s Carolina Power & Lignt Company INDUMMM53N!RIMB8BBWEH5EMutEMB Brunswick Nuclear ' Proj ect P. O. Box 10429 Southport, N.C.
28461-0429 SEP 14 RECB FILE:
B09-13510C SERIAL:
BSEP-92-0010 U.S. Nuclear Regulatory Commission ATTN: Document Control. Desk Washington, D. C.'20555 i
B4UNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50 325 LICENSE NO. DPR-71 i
SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8A AND i
PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-92-00 3 l
Centlemen:
1-i The following is a sum: mary of fire protection Limiting Condition for Operation (LCO) Al-92-F0542. The LCO is the result of a major outage modification being performed on the common Control Building.
1 At 0730 on August 10. 1992, the fire barrier i>etween the Unit 1 Control Building-stairwell and the 23' elevation cable spread room was declared inoperable. _ This j.
was done in support of Plant Modificacion (PM)91-011, which would require drilling bolt holes in the stairwell's South wall as part of adding new wall i
supports.
With the. fire detectors operable on at least-one side of the fire i
barrier, an hourly fire watch was - stationed and remains in. place pending j_
res coration of the fire barrier. As of August 17, 1992, the PM had taken longer than the 7 days specified by the Technical Specification LC0_and required this r
j Special Report. The PM will allow th restoration of the fire barrier prior to i
the Startup of either Unit.
Ve'ry truly yours, w~~4
- p. W. Spencer Ge eral Manager Scun alck Nucl a Proj ec t -