BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2
ML20138L829
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 01/31/1997
From: Harrison F, Turkal M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-97-0055, BSEP-97-55, NUDOCS 9702250112
Download: ML20138L829 (11)


Text

. . . _ _ . . _ - _ _ _ - _ . _ _ . _ . . . _ _ _ . . _ .._..

. \

1 CP&L Carolina Power & Light Company l P.O. Box 10429 Southport, NC 28461-0429 I FEB 141997 i

SERIAL: BSEP 97-0055 FILE: B09-13510C U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk

-Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT l

. Gentlemen:

In accordance with Technical Specification 6.9.1.11 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company (CP&L) submits the enclosed report of operating statistics and shutdown experience for the month of January 1997. Also in accordance with Technical Specification 6.9.1.11, this report is being submitted to the NRC by the 15th day of the month following the calendar month covered by the report.-

Please refer any questions regarding this submittal to Mr. William Murray at (910) 457-2842.

Sincerely, Mark A. Turkal Supervisor- Ucensing Brunswick Nuclear Plant WRM/wrm Enclosures ,

1. Plant Performance Data System Operating Data Report j'
2. Unit Shutdown And Power Reduction Report-January 1997 3, Regulatory Commitments 9702250112 970131 DR ADOCK 05000324; PDR T

)#p g 'I -

250077

. . l i Document Control Desk BSEP 97-0055 / Page 2  ;

I cc: U. S. Nuclear Regulatory Commission ATTN.: Mr. Luis A. Reyes, Regional Administrator 101 Marietta Street, N.W., Suite 2900 l Atlanta, GA 30323-0199 I

.l Mr. C. A. Patterson NRC Senior Resident inspector- Brunswick Units 1 and 2: l l'

U.S. Nuclear Regulatory Commission ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) i 11555 Rockville Pike j Rockville, MD 20852-2738 The Honorable J. A. Sanford  ;

Chairman - North Carolina Utilities Comnlission J P.O. Box 29510 i Raleigh, NC 27626-0510  ;

i I

6 i

i l

l l

l i

, , n -- - . .. ,

. i ENCLOSURE 1 I

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 l DOCKET NOS. 50-325 AND 50-324 LICENGE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT l l

I i )

I I

1 4

PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT i

6

CP&L CO- PLANT PERFORMANCE DATA SYSTEM PAGE 1

-RUN DATE 02/05/97 APPENDIX B'- AVERAGE DAILY POWER LEVEL RPD39-000 RUN. TIME 1,3:40:15 BRUNSWICK UNIT 1 '

DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756

- JANUARY 1997 i DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL' (MWE-NET) (MWE-NET) 1 1

1 817 17 818 2 817 18 818

3 817 19 819 )

I 4 691 20 820 1 5 814 21 818 3

'6- 814 22 817 I

7 815- 23 817 1 l

, 8 _. 817 24 819

! 9 818 25 663 l' 10 818 26 537 11' 817 27 744 l 12 818 28 765 i

13 818 29 794

-14 -819 30 795 I 15 818 31 795 16 817 ..

4 5

1.16 - 8 J

i

+

t 4

- - - - a -- -

. . _ _ _ . _ . _ _ . _ . ~ _ _ . . _ _ . _ . - _ .. _ __ _ ___ ._ ._._.._ _ ._ _ _ _.. _

. +

CP&L_CO . PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN-DATE- 03/05/97 OPERATING DATA REPORT RPD36-000 i

.RUN TIME- 13:40:15_ ,

BRUNSWICK UNIT 1 t i t j DOCKET NO.-050-0325 -

COMPLETED BY-FRANCES HARRISON i OPERATING STATUS TELEPHONE (910)457-2756

' 3 1.-UNIT NAME: BRUNSWICK UNIT l' NOTES  !

. 2.= REPORTING PERIOD: JANUARY 97  :

i 3'.1 LICENSED THERMAL POWER (MWT) : 2558 l S

4'. NAMEPLATE RATING (GROSS MWE) : 867.0 i

5. DESIGN ELECTRICAL RATING (NET MWE) : .821.0  :

4

_6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 I

, ~ 7. MAX DEPENDABLE CAPACITY (NET MWE) : 767.0

. 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7). SINCE LAST REPORT, L

.GIVE REASONS:

i a

-9. POWFR LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :

10. REASONS FOR RESTRICTION IF'ANY .

. i t i

~

4 THIS YR TO CUMUL  ;

5 MONTH DATE -ATIVE i

f 11. HOURS IN REPORTING PERIOD- 744.00 744'00 . 174240.00 ,

12. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.00 111743.76 .
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10 L!
14. HOURS. GENERATOR ON LINE 744.00 744.00 107586.37
15. UNIT RESERVE SHUTDOWN HOURS .00 . .. .00 .00 i
16. GROSS THERMAL ENERGY GEN. (MWH) 1.'68666.68- 1768666.68 238660902.10  ;

e

17. GROSS ELEC. ENERGY GEN. (MWH). 604870.00 604870.00 78587545.00

[ '18. NET ELEC. ENERGY. GENERATED (MWH) 589977.00 589977.00 75674847.00 i

19. UNIT SERVICE FACTOR 100.00 100.00 61.75 )
20. UNIT AVAILABILITY FACTOR. 100.00 100.00 61.75 j 1 21. UNIT CAP. FACTOR (USING MDC NET) 103.39 103.39- 55.47 j
22. UNIT CAP. FACTOR (USING DER NET) 96.59 96.59 52.90
23. UNIT FORCED OUTAGE RATE _ .00 .00 13.30
~ 24. SHUTDOWNS SCHED. OVER NEXT 6. MONTHS (TYPE, DATE, AND DURATION OF EACH) :

i

i. 35. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

j: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED

-INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1 1

)

1.16 -.9 i i  :

4 1

4 -

.-- .- . .- - -_ .- . .-.~. . - - - . - . _ - . - - _ - _ . . . . . . . . - - . _ . -

CP&L 00 PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN.DATE 02/05/97 APPENDIX B - AVERAGE DAILY. POWER LEVEL RPD39-000 l RUN TIME.

13:40:15 BRUNSWICK UNIT 2  ;

4 .

l DOCKET NO. 050-0324  !

COMPLETED BY FRANCES HARRISON  !

j TELEPHONE (910)457-2756 JANUARY 1997 t

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER IEVEL  !

(MWE-NET) (MWE-NET)  !

i r 1 762 17 782 2 770 18 782 i i 3 771 19 783 *

! 4 770 20 784 i

l 5 770 21 784 l 6 771 22 785  !

l

'7 773 23 784 .

i  !

i 8 776 24 785

t i

! .9 777 25 784  !

t l~ 10 ~778 26 784

\

i 11 615 27 784 1 l l

. 12 750 28 783 I i

13 781 29 783 '

i ~14 779 30 785 1

15 781 31 783 1

4 16 780 1

e k

i 1.16 - 8 1

l

l .

? . .

CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 02/05/97 OPERATING DATA REPORT RPD36-000 RUN TIME 1,3:40:15 BRUNSWICK UNIT 2 i DOCKET NO. 050-0324 l COMPLETED BY FRANCES HARRISON l

OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES l 2. REPORTING PERIOD: JANUARY 97 l 3. LICENSED THERMAL POWER (MWT): 2436

! 4. NAMEPLATE RATING (GROSS MWE): 867.O

! 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0

6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0 i 7. MAX DEPENDABLE CAPACITY (NET MWE) : 754.0 -------------------------------

l 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

! 9. POWER LEVEL 'ID WHICH RESTRICTED IF ANY (NET MWE) :

10. REASONS FOR RESTRICTION IF ANY:

THIS YR 'ID CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 744.00 186264,00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.00 121535.55
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 744.00 744.00 115901.02 l 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 l
16. GROSS THERMAL ENERGY GEN. (MWH) 1797844.00 1797844.00 250438775.76
17. GROS 9 ELEC. ENERGY GEN. (MWH) 591205.00 591205.00 81027891.00
18. NET ELEC. ENERGY GENERATED (MWH) 574950.00 574950.00 77812285.00
19. UNIT SERVICE FACIOR 100.00 100.00 62.22
20. UNIT AVAILABILITY FACTOR 100.00 100.00 62.22
21. UNIT CAP. FACTOR (USING MDC NET) 102.49 102.49 53.58 I
23. UNIT CAP. FACTOR (USING DER NET) 94.13 94.13 50.88  :
23. UNIT FORCED OUTAGE RATE .00 .00 10.66  !
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

l l

l l

25. IF SHUTDOWN AT END OF REPORT PFRIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TC COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

l COMMERCIAL OPERATION -------- --------

i l

i 1.16 - 9 l

l

e 4 0 0

D ENCLOSURE 2 i

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT ,

i l

l l

I UNIT SHUTDOWN AND POWER REDUCTION REPORT - JANUARY 1997 4

DOCKET NO 050-0325 '

UNIT NAME Brunswick I -

DATE February 1997 COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH January 1997 NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM CODE (4) COMPONENT CAUSE & CORRECTIVE ACTION (1) 0100RS) (2) SHUTTING EVENT CODE (5) TO PREVENT RECURRENCE DOWN REACTOR REPORT NO.

(3)97-002 970104 5 .00 B 5 NA HA VALVEXX Reduced power to 60% for valve testing, air inleakage and TBED inleakage hunt.97-003 970105 5 .00 B 5 NA RC CONROD Rod Improvement 97-004 970125 5 .00 B 5 NA XX ZZZZZ Reduced power to 60% for Condenser Vacuum Leak Hunt

1. M 2. M 3. g 4. Syst m Code 5. Cet Code F - Forced A- Eauipment Failure 1- Manual Instructions for 5 - Scheduled (e nlain) 2- Manual scram Instructions for preparation of preparation of data entry B- Maintenance or test 3- Automatic scram data entry sheets for Licensee sheets for LER file from C- Refue11rg 4- Continuations Event Report (LER) file fran IEEE Standard 803A-1983 per D- Regulatory restriction 5- Load reductions IEEE Standard 805-1983 per NUREG-1022.Section VI.

E- Operator Training 8 6- Other NUREG-1022 Section VI. Item 13. Item 13.c License Examination b F- Administrative G- Operational error (explain)

H- Other (eglain)

DOCKET NO 050-0324 .

UNIT NAME Brunswick II DATE February 1997 COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH January 1997 _ _

NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM CODE (4) COMPONENT CAUSE & CORRECTIVE ACTION (1) (HOURS) (2) SHUTTING EVENT CODE (5) TO PREVENT RECURRENCE DOWN REACTOR REPORT (3) NO.97-001 970111 S .00 B 5 NA XX ZZZZZ B-N waterbox maintenarce 97-002 970112 s .00 B 5 NA HA CONROD Rod Improvement i

1. In 2. fkits 3. Method 4 Systm Code 5. Cet Code F - Forced A- Equipment Failure (explain) 1- Manual Instructions for preparation Instructions for preparation 5 - Scheduled B- Maintenance or test 2- Manual Scram of data entry sheets for of data entry sheets for LER C- Refueling 3- Automatic scram Licensee Event Report (LER) file from IEEE Standard D- Regulatory restriction 4- Continuations file from IEEE Standard 803A-1983 per NUREG-1022.

E- Operator Training & License 5- Load redxtions 805-1983 per NUPIG 1022 Section VI. Item 13.c Examination 6- Other Section VI. Item 13. b F- Adninistrative G- Operational error (explain)

H- Other (eglain)

_ _ _ . . _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . _ __ ~ . , _ _ _ . . . _ . - _.- - . _ . . . _

ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 NRC DOCKET NOS. 50-325 AND 50-324 OPERATING LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager-Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments.

Commitment Committed date or outage

1. None N/A