BSEP-88-0475, Special Rept 2-SR-88-004:on 880414,14 Day Time Frame Exceeded for Limiting Condition for Operations.Caused by Problems W/Acquisition of Replacement Parts.Repairs Made & Sprinkler Header Returned to Svc

From kanterella
Jump to navigation Jump to search
Special Rept 2-SR-88-004:on 880414,14 Day Time Frame Exceeded for Limiting Condition for Operations.Caused by Problems W/Acquisition of Replacement Parts.Repairs Made & Sprinkler Header Returned to Svc
ML20154E611
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/13/1988
From: Dietz C
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
2-SR-88-004, 2-SR-88-4, BSEP-88-0475, BSEP-88-475, NUDOCS 8805200266
Download: ML20154E611 (1)


Text

y . o I CP&L Carolina Power & Light Company '

\

Brunswick Steam Electric Plant i P. O. Box 10429 Southport, NC 28461-0429 May 13, 1988 FILE: B09-13510C SERIAL: BSEP/88-0475 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.7.2 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-88-004)

Gentlemen:

During Unit 1 power operation concurrent with the Unit 2 1988 refueling /

maintenance outage, a limiting condition for operation (LCO) was sstablished, at 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> on March 31, 1988, in order to permit removal from service of the fire suppression sprinkler header in the units' common Radiologicai Waste Control System waste drumming room. This was done to allow replacement of a leaking sprinkler head. Due to problems in the acquisition of required replacement parts, the 14-day time frame of the subject LCO was exceeded on April 14, 1988. The r.equired repairs were subsequently completed and, at 0435 hours0.00503 days <br />0.121 hours <br />7.19246e-4 weeks <br />1.655175e-4 months <br /> on April 16, 1988, the involved sprinkler header was returned to service.

Very truly yours, dq C. R. Dietz, General Manager Brunswick Steam E)cetric Plant MJP/tlw Enclosure cc: Dr. J. N. Grace Mr. E. D. Sylvester BSEP NRC Resident Office