cPC Exhibit II- / f yh Hill / Ward Exhibit A DOCKETED PROFESSIONAL RESUME USNRC Howard T. Hill, Consulting Engineer

'95 0T 20 P4 :45 l Education: BCE, George Washington University,1962 0FFICF 0F SECUTARY PhD, Princeton University,1966 CDME f!SG # . RViCE MBA, Golden Gate University,1987 BRidLH Registration: Civil Engineer, California Professional Affiliations: Society for Experimental Mechanics American Nuclear Society Code and Standards Memberships: ASME B&PV Code, Section ill, Division 2, Working Group on Testing and Overpressure Protection ASME B&PV Code,Section XI, Working Group on Concrete Pressure Components ANSI /ANS 56.8 Working Group, Containment System Leakage Testing Requirements Publications: Various papers on testing projects Experience:

1966-1967 - Employed by Bechtel Corp., Pipeline Division. Designed marine petroleum terminal facilities inclui,1g piping, tankage and offshore loading lines.

2 19671977 - Employed by Bechtel Corp., Scientific Development Department. Prepared conceptual designs for desalination plants and radioactive waste storage facilities. Designed and carried out numerous tests to verify design assumptions and to establish root causes of failures. Testing projects included the following.

! Reactor containment pressure proof tests Evaluation of structural vibrations Evaluation of equipment vibrations Evaluation of water hammer and other hydraulic pressure transient phenomena

, Evaluation of pump failures Evaluation of ice loading on Arctic offshore oilloading platform Evaluation of high capacity hydraulic jack failures Evaluation of piping and support response to dynamic fluid forces and thermal loading Evaluation of containment prestressing loads Evaluation of flow control valve failures ,

, Design of specialized testing instrumentation NUCLEAR REGULATORY COMMISSION Docket No. 50-424/425 OLA-3

!!A" iB8a 8i886 24 'n -" r " 4 "- '

  • EXHIBIT u"" "NO. " I*'

G PDR O statt Mplicant O lntervenor D Other O identified Moived O Rejected Reporter 5b Date hl 14 / W Witness NM ad Wd __

t i

'h l

a 1977-1979 - Employed vy Bechtel Corp., Los Angeles Power Division. Developed system startup procedures for the San Onofre Nuclear Generating Station (1977). Developed startup procedures and supervised system startup activities at the Lemoniz Plant in Bilbao, Spain (1978-1979),

1980-1987 - Employed by Bechtel Corp., San Francisco Power Division. Designed and implemented tests similar to those listed above, primarily at nuclear power facilities. Planned and implemented containment integrated leakage rate tests and isolation valve leakage testing programs. Developed specialized instruments for measuring forces in posttensioned concrete containment tendons.

1937-Present - Consulting engineer specializing in the following activities.

Design and implementation of safety related tests at nuclear power plants Review and evaluation of nuclear power plant testing programs Conforming testing programs to changing Federal regulations Codes and standards development Conducting safety related testing training prograrns Research into pressure retaining capacity of containment structures Application of test and measurement technology to the operation of industrial facilities.