OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 04/11/83 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.' UNIT NAME: BRUNSWICK UNIT 2 i NOTES I
2.
REPORTING PERIOD: AUGUST 82 I
I 3.. LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
i 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
i 6.
HAX DEPENDABLE CAPACITY'(GROSS MWE): 815.0 I i
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION.IF ANY:
.THIS YR TO CUMUL MONTH DATE
.ATIVE
- 11.. HOURS' IN REPORTING PERIOD 744.00 5831.00 59856.00
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00 2465.22 37632.12 11 3. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE
.00 2384.58 35153.88
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH)
.00 4467965.05 64465505.02
- 17. GROSS-ELEC. ENERGY GEN. (MWH)
.00 1415289.00 21409226.00
- 18. NET ELEC. ENERGY GENERATED (MWH)
-7575.00 1337238.00 20526640.00
' 19. UNIT SERVICE FACTOR
.00 40.89 58.73 20.-UNIT AVAILABILITY FACTOR
.00 40.89 58.73
-1.29 29.03 43.41 22.-UNIT CAP. FACTOR (USING. DER NET)
-1.24 27.93 41.77
- 23. UNIT FORCED OUTAGE RATE
.00 12.10 16.70
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
2 5.-
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED
~
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8304260206 830413 PDR ADOCK 05000324 1.16 - 9 R
PDR R