ML20087Q048

From kanterella
Revision as of 00:05, 14 April 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ro:On 840308,reactor Water Cleanup Sys Primary Containment Isolation Valve 2-G31-F004 Maint Tech Spec Actions Not Met. Investigation & Evaluation Incomplete.Ler 2-85-2 Will Be Submitted by 840507
ML20087Q048
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/05/1984
From: Dietz C
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
BSEP-84-0939, BSEP-84-939, NUDOCS 8404100247
Download: ML20087Q048 (1)


Text

.

CD&L .

Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 April 5, 1984 i- FILE: B09-13510C SERIAL: BSEP/84-0939 NRC Document Control Desk U. S. Nuclear Regulatory Commission

. Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 LICENSEE EVENT REPORT 2-84-5 Gentlemen:

On March 8, 1984, it was discovered that technical specifications required actions concerning performance of maintenance on Reactor Water Cleanup System, primary containment isolation valve 2-G31-F004 were not met. LER 2-84-5 was to have been submitted to your office by April 6, 1984. However, investigation and evaluation of this event is not yet complete. It is anticipated that this report will be submitted by May 7, 1984.

Very truly yours,

-Q C. R. Dietz, General Manager Brunswick Steam Electric Plant MJP/sd1/LETPS1

Enclosure cc: Mr. J. P. O'Reilly.

gt 95 8404100247 840405- 7 t/I #

PDR ADOCK 05000324

.V . :. 8 ,

PDR x

__ :_