Special Rept:On 920810,fire Barrier Between Control Bldg Stairwell & 23-ft Elevation Cable Spread Room Declared Inoperable to Support Planned Mod.Hourly Fire Watch Will Remain in Place Pending Restoration of Fire Barrier
ML20105B246
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/14/1992
From: Spencer J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9209180261
Download: ML20105B246 (1)


Text

,

. - ~.

C N LL

~

s.

s Carolina Power & Lignt Company INDUMMM53N!RIMB8BBWEH5EMutEMB Brunswick Nuclear ' Proj ect P. O. Box 10429 Southport, N.C.

28461-0429 SEP 14 RECB FILE:

B09-13510C SERIAL:

BSEP-92-0010 U.S. Nuclear Regulatory Commission ATTN: Document Control. Desk Washington, D. C.'20555 i

B4UNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50 325 LICENSE NO. DPR-71 i

SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8A AND i

PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-92-00 3 l

Centlemen:

1-i The following is a sum: mary of fire protection Limiting Condition for Operation (LCO) Al-92-F0542. The LCO is the result of a major outage modification being performed on the common Control Building.

1 At 0730 on August 10. 1992, the fire barrier i>etween the Unit 1 Control Building-stairwell and the 23' elevation cable spread room was declared inoperable. _ This j.

was done in support of Plant Modificacion (PM)91-011, which would require drilling bolt holes in the stairwell's South wall as part of adding new wall i

supports.

With the. fire detectors operable on at least-one side of the fire i

barrier, an hourly fire watch was - stationed and remains in. place pending j_

res coration of the fire barrier. As of August 17, 1992, the PM had taken longer than the 7 days specified by the Technical Specification LC0_and required this r

j Special Report. The PM will allow th restoration of the fire barrier prior to i

the Startup of either Unit.

Ve'ry truly yours, w~~4

p. W. Spencer Ge eral Manager Scun alck Nucl a Proj ec t -
l cc:

Mr. S. D. Ebnetec Mr. R. H. Lo

[

BSEP NRO Resident Office

-~

$Db f