Followup Special Rept:On 871228,limiting Condition for Operation to Permit Fire Suppression Sprinkler Header from Svc Exceeded.Caused by Unavailability of Addl Flow Switch 2-FP-FS-4059 in Plant Supply Sys.Switch Repaired
ML20153H050
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/01/1988
From: Harness J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
BSEP-88-0853, BSEP-88-853, NUDOCS 8809090073
Download: ML20153H050 (1)


Text

  • - -

c.

Carolina Dower & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 September 1, 1988 FILE: B09-13510C SERIAL: BSEP/88-0853 U.S. Nuclear Regulatory Commission A1TN: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 FOLLOW-UP TO SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.7.2 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-87-003)

Gentlemen:

During power operation of Units 1 and 2, at 0820 hours0.00949 days <br />0.228 hours <br />0.00136 weeks <br />3.1201e-4 months <br /> on December 17, 1987, a limiting condition for operation (LCO) was established to permit the removal from service of the fire suppression sprinkler header in the units' common Radiological Waste Control System waste drumming room. This was done to allow replacement of the header flow switch 2-FP-FS-4059. During installation of a replacement switch, the switch housing was inadvertently cracked which prevented use of the device. Due to unavailability of an additional switch in the plant supply system, the 14-day time frame of the subject LCO was exceeded on December 28, 1987.

The subject flow switch has been repaired and was returned to service at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on February 21, 1988.

Very truly yours, l(

J L. Harness, General Manager Brunswick Steam Electric Plant MJP/byc Enclosure cc: Mr. B. C. Buckley Dr. J. N. Grace BSEP NRC Resident Office