ML20069K114

From kanterella
Revision as of 19:42, 28 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Aug 1982
ML20069K114
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/11/1983
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20069K012 List:
References
NUDOCS 8304260206
Download: ML20069K114 (1)


Text

. .

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 04/11/83 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.' UNIT NAME: BRUNSWICK UNIT 2 i NOTES I

2. REPORTING PERIOD: AUGUST 82 I I 3.. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I i
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I i
6. HAX DEPENDABLE CAPACITY'(GROSS MWE): 815.0 I i
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION.IF ANY:

.THIS YR TO CUMUL MONTH DATE .ATIVE

11. . HOURS' IN REPORTING PERIOD 744.00 5831.00 59856.00
12. NUMBER OF HOURS REACTOR CRITICAL .00 2465.22 37632.12 11 3 . REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE .00 2384.58 35153.88
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) .00 4467965.05 64465505.02
17. GROSS-ELEC. ENERGY GEN. (MWH) .00 1415289.00 21409226.00
18. NET ELEC. ENERGY GENERATED (MWH) -7575.00 1337238.00 20526640.00

' 19. UNIT SERVICE FACTOR .00 40.89 58.73 20.-UNIT AVAILABILITY FACTOR .00 40.89 58.73

21. UNIT CAP. FACTOR (USING MDC NET) -1.29 29.03 43.41 22.-UNIT CAP. FACTOR (USING. DER NET) -1.24 27.93 41.77
23. UNIT FORCED OUTAGE RATE .00 12.10 16.70
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

2 5.- IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

ACHEIVED

~

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY --------

COMMERCIAL OPERATION -------- --------

8304260206 830413 ,

PDR ADOCK 05000324 1.16 - 9 R PDR R