration.W/Certificate of Svc & Svc List ML20116J8921996-08-0202 August 1996 Withdrawal of AL Mosbaugh.* AL Mosbaugh Voluntarily Withdraws Intervention,Opposition & Contention in Proceedings.W/Certificate of Svc & Svc List ML20116J8551996-08-0202 August 1996 Joint Notice of Termination.* AL Mosbaugh Voluntarily Withdrew Intervention,Opposition & Contentions in Proceeding.W/Certificate of Svc & Svc List ML20116N5881996-07-31031 July 1996 Comment Re Proposed Rule 10CFR26, Mods to Fitness-For-Duty Program Requirements. Supports NEI Comments ML20116A4931996-07-15015 July 1996 Georgia Power Company Motion for Reconsideration of 960628 Memorandum & Order Or,In Alternative,For Certification.* Gpc Requests That Board Not Require Submittal or Approval of Settlement Between Gpc & Mosbaugh.W/Certificate of Svc ML20115H2671996-07-0808 July 1996 Comment Supporting Final Rule 10CFR51, Environ Review of Renewal of Nuclear Power Plant Operating Licenses HL-5195, Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors1996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20114E6491996-06-20020 June 1996 Joint Motion to Defer Issuance of Initial Decision.* Requests That ASLB Defer Issuance of Decision in Proceeding Until 960920,in Order to Allow Gpc & Mosbaugh to Reach Settlement Agreement.W/Certificate of Svc ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 IA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 HL-5103, Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use1996-02-0606 February 1996 Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use ML20096A4911995-12-22022 December 1995 Georgia Power Co Reply to Intervenor & NRC Staff Proposed Findings of Facts & Conclusions of Law.* W/Certificate of Svc ML20095D9821995-12-12012 December 1995 Georgia Power Co Motion to Correct Record of Exhibits of Diesel Generator Reporting Issues Allegation Hearing.* W/Certificate of Svc ML20095D9771995-12-0808 December 1995 Comment on Proposed Generic Ltr Boraflex Degradation in Spent Fuel Pool Starage Racks. Request for Licensees to Demonstrate Subcriticality Margin in Unborated Water,Seems Inconsistent W/Stated Benefit of Borated Water ML20094S2751995-11-30030 November 1995 Intervenor Final Statement of Fact & Conclusions of Law.* Board Finds That Util & Applicant Failed to Meet Burden of Proof Re Ultimate Issue of Character,Competence & Integrity. W/Svc List ML20094S2411995-11-22022 November 1995 Georgia Power Co Response to Intervenors Motion for Continuance.* Intervenor Motion Unjustified & Prejudicial & Should Be Denied.W/Certificate of Svc & Svc List ML20094S2931995-11-21021 November 1995 Intervenor Motion for Continuance for Good Cause.* Requests Deadline for Filing Post Hearing Brief Be Extended Until 951130.W/Certificate of Svc & Svc List ML20094K1161995-11-0909 November 1995 Intervenor Motion to Admit Supplementary Exhibits.* Moves That Naslp Admit Encl Documents Into Evidence for Listed Reasons.W/Certificate of Svc & Svc List ML20094J9301995-11-0606 November 1995 Georgia Power Company Motion to Correct Record of Diesel Generator Reporting Issues Allegation Hearing.* Moves Licensing Board to Order That Corrections Be Made to Transcript.W/Certificate of Svc & Svc List 1999-06-28
[Table view] |
Text
.
/} -/38 N
~
~
33/:
" WEo v
'95 0CT 20 PS :20 Sf* E N
- 1 0FFICE OF SECRETARY 00CKEilHG 1 EERVICE 1
BRANCH 2
3 4
5 6
7 8
9 10 Transcript of audiotape No. 69, 11 transcribed by Kara K.
Lucas, Certified Court 12 Reporter and Notary Public.
7 13 14 15 16 17 18 19 20 NUCLEAD Rf"GULATC/RY COMMISSION 21 Docket No. 50-424/42NU. A ?
EXHIBITNO. TI " 13% A in the matter f_Georata Power Co et af. Voatie Units 1 & 2 22 O Staff Applicant [ l inaritanor O Other O ldentified DRe/c ivtJ D Rejected Reporter SA 23 Dam 9 /14 /4i witness BROWN REPORTING, INC.
24 1100 SPRING STREET, SUITE 750 ATLANTA, GEORGIA 30309 25 (404) 876-8979 9512200167 950928 i
PDR ADOCK 05000424 i
T PDR
~..... -
.~. -. - _
O 2
4/26/90
[APPROXIMATELY 60% THROUGH SIDE A) 1 Tape 69 2
3 ODOM:
The statement there about diesel starts.
4 MOSBAUGH:
Yeah?
l 5
ODOM:
They're having - Chaffee basically said, "That's 6
not a correct statement."
And then Brockman said --
7
-and Chaffee said, "I remember a couple of weeks ago 8
we were hearing about this not being correct."
And e
9 Brockman spoke up and said, " Yeah.
You heard it 10 from the Region."
And that's all he said.
I 11 thought he was going to help us out by what Brockman 12 had been talking to, you know.
13 MOSBAUGH:
Uh-huh.
14 ODOM:
And that's all he said.
So they i'
15
-- whether they say anything more or not, I don't 16 know; but they picked up on that statement, and they I
17 were making an issue for (inaudible), you know.
18 MOSBAUGH:
Huh.
19 ODOM: You might want to tell John (Aufdenkampe) if you 20 would that that statement where, you know, we 21 struggled with that that statement in there 22 MOSBAUGH:
Uh-huh.
?
4 e
a
2A 20 ODOM:
Is that it -- it's getting a 21-little more attention by the IIT (inaudible).
22 MOSBAUGH:
Huh.
23 ODOM:
I don't know if they're going to do 24 anything with it or not.
25 MOSBAUGH:
Alright.
26 ODOM:
They know that something's not_right on 27 that statement, you know, and er.
1 s
= _ _
3 1
MOSBAUGH:
It's more than not right.
2 ODOM:
Yeah, I know.
3 MOSBAUGH:
I -- I'm not done, but I'm looking 4
at the -- see, Kenny just got the logs.
5 ODOM:
Yeah.
6 MOSBAUGH:
sent to him, and I reviewed a little bit of 7
that with him yesterday.
We're going to do some 8
more, but I think we've got a real problem.
9 (Inaudible.)
12 ODOM:
Well, the other problem with 13 (inaudible) the LER. I don't have it in front of me But it talked about a fuel oil annunciator 14 now.
15 coming in, a lube oil alarm and a fuel oil.
16 MOSBAUGH:
That's correct.
17 ODOM:
They're saying --
18 MOSBAUGH:
That's in the log somewhere.
19 ODOM:
They're saying.
. They don't 20 recall ever hearing that before.
21 MOSBAUGH:
Uh-huh.
That's in the log.
22 That's written up in the critique log.
23 ODOM:
They didn't recall that.
[ LINES 24 - 25 DELETED)
(excerpts continue on p.
8, line 9) i i
8 i
?
1
[ LINES 1 - 8 DELETED)
~2 l
I 4
- 3 i
4 i
i i.
l 5
6 7
l-
' 8
.9 ODOM:
I thought they (the IIT) were asking about t
10 the 18 starts.
1 l
11 BEACHER:
Yeah.
12 ODOM:
.(Inaudible.)
{
13 BEACHER:
They had a lot of questions, i
14 concerning the LER.
Wow.
15 MOSBAUGH:
We're talking about the LER?
16-BEACHER:
Well, they reviewed the LER --
i 17 ODOM:
And the letter?
18 ODOM:
The LER.
We're talking about the
{
19 LER.
4 l
20-(Inaudible.)
21 BEACHER; The LER.
22 ODOM:
Not the letter, the LER.
23 BEACHER:
LER.
In the LER, we talked 24 about what annunciators folks saw in the diesel room.
25 He said.there's a discrepancy because they had more 1
I r
9'
-s
_.~. _. -
l I
I*
I i
1 annunciators than what the LER said, and LER might 2
have something they don't have.
j 3
ODOM:
The fuel oil, the fuel oil.
j 4
BEACHER:
Fuel oil was one of the ones they picked up.
5 ODOM:
Right.
And the start phrase --
j i
6 BEACHER:
" Eighteen. starts with no s
7 problem" -- he said that he had heard that before, 8
and he thinks that's not true.
i 9
ODOM:
Brockman spoke up and said --
10 BEACHER:
Brockman spoke up -- spoke up 11 and made a comment that --
12 ODOM:
"You heard it from us."
13 BEACHER:
Yeah, "you heard it from us."
i 14 ODuM:
(inaudible.)
15 BEACHER:
He said he has going to check 16 into it.
17 ODOM:
Like I say then they said -- then 18 Brockman -- then Chaffee said, "Well, I know 19 something's not right about that."
And he said, 20 "We're going to check into that."
(Inaudible.)
21 What I'm trying to say is that was in the LER.
22 MOSBAUGH:
Yeah.
Well, its worded 23 different ways, whether it's in the response to the
'24 confirmation of action letter --
25 ODOM:
Right, the April (inaudible).
i
=
-.. =
10 4
1 MOSBAUGH:
-- or George's presentation in
~
2 the Region.
3 BEACHER:
Yeah, Lewis Ward.
4 MOSBAUGH:
I brought it up with them, and d.
5.
I told Shipman; and I said, you know, "This is not
.6 true."
7 ODOM:
Yeah.
8-MOSBAUGH: "You guys better check your 9
' facts."
And I gave him specific data on dates and 10 times that -- where I was aware that we had known 8
11 failures.
12 ODOM:
Oh, yeah.
This is I wish that.
i 13 You know that day we had a real sensitive issue with the 14 thing.
they were picking up.
\\
15 MOSSAUGH:
They blew it off.
16 ODOM:
I thought they did, too, 17 I heard.
I heard the Region was contacted and 18 said, "Okay, we underctand."
19 MOSBAUGH:
I was on the phone with the 20 whole thing.
They blew it off.
21 ODOM:
And they might blow it off now, 22 but this IIT team --
23 MOSBAUGH:
No.
What I mean is they -- I 24 mean SONOPCO blew it off.
i 25 ODOM:
Oh, okay.
f i
a
.- _.._.~._.__- _ _ _ -.
11 3
1 MOSBAUGH:
I'm not saying the NRC blew it 2
off.
l 4
3 ODOM: I heard that we contacted Brockman 4
personally --
'5 MOSBAUGH:
McCoy came back on the 6
conversation on the phone and said, " Yeah, I just 7
talked to Ken Brockman, and he understands that j
8 there were failures in the process of coming out of 1
j 9
the maintenance on the machine."
Okay.
Well, that i
-10 may be, okay.
There were failures coming out of 4
1 4
11 the maintenance on the machine, okay, but there were e
12 also failures in a period of time that I considered 13 to be beyond the-maintenance on the machine.
?
l 1
14 ODOM:
Okay.
l 15 MOSBAUGH:
Okay?
16 BEACHER:
They want to talk with the guy 17 who actually did the work on those valves, the 18 accumulator installation valve, the charging and i
l 19 pump valve.
They want to talk with Mike Kagel again 20 concerning installation of the hatch, pressurizing 21 manway.
I guess what they're gettina at -- getting 22 at is how the communication related.
It appears as 23 though Hopkins told Mike Kagle (inaudible).
24 (LINES 24 - 25 DELETED) 25 (Excerpts continued on p. 14, Line 1) i b
l
i 14 1
1 BEACHER:
That was another question.
So they understand j
2 about the HP, maybe HP told somebody to do something.
3 MOSBAUGH:
Oh, okay, so they are definitely on to us then. 4 (laughter) 5 VOICE:
(inaudible) HP's involvement 6
MOSBAUGH:
(inaudible) Definitely onto us if they're asking that.
7 BEACHER:
I want to talk to these people, I need to learn 8
(inaudible) correct me if I'm 9
ODOM:
I think what I got, Herb 10 wrong -- What I got was -- most severely right now is the 11 statement about the eighteen starts, the -- not giving them 12 the event report right now (inaudible) but they (inaudible) 13 yesterday, okay.
In ance again this lube oil, fuel oil 14 alarm.
The fuel oj.
are talking about, (inaudible).
15 BEACHER:
It appears that what he was saying was that 16 maybe Tom had the information that they don't have.
17 ODOM:
Right, (inaudible).
18 BEACHER: And if that's the case, if they got information 19 they don't have, they need that information.
20 ODOM:
Right (inaudible).
21 BEACHER:
-- Where did they get it Tom, if it's not in 22 the transcripts (inaudible).
15
[APPROXIMATELY 70% THROUGH SIDE AJ 1
MOSBAUGH:
[ Reading] Lube oil pressure sensor 2
malfunction and fuel oil level high.
3 (Inaudible.)
4 ODOM:
They're saying this right here is new 5
to them (inaudible).
6 VOICE: They never heard that piece of 7
information.
8 Although they've got the narrative the 9
same as we do.
10 MOSBAUGH:
(Inaudible.) tripped the 11 diesel.
12 ODOM:
It's in the narrative though.
13 WEBB:
That's where it came from.
It 14 came from the Event report.
15 ODOM: The other problem that they had a problem with was the starts.
17 WEBB:
Where did we talk about that?
18 VOICE:
I don't know.
(Inaudible).
19 WEBB:
Oh, it's the number of starts 20 (inaudible).
21 MOSBAUGH:
Where it's at, Tom?
22 WEBB:
Back towards the end, wasn't it?
23 BEACHER:
Was it page 6 or something?
24 (Telephone ringing.)
25 MOSBAUGH:
On page 6, halfway.
15A 1
ODOM:
Tomorrow a another phone call so --
2 BEACHER:
Yeah.
10 o' clock same time.
Same place.
3 VOICE:
(inaudible).
4 ODOM:
(inaudible) fuel oil -- put a statement in there 5
VOICE:
(inaudible) top of the page, right here 6
VOICE:
It came out of the event report narrative, is 7
where it came from.
At first I thought it came out of the 8
April 9th letter, but it was in the event report narrative.
9 BEACHER:
There was another question too about 10 (inaudible) maintenance guy said and the Calcon guy said. Was 11 there a comment on that -- earlier?
12 VOICE:
Yeah (inaudible).
13 MOSBAUGH:
(inaudible) lube oil pressure sensor 14 malfunction and fuel oil level (inaudible).
15 ODOM:
(inaudible) Their sentence right here is new to 16 them.
They haven't heard that piece of information.
It 17 wasn't in -- although they've got the narrative same as we do 18 (inaudible) 19 VOICE:
(inaudible).
20 ODOM:
It's in the narrative though.
21 WEBB:
That's where it came from.
It came from the event 22 report -.
23 24 25 s
s 16 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 ODOM:
And the other problem I had -- had a problem 16 with is the starts.
17 WEBB:
Where did we tell them that?
18 MOSBAUGH: In Corrective Actions.
19 VOICE:
(Inaudible.)
19 WEBB:
Oh, the number of starts 20 (inaudible).
21 MOSBAUGH:
Where it's at, Tom?
l 22 WEBB:
Back towards the end, wasn't it?
l 23 BEACHER:
Was it page 6 or something?
24 (Telephone ringing.)
25 ODOM:
On page 6, halfway.
l i
17 1
VOICE:
" Numerous."
2 ODOM:
Say numerous (Inaudible.)
3 WEBB:
(Reading] "Have been started 3
at taast eighteen times each and no failure or 4
problems have occurred during any of these starts."
5 ODOM:
That's true.
Any of the eighteen 6
times --
7 VOICE:
I know it's true the way it's written.
8 But it's very misleading.
9 WEBB:
Brockman knows (inaudible).
10 ODOM:
I just told Allen they were hitting on 11 that.
They were really focused on that.
12 WEBB:
I thought Brockman was going to 13 explain it to them.
14 ODOM:
I thought he was going to help us 15 out.
16 WEBB:
He didn't --
17 ODOM:
He said, "What you heard -- where the 18 problem was -- is from the Region."
And he dropped it, 19 right there.
And that's all he said.
You know, 20 like, come on, Ken, speak up.
Tell us some more --
21 VOICE:
Another question --
22 ODOM:
-- if you do, help us out here (chuckling).
23 VOICE:
(inaudible) we explained (inaudible).
24 ODOM:
And he just -- I thought Bob was going to bail us 25 out too with that one, (inaudible) explain it, Allen.
I know j
26 McCoy talked,to him; that's what I heard.
1
18 1
WEBB:
And these fellows observed that 2
the jacket water pressure was 12 to 13 pounds.
They 3~
asked if that was when the diesel was running or 4
after a trip.
I said, "Well, the way it reads, I 5
think it's after the trip."
6 VOICE:
It sounds a little better if they are 7
convinced that it was after the trip.
He said Okay.
s 8
ODOM:
That's the way he understood it, too.
Okay.
Well 9
listen, if you want to run, keep me informed of that call; 10 and I'll consider two or three ears for that phone call today i
11 (inaudible)?
12 BEACHER:
Uh-huh.
13 ODOM:
And er.
14 MOSBAUGH:
(inaudible).
15 ODOM:
And uh, I wish these guys would 16 just go away, man.
17 MOSBAUGH:
Uh-huh.
l 18 BEACHER:
(Inaudible) Calcon switches when they did the, j
19 er, data (inaudible) on three sets of data taken, which we 20 told them --
i 21 ODOM:
Yes, it was 22 BEACHER:
-- yes, it was taken. However, 23 now they want to see the dog-gone data.
24 ODOM:
They're the same.
24 BEACHER:
I know.
They say its the same, but where is j
25 it?
We want to see the actual.
26 ODOM:
We've given it to them.
It's for the same 27 data.
L
18A 1
VOICE:
Taken three different times (inaudible),
~
2 BEACHER:
That's who I talked to (inaudible).
3
[End of Side A) 1 4
. - - - - - - - - - - - - - - -