Special Rept 2-SR-92-003:on 920507,08,10,12,15,27 & 29 LCO Exceeded Time Estimated for Completion of Work Initiated. Appropriate Fire Watches Established During Stated Times
ML20097D733
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/05/1992
From: Spencer J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2-SR-92-003, 2-SR-92-3, NUDOCS 9206110100
Download: ML20097D733 (3)


Text

_

T y

, w, c- 72 .

=p7

. @ Cp&L

. :. Of Carolina Power Alight Company

+ /an 3

l}-

Brunswick Nuclear Project 7 - P. O. Box 10429 .

s

+

.Southport,g.C. 28461-0429 JUN 51932 0 FILES- B09-135100 g 9 U.S. Nuclear. Regulatory Commission.

ATTN:- Document Control Desk ,, .

O_ 4 Washington, D. C. 20555 4 d O

BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOCKET NO. 50-324 ",

LICENSE NO. DPR-62 ,

n v SPECIAL REPORT.PER TECHNICAL SPECIFICATION 3.7.8IAND

-EURSUANT TO TECHNICAL SPECIFICATION 6.9.2-(2-SR U-003)

O

' Gentlemen:

A2-92-F0197--

On April 23,-1992, at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br />, a fourteen day limiting condition for operation 1

f(LCO) was initiated ' due to fire suppression sprinklers .on the north wall of

' Diesel Generator . cell #3 being blocked by$scaf folding. This scaffolding was erected to support outage work. Appropriate fire watches were established at that time. On May 7, 1992, at 0530,'the LCO exceeded fourteer days.

A2-92-F0209... o~

on April'-26, 1992, at 1530> hours, a fourteen day LCO was initiated due to fire suppression sprinklers on~ the r.crth wall of. Diesel- Generator cell #4 being blocked,by scaffolding. . This . scaf folding was erected Ao support . outage work.

Appropriate fire' watches were established at that. time. On May 10, 1992, at 1530,-

the LCO' exceeded fou.' teen days.

A2-92-F02SS, A2-92-F0256, A.?-92-F025" ..

On May 1,1992, at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, three LCOs were initiated on walls.10D, llD, and

~ 12D located in the Diesel' Generator building 23' elevation. The seals (walls 10D, 11D and 12D) wore declared inoperable to support. outage work. Appropriate fire

~

watches wwre eotablished at that time. The LCOs exceeded seven days on May 8, 1992, at 1300.

A2-92-F0258 R On May.1, 1992, at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, an LCO was initiated due to fire door 117 being C opened.-to support outage work. This door is located in the Diesel Generator

-building; The.LCO exceeded seven days on May 8, 1992, at 1400. )

A2-92-F0262 & A2-92-F0263-On' May 1,1992, at' 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, two LCOs were initiated on fire doors 118 and 120 which were opened to support outage work. These doors are located in the Diesel 1 Generator building. Appropriate fire. watches were established. The LCO exceeded seven-days on May 8, 1992, at 1700.

A2-92-F0271 -

On May 3,1992,' at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, a seven day LCO was initiated due to fire door 128 9206110100 920605 goa anocx 03000324 PoR ff u(n

~ . .-

.c ].

r 2-being' opened to. support outage activities. This door is located in the Diesel Generator building. Appropriate fire watches were established at that tire. On M3y-10, 1992, at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />, the LCO exceeded seven days.

A2-92-F0280 On May 6,r1992, at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />, a seven day LCO was initiated due to fire door 107 being opehed to support outage work. This door is located in the Diesel Generator building. Appropriate' fire watches were established at that time. On May 13, 1992, at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />, the LCO exceeded seven days.

A2-92-F0273, A2-92-F0274, A2-92-F0275, A2-92-F0276 On-MayL5,-1992, at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br />, three seven day LCOs were initiated and at 1600

- hours ons seven day LCO was initiated. The LCOs were initiated on fire doors 123, 125 and seals DG-2-190 and DC-2-075 (resper tively) which were opened to support outage work.. These seals are' located in the Diesel Generator building.

Appropriate fire watches were established at that time. On May 12, 1992, at 0936 hours0.0108 days <br />0.26 hours <br />0.00155 weeks <br />3.56148e-4 months <br />, the LCOs exceeded seven days.

O A2-92-F0295 OnlMay 8,' 1992, at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />, a seven day LCO was initiated due to fire seal DG-3-341-1 being opened to support outage work. This seal is located in the Diesel Generator building. Appropriate fire watches wera established at that time. The LCO exceeded seven days on May 15, 1992, at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />.

O A2-92-F0352.

On May 20, 1992, at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br />, a seven day LCO was initiated due to fire door

. 121 being opened to euppcrt outage work. This door is located in the Diesel Generator building. Appropriate fire watches were established at that time.lOn May 27, 1992, at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br />, this LCO exceeded seven days.

The work in the Diesel Generator building associated with the above listed LCOs is scheduled to be completed on or about July 12, 1992. Until completion of the work and cancellation of the LCOs, the required fire watches will remain in effect.

OD A2-92-F0296 .

a i on May.8,1992,;at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br />,- a seven day LCO was initiated due to fire door 220 being opened to support outage work. This door is located in the Diesel Generator building. Appropriate fire watches were established at that time. The LCO- ,

exceeded seven days on May 15,1992, at -2130. On May .27,1992, at- 1130, this LCO - n was cancelled. Until cancellation of the LCO, required watches remained in

- effect.

, A2-92-F0355, A2-92-F0356, A2-92-F0357, A2-92-F0358 d' - on May 22, 1992,-at_1400 hours,.four seven day LCOs werC initiated due to the K inoperability of rotofoam seals around the pedestals of diesel generators 1, 2, 1 and 4. Oil from the diesel generators had seeped into the seals. causing the.n

- to be inoperable.- Appropriate fire watches were established at that time. On May 29, 1992, at-1400, these1LCOs exceeded seven days. Tentatively, the corrective

~

actions will include replacing the seals and securing the oil seepage.- The intial estimated time for completion of this work is March,1993r however, this work may be completed earlier af ter the preliminary engineering ia completed and the work scope ~ defined. Thia information will be included in a supplemental special Report. Until restoration of the seals, appropriate fire watches will remain in effect..These seal inoperabilities will also be reported in LER 1-92-016.

e

~

m, - - . .

. .'r i t p

3 Very truly yours, J

, y

. Spencer, neral Manager

\B ry swick Nuclear Project RSK/