|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20196J3291999-06-28028 June 1999 Comment Supporting Proposed Rule 10CFR50 Re Industry Codes & Standards ML20206M7291999-04-30030 April 1999 Comment Supporting Draft RG DG-1083, Content of UFSAR IAW 10CFR50.71(e). Licensee of Listed Plants in Total Agreement with Comments Provided to NRC by NEI HL-5717, Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC1998-12-18018 December 1998 Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC HL-5715, Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments1998-12-14014 December 1998 Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments HL-5702, Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols1998-10-23023 October 1998 Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols HL-5695, Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers1998-10-13013 October 1998 Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers HL-5690, Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC1998-10-0505 October 1998 Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC HL-5983, Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed1998-09-21021 September 1998 Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed ML20153B2391998-09-15015 September 1998 Comment on Draft NUREG-1633, Assessment of Use of Ki as Protective Action During Severe Reactor Accidents. Endorses NEI Comments HL-5682, Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute1998-09-15015 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute HL-5602, Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds1998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds HL-5586, Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps1998-03-0404 March 1998 Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps HL-5582, Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events1998-02-27027 February 1998 Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events ML20203B9761998-02-23023 February 1998 Order Prohibiting Involvement in NRC Licensed Activities (Effective Immediately).Requires That Mcgriff Be Prohibited from Any Involvement in NRC-licensed Activities for Period of 3 Yrs from Date of Dismissal from SNC on 970305 HL-5564, Comment on Draft NUREG 1555, Updated Environ Standard Review Plan1998-01-30030 January 1998 Comment on Draft NUREG 1555, Updated Environ Standard Review Plan HL-5554, Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public1998-01-15015 January 1998 Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public HL-5546, Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements1997-12-31031 December 1997 Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements HL-5529, Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard1997-12-0101 December 1997 Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard ML20199J0031997-11-24024 November 1997 Comment Supporting Proposed Rule Re Financial Requirements for Decommissioning Nuclear Power Reactors & Draft RG 1060 HL-5424, Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions1997-07-0707 July 1997 Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions ML20148N0741997-06-19019 June 1997 Comment on Proposed Suppl to Bulletin 96-001 Re Control Rod Insertion Problems.Util in Complete Agreement That Incomplete Rcca Insertion Not Acceptable HL-5407, Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ1997-05-27027 May 1997 Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ ML20137C2581997-03-18018 March 1997 Summary of Director'S Decision Under 10CFR2.206 of Mb Hobby & AL Mosbaugh, ML20137C4261997-03-18018 March 1997 Director'S Decision Under 10CFR2.206 Re Petition Re Allegation of Illegal Transfer of OLs to Southern Nuclear Operating Co.Petitions Filed by Mb Hobby & AL Mosbaugh Denied HL-5268, Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols1996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols ML20132A9171996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Stds Format & Content for Applications to Renew NPP Ols ML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20129J5481996-10-30030 October 1996 Order.* Extends Time within Which Commission May Take Sua Sponte Review of Memorandum & Order LBP-96-16 to 961129. W/Certificate of Svc.Served on 961030 ML20129K4291996-10-0202 October 1996 Comment Supporting Proposed Rule 10CFR25 & 95, Access to & Protection of Classified Info HL-5247, Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations1996-10-0101 October 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20128K2791996-09-30030 September 1996 Order.* Time within Which Commission May Take Sua Sponte Review of Memo & Order LBP-96-16 Extended Until 961030. W/Certificate of Svc.Served on 960930 ML20128M3411996-09-30030 September 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20116J8921996-08-0202 August 1996 Withdrawal of AL Mosbaugh.* AL Mosbaugh Voluntarily Withdraws Intervention,Opposition & Contention in Proceedings.W/Certificate of Svc & Svc List ML20116J8431996-08-0202 August 1996 Intervenor Response to Georgia Power Motion for Reconsideration.* Intervenor Supports Motion for Reconsideration.W/Certificate of Svc & Svc List ML20116J8551996-08-0202 August 1996 Joint Notice of Termination.* AL Mosbaugh Voluntarily Withdrew Intervention,Opposition & Contentions in Proceeding.W/Certificate of Svc & Svc List ML20116D6491996-07-31031 July 1996 Exemption from Requirements of 10CFR70.24 Re Criticality Monitoring Requirements ML20116N5881996-07-31031 July 1996 Comment Re Proposed Rule 10CFR26, Mods to Fitness-For-Duty Program Requirements. Supports NEI Comments ML20116G9271996-07-29029 July 1996 Comment Supporting Proposed Rule 10CFR26 Re Mods to Fitness-For-Duty Program Requirements ML20116A4931996-07-15015 July 1996 Georgia Power Company Motion for Reconsideration of 960628 Memorandum & Order Or,In Alternative,For Certification.* Gpc Requests That Board Not Require Submittal or Approval of Settlement Between Gpc & Mosbaugh.W/Certificate of Svc ML20115H2671996-07-0808 July 1996 Comment Supporting Final Rule 10CFR51, Environ Review of Renewal of Nuclear Power Plant Operating Licenses ML20115D1911996-07-0505 July 1996 Comment on Final Rule 10CFR51 Re Environ Review for Renewal of Nuclear Power Plant Operating License.Supports NEI Comments ML20115H1951996-07-0303 July 1996 Comment Supporting Proposed Rule 10CFR50, Reporting Reliability & Availability Info for Risk-Significant Sys & Equipment ML20113C6691996-06-24024 June 1996 Comments on Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors HL-5195, Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors1996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20114E6491996-06-20020 June 1996 Joint Motion to Defer Issuance of Initial Decision.* Requests That ASLB Defer Issuance of Decision in Proceeding Until 960920,in Order to Allow Gpc & Mosbaugh to Reach Settlement Agreement.W/Certificate of Svc IA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 HL-5103, Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use1996-02-0606 February 1996 Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use ML20100D1871996-01-29029 January 1996 Comment Opposing Petition for Rulemaking PRM-50-63, Recommending That Planning Std for Protective Actions for General Public Include Stockpile or Predistribution of Ki for Prophylactic Use ML20096A4911995-12-22022 December 1995 Georgia Power Co Reply to Intervenor & NRC Staff Proposed Findings of Facts & Conclusions of Law.* W/Certificate of Svc 1999-06-28
[Table view] Category:PUBLIC COMMENTS ON PROPOSED RULES & PETITIONS FOR
MONTHYEARML20196J3291999-06-28028 June 1999 Comment Supporting Proposed Rule 10CFR50 Re Industry Codes & Standards ML20206M7291999-04-30030 April 1999 Comment Supporting Draft RG DG-1083, Content of UFSAR IAW 10CFR50.71(e). Licensee of Listed Plants in Total Agreement with Comments Provided to NRC by NEI HL-5717, Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC1998-12-18018 December 1998 Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC HL-5715, Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments1998-12-14014 December 1998 Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments HL-5702, Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols1998-10-23023 October 1998 Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols HL-5695, Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers1998-10-13013 October 1998 Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers HL-5690, Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC1998-10-0505 October 1998 Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC HL-5983, Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed1998-09-21021 September 1998 Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed ML20153B2391998-09-15015 September 1998 Comment on Draft NUREG-1633, Assessment of Use of Ki as Protective Action During Severe Reactor Accidents. Endorses NEI Comments HL-5682, Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute1998-09-15015 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute HL-5602, Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds1998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds HL-5586, Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps1998-03-0404 March 1998 Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps HL-5582, Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events1998-02-27027 February 1998 Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events HL-5564, Comment on Draft NUREG 1555, Updated Environ Standard Review Plan1998-01-30030 January 1998 Comment on Draft NUREG 1555, Updated Environ Standard Review Plan HL-5554, Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public1998-01-15015 January 1998 Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public HL-5546, Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements1997-12-31031 December 1997 Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements HL-5529, Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard1997-12-0101 December 1997 Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard ML20199J0031997-11-24024 November 1997 Comment Supporting Proposed Rule Re Financial Requirements for Decommissioning Nuclear Power Reactors & Draft RG 1060 HL-5424, Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions1997-07-0707 July 1997 Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions ML20148N0741997-06-19019 June 1997 Comment on Proposed Suppl to Bulletin 96-001 Re Control Rod Insertion Problems.Util in Complete Agreement That Incomplete Rcca Insertion Not Acceptable HL-5407, Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ1997-05-27027 May 1997 Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ HL-5268, Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols1996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols ML20132A9171996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Stds Format & Content for Applications to Renew NPP Ols ML20129K4291996-10-0202 October 1996 Comment Supporting Proposed Rule 10CFR25 & 95, Access to & Protection of Classified Info HL-5247, Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations1996-10-0101 October 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20128M3411996-09-30030 September 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20116N5881996-07-31031 July 1996 Comment Re Proposed Rule 10CFR26, Mods to Fitness-For-Duty Program Requirements. Supports NEI Comments ML20116G9271996-07-29029 July 1996 Comment Supporting Proposed Rule 10CFR26 Re Mods to Fitness-For-Duty Program Requirements ML20115H2671996-07-0808 July 1996 Comment Supporting Final Rule 10CFR51, Environ Review of Renewal of Nuclear Power Plant Operating Licenses ML20115D1911996-07-0505 July 1996 Comment on Final Rule 10CFR51 Re Environ Review for Renewal of Nuclear Power Plant Operating License.Supports NEI Comments ML20115H1951996-07-0303 July 1996 Comment Supporting Proposed Rule 10CFR50, Reporting Reliability & Availability Info for Risk-Significant Sys & Equipment HL-5195, Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors1996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20113C6691996-06-24024 June 1996 Comments on Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors HL-5103, Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use1996-02-0606 February 1996 Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use ML20100D1871996-01-29029 January 1996 Comment Opposing Petition for Rulemaking PRM-50-63, Recommending That Planning Std for Protective Actions for General Public Include Stockpile or Predistribution of Ki for Prophylactic Use ML20095D9771995-12-0808 December 1995 Comment on Proposed Generic Ltr Boraflex Degradation in Spent Fuel Pool Starage Racks. Request for Licensees to Demonstrate Subcriticality Margin in Unborated Water,Seems Inconsistent W/Stated Benefit of Borated Water ML20095D9801995-12-0808 December 1995 Comments on Proposed Generic Communication, Boraflex Degradation in SFP Storage Racks ML20094M9691995-11-13013 November 1995 Comment on Proposed Rules 10CFR60,72,73 & 75, Safeguards for Spent Nuclear Fuel or High-Level Radioactive Waste ML20091Q2711995-08-28028 August 1995 Comment Opposing Review of Revised NRC SALP HL-4880, Comment on Proposed Generic communication,10CFR50.54(p), Process for Changes to Security Plans W/O Prior NRC Approval1995-07-10010 July 1995 Comment on Proposed Generic communication,10CFR50.54(p), Process for Changes to Security Plans W/O Prior NRC Approval ML20086N6141995-07-10010 July 1995 Comment on Proposed Generic communication;10CFR50.54(p), Process for Changes to Security Plans W/O Prior NRC Approval. Endorses NEI Comments HL-4879, Comment on Review of NRC Insp Rept Content,Format & Style. Util Feels That Use of Boilerplate Phrases Seldom Appropriate & That Less Boilerplate Wording Should Be Used1995-06-28028 June 1995 Comment on Review of NRC Insp Rept Content,Format & Style. Util Feels That Use of Boilerplate Phrases Seldom Appropriate & That Less Boilerplate Wording Should Be Used ML20086M8011995-06-28028 June 1995 Comment on Proposed Review of NRC Insp Rept Content,Format & Style. Util Applauds NRC for Undertaking Endeavor to Make Insp Rept More Effective Tool for Communicating W/Licensees & Public HL-4862, Comment Supporting NEI Comments on Proposed Rule 10CFR73 Re Changes to NPP Security Requirements Associated W/ Containment Access Control1995-06-0606 June 1995 Comment Supporting NEI Comments on Proposed Rule 10CFR73 Re Changes to NPP Security Requirements Associated W/ Containment Access Control HL-4840, Comment on Proposed Rule 10CFR50, Primary Reactor Containment Leakage Testing for Water-Cooled Power. Requests That NRC to Expedite Promulgation of Option B Rule1995-05-0505 May 1995 Comment on Proposed Rule 10CFR50, Primary Reactor Containment Leakage Testing for Water-Cooled Power. Requests That NRC to Expedite Promulgation of Option B Rule ML20083N4921995-05-0404 May 1995 Comment on Proposed Rule 10CFR50, Primary Reactor Containment Leakage Testing for Water-Cooled Power. Util in Total Agreement W/Nei Comments HL-4823, Comment on Draft Policy Statement Freedom of Employees to Raise Safety Concerns W/O Fear of Retaliation. Endorses NEI Comments1995-04-10010 April 1995 Comment on Draft Policy Statement Freedom of Employees to Raise Safety Concerns W/O Fear of Retaliation. Endorses NEI Comments ML20082K0461995-04-10010 April 1995 Comment on Draft Policy Statement, Freedom of Employees to Raise Safety Concerns W/O Fear of Retaliation. Endorses NEI Comments ML20078J8221995-02-0303 February 1995 Comment Supporting NUMARC Comment Re Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Nuclear Power Reactors ML20078J8101995-02-0303 February 1995 Comment Supporting NUMARC Comments on Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Nuclear Power Reactors 1999-06-28
[Table view] |
Text
_ _ _ . ___
C. K. McCoy Southern Naclxt d.2 / k 2 6 7 2 f Vice President Operating Company,Inc.
Vogtle Project 40 Inverness Center Parkway [#7 ,,,2 (>
/
g9p /,
P0. Box 1295 p
//8d f Birmingham, Alabama 35201
'C/k 2 2.
gg g/ppj d dt g 8/f y Tel 205.992.7122 Fax 205 992.0403 M'b dellfl"0THh
, W Sedr>
June 19, 1997
' 'd COMPANY Enerp ro Servekr%rld" LCV-1062 Docket Nos. 50-348 50-424 -
50-364 50-425 ,
Chief, Rules Review and Directives Branch U. S. Nuclear Regulatory Commission Mail Stop T-6D-69 Washington, D. C. 20555-0001 FARLEY NUCLEAR PLANT VOGTLE ELECTRIC GENERATING PLANT COMMENTS ON DRAFT SUPPLEMENT TO BULLETIN 96-01 i
CONTROL ROD INSERTION PROBLEMS Ladies and Gentlemen:
Southem Nuclear Operating Company (SNC) has reviewed the NRC's proposed i supplement to Bulletin 96-01 on control rod insertion problems. In accordance with the request for comments, SNC endorses the comments of the Nuclear Energy Institute (NEI) and those of the Westinghouse Owners' Group (WOG). In addition, in the Attachment to this letter, SNC reiterates some comments provided by NEl and the WOG and also ofTers additional comments.
SNC has closely followed tN small number of cases where incomplete RCCA insertion (IRI) has occurred and has taken appropriate data at Farley Nuclear Plant (FNP) and Vogtle Electric Generating Plant (VEGP). SNC has contributed its data to industry 1 groups and has reviewed in detail with Westinghouse the aspects of thi:, issue. SNC is in l complete agreement that IRI is not acceptable. However, we do not believe that the j proposed Bulletin supplement will aid in the on-going efrons to resolve the IRI issue, and may actually be adverse to safety by requiring unnecessary mid-cycle shut downs and stan ups of many units. I Sincerely I {
C. K. McCoy l
Attachment xe- (See next page) llll]ll ll ll llllllll{ll 9706260043 97eo19 PDR I&E MISC PDR
I t ,
i 4
Chief, Rules Review and Directive Branch Page 2 I l l 1
5 cc; S.guthern Nuclear Operating Company
. D. N. Morey, Vice President - Plant Farley )
R. D. Hill, General Manager - Plant Farley J. B. Beasley, General Manager - Vogtle Electric Generating Plant i
U. S Nuclear Reculatory Commission. Washinuton. DC l 2
- J.1. Zimmerman, Project Manager - Farley L. L. Wheeler, Senior Project Manager - Vogtle i 1
- U. S. Nuclear Reculatory Commission. Recion 11 L. A. Reyes, Reg [onal Administrator T. M. Ross, Senior Resident Inspector - Farley i C. R. Ogle, Senior Resident Inspector - Vogtle
?
i i
i 3-1
{
i-I 4
--.,n- ~,- g , - , --, , , ,-.,-, - .- , ,.-
1 ATTACHMENT FARLEY NUCLEAR PLANT ,
l VOGTLE ELECTRIC GENERATING PLANT-DRAFT SUPPLEMENT TO BULLETIN 96-01 CONTROL ROD INSERTION PROBLEhiS Hurnup Threshold Too Low The proposed bulletin supplement identifies a burnup threshold of 40,000 MWD /MTU, above which control rod drop time testing of 12-foot fuel with Intermediate Flow Mixing (IFM) grids is required. The 40,000 MWD /MTU threshold is too low for 12-foot fuel with IFM grids. Extensive rod drop time testing and root cause testing of fuel with IFM grids in several plants at burnups between 40,000 and 55,000 MWD /MTU has been completed. The data show that Westinghouse fuel with IFM grids can operate to substantially higher burnup than 40,000 MWD /MTU without experiencing increased drag that could indicate potential for incomplete RCCA insertion (IRI).
The proposed supplement also expresses concern that thimble tube distortion in fuel assemblies with IFM grids could lead to IRI very high in the core. This phenomenon has not been observed, nor do the drag or rod drop test data indicate that fuel is approaching a threshold where this is a realistic concern. As noted in the WOG comments, drag and ,
drop test data for fuel with IFM grids clearly indicate that there is no indication of thimble l tube distortion in the top of assemblies that could lead to control rods sticking high in the l core.
l The draft supplement also establishes the same burnup threshold for fuel types which have different fast fluences at equal burnups. Fast fluence is the appropriate parameter to determine when IRI may occur. The Westinghouse root cause conclusion for the IRI observations at Wolf Creek states that the increased compressive load was caused by unusual fuel assembly growth over and above what would normally be expected. Growth of fuel components is more appropriately correlated to fast neutron fluence than to fuel ,
assembly burnup. Fast fluence is used as the independent variable to plot growth and drag in the Westinghouse root cause report. However, different fuel designs reach a given fast fluence at different burnups. For example, Westinghouse VANTAGE 5H fuel reaches a fast fluence of 9.28 x 102' neutrons /cm2 at a burnup of 49,000 MWD /MTU while VANTAGE 5 fuel does not achieve the same fast fluence until a burnup of about 51,700 MWD /MTU. Therefore, on a fluence basis, it would be appropriate for a bumup threshold for testing for VANTAGE 5 fuel to be higher than that for VANTAGE 5H fuel.
Considerii;g the discussion above, the proposed burnup limit of 40,000 MWD /MTU provides approximately 12,000 to 15,000 MWD /MTU margin for 12-foot VANTAGE 5 fuel with IFM grids, a fuel type for which IRI has never been observed in-reactor. This amount of margin is overly conservative. For 14-foot fuel the draft supplement indicates a margin of 1000 to 2000 MWD /MTU between the proposed guideline value and the
l l ,
I .
4 I
ATTACHMENT (CONTINUED) l FARLEY NUCLEAR PLANT VOGTLE ELECTRIC GENERATING PLANT DRAFT SUPPLEMENT TO BULLETIN 96-01 CONTROL ROD INSERTION PROBLEMS experience base for IRI. This is a reasonable degree of margin and should similarly be applied to 12-foot fuel.
l l I,ow Safety Sinnificance for Credible Scenarios The primary safety concern from IRI is loss of shutdown margin. For scenarios involving the approximate magnitude of the IRI observed at Wolf Creek, IRI is not safety significant for either Southern Nuclear PWR plant and does notjustify mid-cycle shutdowns to take data. l l
Economic Penalty l l
The safety significance oflRI is small relative to the economic penalty created for Southern Nuclear by the proposed actions.
Previous operating experience and data indicate that control rods have operated successfully far in excess of 40,000 MWD /MTU in fuel with IFM grids. Therefore, the additional knowledge to be gained by mid-cycle testing beginning when rodded assemblies reach 40,000 MWD /MTU is insignificant. End-of-cycle rod drop time testing can provide essentially the same information without the large economic penalty associated with mid-cycle testing.
The cost of replacement power as a result of the proposed mid-cycle hot tod drop time ,
testing is conservatively estimated to be $2,500,000 for the current Farley and Vogtle operating cycles. This estimate assumes that the proposed supplement becomes effective in July, that Southern electric system 1, mnditions are not extreme, that tests are performed on weekends when system t . are generally lower, and that each test results in the loss of only one efTective full power day (EFPD) of generation. This estimate also presumes that Southern Nuclear will have enough flexibility in applying the burnup limits to coordinate outages such that no two units are taken ofTline for tening at the same time.
Negative EITects on Safety In addition to replacement power costs, there are other negative implications of complying with the proposed supplement. The actions in the proposed supplement will have a
ATTACHMENT (CONTINUED) -
FARLEY NUCLEAR PLANT VOGTLE ELECTRIC GENERATING PLANT DRAFT SUPPLEMENT TO BULLETIN 96-01 CONTROL ROD INSERTION PROBLEMS negative etTect on operations. To shut down and start up exposes the plant to an operationally complicated transient. Although fully within analyzed and approved margins, such transients increase the probability of equipment failures, plant trips, and challenges to safety systems.
The proposed actions will result in more planned shut downs and start ups near end oflife (EOL). EOL is one of the most undesirable times in core life to shut down a PWR. At the end of core life, reactor coolant system (RCS) boron concentrations are low in comparison to beginning oflife. The lower the RCS boron concentration, the larger the amount of water necessary to make reactivity changes. Compensating for the efTects of xenon during an EOL startup can be challenging.
Lack of Closure Mechanism The proposed actions would appear to be applicable indermitely. The NRC should ask licensees to define, as part of their responses, an appropriate closure mechanism.
Reportine Period Too Short The thirty day period allowed for reporting test data to the NRC is an unreasonable burden given that most of this data will be taken during a refueling outage. A longer time period to send in the test data, sixty days at least, would be more appropriate.
.