BSEP-89-0735, Special Rept 2-SR-89-002:on 890717,fire Barrier Limiting Condition for Operation Initiated to Allow Replacement of Door & Door Frame to Correct Misalignment & Sticking Problem.Time Frame Exceeded.Restoration Expected by 890831

From kanterella
Jump to navigation Jump to search
Special Rept 2-SR-89-002:on 890717,fire Barrier Limiting Condition for Operation Initiated to Allow Replacement of Door & Door Frame to Correct Misalignment & Sticking Problem.Time Frame Exceeded.Restoration Expected by 890831
ML20248A025
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/01/1989
From: Harness J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2-SR-89-002, 2-SR-89-2, BSEP-89-0735, BSEP-89-735, NUDOCS 8908080188
Download: ML20248A025 (1)


Text

, - - - - - . .- - . - . - - -

'i -

v Carolina Power & Ught Company Brunswick Nuclear Project P. O. Box 10429 Southport, NC 28461-0429-August 1, 1989 FILE: B09-13510C SERIAL: BSEP/89-0735-U.S. Nuclear Regulatory Commission ATTN: Document Control Desk' Washington,.DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOCKET NO. 50-324' LICENSE NO. DPR-62 SPECIAL REPORT PER TECilNICAL SPECIFICATION 3.7.8 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-89-002)

Gentlemen:

During Unit 2 power operation, aLUnit 2 fire barrier Limiting Condition,for Operation (LCO)'was initiated, at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> July 17, 1989, for fire door no. 303, located at penetration seal no. R1-3-020, the inner door'of the Reactor Building 50' elevation northeast. personnel airlock. The LCn was' initiated to permit replacement of the door and door frame in order to correct-a misalignment and sticking problem which hampers opening the door. Due to the scope of the involved work, the seven-day time-frame of the LCO was exceeded on July 24, 1989.

Reste ation of the door to functional status is expected by August 314 1989.

Until cancellation of the LCO, required fire watches will remain'in'effect~ .

Very truly.yours, g e-F L. Ilarness, General Manager

' Brunswick Nuclear Project MJP/mcg Enclosure 1

cc: Mr. S. D. Ebneter Mr.'E. G. Tourigny i

BSEP NRC Resident Office I-

/

I I p.

8908080188 sposo 7 PDR ADOCK 0500C M S p;