BSEP-84-0939, Monthly Operating Repts for Mar 1984
| ML20088A127 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 03/31/1984 |
| From: | Dietz C, Harrison F CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| BSEP-84-0939, BSEP-84-939, NUDOCS 8404110021 | |
| Download: ML20088A127 (12) | |
Text
-
APPENDIX DOCKET NO.:
050-325 UNIT:
Brunswick No. 1 DATE: March 1984 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1 ~
Brunswick Unit 1 operated at a 76.32% availability factor for the month of March with a 72.23% capacity factor. There were two off-line outages and two power reductions. Details are in Appendix D, The Unit Shutdown and Power Reduction Log.
There are 656 BWR and 160 PWR spent fuel bundles in.the Brunswick No. 1 fuel pool.
l..
L 1
[U hO
.R E
e:.
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO.-050-0325 UNIT BRUNSWICK UNIT 1 DATE 04/06/84 COMPLETED BY FRANCES HARRISON
' TELEPHONE'(919)457-9521 7 MARCH-
-1984
-DAY-
-AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET)'
1~
795
-17 776 1r 742 18
.785
.3
-8, 19 783 4
-8 20 785 5'
-6 21 784 6
-6 22:
785
--. 7
-7 23 784
~
8
-8
.24-734 L9
- -10.
25 777 10-176 26 783
.l11 '
~614
'27:
785 12L 716 28 785 t
-13 759
- 29 '
785
'14 770' 30 785
' 15 '
785 ~
31 685
'16 785
- 1.16 - 8 '
I e
OPERATING DATA REPORT j-DOCKET NO. 050-0325 DATE 04/06/04 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 1 1 NOTES I
-2.
REPORTING PERIOD: MARCH 84 I
I 3.' LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I i
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 2184.00 61705.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 585.22' 1948.08 38346.06
- 13. REACTOR RESERVE' SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS-GENERATOR ON LINE 567.83-1903.83 35992.36-
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL. ENERGY GEN. (HWH) 1319848.19 4492362.07 72919656.64
- 17. GROSS ELEC. ENERGY GEN. (MWH) 437255.00 1503436.00 24050487.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 424522.00 1462944.00 23076784.00 19.-UNIT SERVICE FACTOR 76.32 87.17-58.33
- 20. UNIT AVAILABILITY FACTOR 76.32 87.17 58.33
- 22. UNIT CAP. FACTOR (USING DER NET) 69.50 81.59 45.55
- 23. UNIT FORCED OUTAGE RATE
.15 5.22 22.34
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
DOCKET NO. 050-0325 UNIT 5HUTDOWNS AND POWER REDUCTIONS UNIT NAME nrunnwick i DATE _ April 1984 COMPLETED BY Franean Harrinon REPORT MONT11 March 1984 TELEPif0NE (919)457-9521 e.
5; "E
E Licensee Ev g
Cause & Corrective
-h j!
k
)j$
(i hO Dare Action to Event
$=
5 j@g Report a mV Prevent Recurrence F
g d5 84-017 840303 S
175.19 B
1 NA CB PUMPXX Outage-1B Rx Recirc Pump Seal Replace-ment.
Two stage mechanical seal on the 1B reactor recirc pump was replaced with a new assembly.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)
't-Continuat. ions E-Operator Training & Ucense Examination F Administrative 5-Load Reductions 5
G-Operational Error (Explain)
(,-Other Exhibit I Same Source 19/77)
H-Other (Explain)
050-0325 D7CKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick T DATE Anril 1984 COMPLETED BY Frances liarrison REPORT MONTH Mnrrh 1984 TELEPHONE (919)457-9521 n.
.!E 3
.Yh Licensee
,E*
e.
Cause & Corrective Date R
3g 4
2s&
Event p
g{
Action to
$=
5 jgg Report a mV H
Prevent Recurrence 6
84-019 840311 S
00 B
5 NA Reduced power 60% for rod improvement i
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 0161) 4-Continuations E-Operator Training & License Examination F-Administrative 5-Load Reductions 3
G-Operational Error (Explain)
(,-O t he r Exhibit I - Same Source 19/77)
H-Other (Explain)
DOCKET NO. 0 50-O'O s UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick I DATE Ariril 1984 REPORT MONT11 March 1984 COMPLETED BY Frnnees Harrispn TELEPHONE (919)457-9521 e.
E c
u 5_ E 3
yY3 Licensee Eg ge.
Cause & Corrective Due g
3g jg5 Event g3 g3 Action to H
y:
5 j gy3 g Report a mO O
Prevent Resurrence g
6 84-021 840324 S
00 B
5 NA zz zzzzzz Reduced power for routine valve testing and SPE work, i
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 0161) l-Continuat. ions i
E-Operator Training & Ucense Examination F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Exhibit I Same Source (4/771 -
H-Other (Explain)
DOCKET NO. 050-0325 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME B rtin cuf,,t-r DATE April 1984 Frances Harrison COMPLETED BY REPORT MONTH March 1984 TELEPHONE (919)457-9521
~.
j?
3 Y
Licensee
- jar, Cause & Corrective Date g
3g jg&
Event g
gU'8 Action to H
$E E
j;5g Report a mV Prevent Recurrence g
t5 84-025 830331 F
In H
3 NA ZZ Valvexx Rx Scram-loss of instrument air to Progress radwaste which resulted in CFD effluent valves to go shut and the bypass failure to open.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) 1+-Continuations E-Operator Tiaininga License Examination F Administrative 5-Load Reductions 3
G-Operational Error (Explain) 6-Other Exhibit 1 - Same Source t9/77)
H-Other (Explain)
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 04/06/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 MARCH-1984 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(HWE-NET) 1 734 17
-9 2
732 18
-8 3-735 19
-10 4
747 20
-10 5
743 21
-9 6
739 22
-9
'7 741 23
-8
- 8 736 24
-7 9
734 25
-7 10 733 26
-7 11 687 27
~6 12 6
28
-6' 13-
-8 29
-6 14 30
-6 15
-8 31
-6 i16
~9 1.16 - 8
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 04/06/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS
-1.
UNIT NAME: BRUNSWICK UNIT 2 i NOTES I
2.
REPORTING PERIOD: MARCH 84 I
I 3.
LICENSED THERMAL POWER (MWT): 2436 i
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
(
6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES DCCUR IN CAPACITY' RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
~11.
HOURS IN REPORTING PERIOD 744.00 2184.00 73729.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 265.93 1604.33 46331.75
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 265.93 1566.99 43352.46
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 610831.87 3355120.34 81931841.36
'17., GROSS ELEC. ENERGY GEN. (MWH) 200061.00 1110430.00 27220128.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 190052.00 1071207.00 26099025.00
- 19. UNIT SERVICE FACTOR 35.74 71.75.
58.'80
- 20. UNIT AVAILABILITY FACTOR 35.74 71.75 58.80
12 2.
UNIT CAP. FACTOR (USING DER NET) 31.11 59.74 43.12 23 UNIT FORCED OUTAGE RATE
.00 2.22 15.54
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS.IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY
' COMMERCIAL OPERATION 1.16 - 9
APPENDIX DOCKET NO.: 050-324 UNIT:
Brunswick No. 2 DATE: March 1984 COMPLETED BY:
Frances Harrison OPERATIONS SU&%\\RY BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 35.74% availability factor for the month of March with a 32.33% -capacity factor. There was one planned off-line outage.
Details are in Appendix D, The Unit Shutdowns and Power Reduction Log. The unit operated at reduced power due to first stage drain tank east MSR manway gasket leak.
There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.
o L
L p
I i
050-0324 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS -
Brunswick 11 UNIT N AME DATE April 1964 COMPLETED BY Frances Harrison REPORT MONTH March 1984 TELEPHONE (919)457-9521 w.
IE Ucensee
['t.
Cause & Corrective D.s t e g
3g
(
jg5 Everat a?
[Q Action to E
jgg Repoit 3 (N 0 U
Prevent Recurrence H
6 84-020 840313 S
In C
1 NA RC FUELXX.
Refueling / Maintenance Outage Progres e
~
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) 4-Continuations E-Operator Training & Ucense Examination F-Administrative 5-Load Reductions 5
G-Operational Error (Explain)
(,-0ther Exhibit I - Same Source t'3/77 )
H-Other (Explain)
..e Cp&L Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 April 2, 1984 FILE: B09-13510C
. SERIAL: BSEP/84-0936 Mr. R. C. DeYoung, Director Office of Inspection & Enforcement U. S.' Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT
Dear Mr. DeYoung:
In accordance. with Technical. Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits.the report of operating-statistics and shutdown experience for the month of March 1984.
Very truly. yours,
C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/mcg/LETJA Enclosures cc:
Ms..J. C. Baker Mr. S. W.-McDowell L Mr. J.' P. O'Reilly Mr. S. L. Rosen
_