Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
. . . ~ . .
l-Apag, 1 I- Carolina Power & Ught Company P.O. Box 10429
' Southport, NC 28461-0429 l
l MAR 121997 :
SERIAL: BSEP 97-0105 , ,
FILE: B09-13510C -
1 l
U. S. Nuclear Regulatory Commission ATTENTION:' Document Control Desk Washington, DC 20555 l BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 i l
DOCKET NOS. 50-325 AND 50-324
- LICENSE NOS. DPR-71 AND DPR-62
~ MONTHLY OPERATING REPORT Gentlemen:
In accordance with Technical. Specification 6.9.1.11 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light. Company submits the enclosed report of operating
! statistics and shutdown experience for the month of February 1997. Also in accordance with
' Technical Specification 6.9.1.11, this report is being submitted to the NRC by the 15th day of the j month following the calendar month covered by the report.
Please refer any questions regarding this submittal to Mr. Mark Turkal, Supervisor- Licensing at - 1 i
(910) 457-3066.
Sincerely, ;
t
% /.
Keith R. Jury Manager- Regulatcry Affairs Brunswick Steam Electric Plant l WRM/wrm
Enclosures:
- 1. Plant Performance Data System Operating Data Report l ' 2. Unit Shutdown And Power Reduction ' Report- February 1997 /
- 3. Regulatory Commitments tI
. 9703190184 970228 " ll l
PDR ADOCK 05000324 s j_ R PDR w 190074 WMEPNRpWR
. . . . . . . . , . i
l i .
NRC Document Control Desk BSEP 97-0101/ Page 2 l
pc (with enclosure):
- U. S. Nuclear Regulatory Commission i ATTN.
- Mr Luis A. Reyes, Regional Administrator 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323-0199 l
Mr. C. A. Patterson NRC Senior Resident inspector- Brunswick Steam Electric Plant, Units 1 and 2 U. S. Nuclear Regulatory Commission l ATTN.: Mr. T. A. Peebles, NRC Region ll 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323-0199 U. S. Nuclear Regulatory Commission ATTN.: Mr. D. C. Payne, NRC Region ll 101 Marietta Street, N.W., Suite 2900 ,
Atlanta, GA 30323-0199 l U.S. Nuclear Regulatory Commission !
ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) i 11555 Rockville Pike Rockville, MD 20852-2738 pc (without enclosure):
! The Honorable J. A. Sanford Chairman - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 I
I
t .
I i
( .
l ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 1 MONTHLY OPERATING REPORT f
l I
l l
l l l
! l 1
i i
t l PLANT PERFORMANCE DATA SYSTEM OPERATING DATA' REPORT l
l
! l l
I I' l l
I i-
. . _ . .- .. - . . - . . ~ . - - . . . . . . .. -.
l CPSL CD' PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 03/07/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 i
'RUN TIME 13:57:14 BRUNSWICK UNIT 1 DOCKET No. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 FEBRUARY 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l (MWE-NET) (MWE-NET) l 1 795 17 797 i
2 794 18 820 3 792 19 820 4 793 20 819 I l
5 793 21 818 6 789 22 817 j 7 793 23 818 8 794 24 819 l
9 793 25 819 l
10 794 26 818 l 11 794 27 817 i
12 793 28 816 j i
13 794 14 758 15 232 16 581 l
1.16 - 8 t
_ _ _ . _ _ _ . _ _ _ _ m _ _ . _ - . _ _ _ . __ _ _. ._ _- . _.. . . - - _ _ . . _ . _ .
l
- CPSL CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 03/07/97 OPERATING DATA REPORT RPD36-000
'RUN TIME 13:57:15 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756
- 1. UNIT NAME: BRUNSWICK UNIT 1 l NOTES l
- 2. REPORTING PERIOD: FEBRUARY 97 l l
- 3. LICENSED THERMAL POWER (MWT): 2558 l l
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 l l ,
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l l l
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0 ------------------------------- :
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
!- THIS YR TO CUMUL
( MONTH DATE ATIVE l 11. HOURS IN REPORTING PERIOD 672.00 1416.00 174912.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 112415.76
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
- 14. HOURS GENERATOR ON LINE 672.00 1416.00 108258.37
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 l 16. GROSS THERMAL ENERGY GEN. (MWH) 1577891.04 3346557.72 240238793.14
! 17. GROSS ELEC. ENERGY GEN. (MWH) 533310.00 1138180.00 79120855.00 l
- 18. NET ELEC. ENERGY GENERATED (MWH) 520271.00 1110248.00 76195118.00
- 19. UNIT SERVICE FACTOR 100.00 100.00 61.89
- 20. UNIT AVAILABILITY FACTOR 100.00 100.00 61.89
- 21. UNIT CAP. FACTOR (USING MDC NET) 100.94 102.23 55.64
- 22. UNIT CAP. FACTOR (USING DER NET) 94.30 95.50 53.06
- 23. UNIT FORCED OUTAGE RATE .00 .00 13.23 l 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
l r
1
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------
INITIAL ELECTRICITY -------- --------
COMMERCIAL OPERATION -------- --------
l 1.16 - 9
- - . . . .- - -. . _ - - -._. - . - ~ . . . . . - . . . - . ~ - . - . . - - . . ~ . - - - - . . . - . ~..
"CPSL CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 03/07/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000
'RUN' TIME 13:57:14 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 FEBRUARY 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 785 17 786 l 2 784 18 785
- 3 784 19 784 ,
4 784 20 784 l
5 783 21 783 '
l 6 783 22 783 7 784 23 784 8 784 24 784 9 784 25 784 10 785 26 784 11 786 27 782 l 12 786 28 781 l 13 787-l-
l 14 787 l
15 786 l
16 785 I
l 1.16 - 8 4
on - -
. - , - - . - - - - ~ . - . - - - . . . . - - - - - . - . . - ~ . - . - . - . - .
'CPSL C0 PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 03/07/97 OPERATING DATA REPORT RPD36-000
'RUN TIME 13:57:15 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756
- 1. UNIT NAME: BRUNSWICK UNIT 2 l NOTES l
- 2. REPORTING PERIOD: FEBRUARY 97 l l
- 3. LICENSED THERMAL POWER (MWT): 2436 l l l 4. NAMEPLATE RATING (GROSS MWE): 867.0 l l
' 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 782.0 l l
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 -------------------------------
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
'9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY
i 1
THIS YR TO CUMUL MONTH DATE ATIVE l 11. HOURS IN REPORTING PERIOD 672.00 1416.00 186936.00 !
( 12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 122207.55
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 l
- 14. HOURS GENERATOR ON LINE 672.00 1416.00 116573.02 '
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 l 16. GROSS THERMAL ENERGY GEN. (MWH) 1636115.04 3433959.04 252074890.80
- 17. GROSS ELEC. ENERGY GEN. (MWH) 541305.00 1132510.00 81569196.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 527021.00 1101971.00 78339306.00
- 19. UNIT 3ERVICE FACTOR 100.00 100.00 62.36 l 20. UNIT AVAILABILITY FACTOR 100.00 100.00 62.36
! 21. UNIT CAP. FACTOR (USING MDC NET) 104.01 103.21 53.75
- 22. UNIT CAP FACTOR (USING DER NET) 95.52 94.79 51.04
- 23. UNIT FORCED OUTAGE RATE .00 .00 10.60
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------
INITIAL ELECTRICITY -------- --------
COMMERCIAL OPERATION -------- --------
l
[
1.16 - 9
. . . . ~ . - - . . - . . - . . - . . . . . ~ . - _ . . . . . . . . - - - - - . . . - . . . . - . - - _ . . -
r- i
! . 1 l
- ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62
- MONTHLY OPERATING REPORT l .
1 I
1 l
l I
l L l l
l l
UNIT SHUTDOWN AND POWER REDUCTION REPORT - FEBRUARY 1997 ~ ..
?
l l
i J
l i
l l
l
?
I l
l r
i l ;
i DOCKET NO OM-0325 ~
i l
UNIT NAME Brunswick I :
DATE- Manh 1997 l COiPLETED BY- Frances Harrison ,
-TELEPHONE 910-457-2756 i i !
t UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February 1997 [
' L'
- ND. DATE TYPE DURATION (HOURS) REASON (2) METHOD OF SHUTTING LICENSEE SYSTEM CODE (4) COMPONENT CAUSE & CORRECTIVE ACTION TO (1) DOWN REACTOR (3) EVENT - CODE (5) PREVENT RECURRENCE !
REPORT NO. [
t 97-005 970201 F .00 A 5 NA HH PIPEXX Efficiency loss of 24MWe/HR due ;
to reduced FFWT resulting from i isolation of the 4A/5A FWH's due to the crack in the 4A FWH drain line to the D/A tank r 97-006 970205 F .00 A '5 NA HH PIPEXX Reduced power due to abnormal FWH line-up to swap heater drain i pumps ,
5 97-007 970214 5 .00 A 5 NA HH PIPEXX DP to 30% to repair crack in 4B ,
FWH drain line to the D/A tank
- 1. Igg 2, Rggs.c!1 3. Method .
- 4. system Code 5. Comoonmt Code .
F - Fo-ced A- Equipment Failure 1- Manual Instructions for Instructions for [
S - Scheduled (explain) 2 - ' Manual Scram preparation of data entry preparation of data entry - t B- Maintenance or test 3- Automatic scram sheets for Licensee Event . sheets for LER file from' C- Refueling 4- Continuations Report (LER) file from IEEE Standard 803A-1983 2 0- Regulatory restriction 5- Load reductions IEEE Standard 805-1983 per per NUREG-1022. -Section E- Operator Training & 6- Othar NUREG-1022 Section VI. VI. Item 13.c .
License Examination Item 13. b F- Adninistrative G- Operational error .!
(explain) -!
H- Other (explain) ;
I i
i i
I
1 t
l ENCLOSURE 3 I
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 l NRC DOCKET NOS. 50-325 AND 50-324 !
OPERATING LICENSE NOS. DPR-71 AND DPR-62 .
MONTHLY OPERATING REPORT I LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager- Regulatory Affairs at the Brunswick Steam Electric Plant of any questions regarding this document or any associated regulatory commitments.
Commitment Committed date or outage
- 1. None N/A l
l i
E
!