Special Rept:On 880119,reactor Bldg Fire Detection Sys Zone 14 Instrumentation Inoperable Due to Erroneous Fire Alarms.Caused Not Determined.Time Frame of 14 Days of Involved LCO Exceeded on 880202
ML20147H106
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/03/1988
From: Dietz C
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
BSEP-88-0165, BSEP-88-165, NUDOCS 8803080393
Download: ML20147H106 (2)


Text

y u N --

r*

s

a .,

e..' Cp&L Carolina Power & Light Company Brunswick Steam Electric Plant P. 0, Box 10429 Southport, NC 28461-0429 March 3, 1988 FILE: B09-135100 SERIAL: BSEP/88-0165 U.S. Nuclear Regulatory Commission A'ITN: Document Control Desk  ;

Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOChTT NO. 50-324 i LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.3.5.7 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-88-002) i Gentlemen:

During the Unit 2 1988 refueliag/ maintenance outage, the unit Reactor Building fire detection system zone 14 instrumentation was declared inoperable at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> on January 19, 1988, due to erroneous fire alarms (approximately 5 within the previous 12-hour period). This zone monitors the 117-foot elevation of the building. A limiting condition for operation (LCO) and a Work Request / Job Order (WR/J0) were initiated to investigste and resolve any problem (s) to which the subject fire alarms could be attributed.

Due to relative inaccessibility of the involved fire detectors (located on the ceiling above the 117-foot elevation of the Reactor ~ Building) and resulting personnel safety concern regarding troubleshooting of the problem (s), the cause of the subject fire alarms has not yet been determined. Consequently, the 14-day time frame of the involved LCO was exceeded on February 2, 1988. l l

l l

1 8803080393 880303

.~~. f PDR ADOCK 05000324 X S DCD 7 I$ 1 1

A

i

a. ~,

i In order to permit troubleshooting / resolution of the subject fire alarms, plant Engineering is evaluating the installation of appropriate plant modifications, which will allow safe personnel access to the involved fire detectors and/or remote identification of problem fire detectors. Pending completion of the involved modification (s) and subsequent repair activities to the subject instrumentation, an hourly fire watch patrol, as required by technical specifications, will remain in effect. The involved LC0 will be cancelled and the zone 14 fire detection instrumentation will be returned to service following resolution of the problem (s) affecting operability of the instrumentation.

Very truly yours, Yl .

C. R. Dietz, General Manager Brunswick Steam Electric Plant MFP/jfm Enclosure cc: Dr. J. N. Grace Mr. E. D. Sylvester DSEP NRC Resident Office