BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2
ML20136H560
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 02/28/1997
From: Harrison F, Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-97-0105, BSEP-97-105, NUDOCS 9703190184
Download: ML20136H560 (10)


Text

. . . ~ . .

l-Apag, 1 I- Carolina Power & Ught Company P.O. Box 10429

' Southport, NC 28461-0429 l

l MAR 121997  :

SERIAL: BSEP 97-0105 , ,

FILE: B09-13510C -

1 l

U. S. Nuclear Regulatory Commission ATTENTION:' Document Control Desk Washington, DC 20555 l BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 i l

DOCKET NOS. 50-325 AND 50-324

- LICENSE NOS. DPR-71 AND DPR-62

~ MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical. Specification 6.9.1.11 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light. Company submits the enclosed report of operating

! statistics and shutdown experience for the month of February 1997. Also in accordance with

' Technical Specification 6.9.1.11, this report is being submitted to the NRC by the 15th day of the j month following the calendar month covered by the report.

Please refer any questions regarding this submittal to Mr. Mark Turkal, Supervisor- Licensing at - 1 i

(910) 457-3066.

Sincerely,  ;

t

% /.

Keith R. Jury Manager- Regulatcry Affairs Brunswick Steam Electric Plant l WRM/wrm

Enclosures:

1. Plant Performance Data System Operating Data Report l ' 2. Unit Shutdown And Power Reduction ' Report- February 1997 /
3. Regulatory Commitments tI

. 9703190184 970228 " ll l

PDR ADOCK 05000324 s j_ R PDR w 190074 WMEPNRpWR

. . . . . . . . , . i

l i .

NRC Document Control Desk BSEP 97-0101/ Page 2 l

pc (with enclosure):

U. S. Nuclear Regulatory Commission i ATTN.
Mr Luis A. Reyes, Regional Administrator 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323-0199 l

Mr. C. A. Patterson NRC Senior Resident inspector- Brunswick Steam Electric Plant, Units 1 and 2 U. S. Nuclear Regulatory Commission l ATTN.: Mr. T. A. Peebles, NRC Region ll 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323-0199 U. S. Nuclear Regulatory Commission ATTN.: Mr. D. C. Payne, NRC Region ll 101 Marietta Street, N.W., Suite 2900 ,

Atlanta, GA 30323-0199 l U.S. Nuclear Regulatory Commission  !

ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) i 11555 Rockville Pike Rockville, MD 20852-2738 pc (without enclosure):

! The Honorable J. A. Sanford Chairman - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 I

I

t .

I i

( .

l ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 1 MONTHLY OPERATING REPORT f

l I

l l

l l l

! l 1

i i

t l PLANT PERFORMANCE DATA SYSTEM OPERATING DATA' REPORT l

l

! l l

I I' l l

I i-

. . _ . .- .. - . . - . . ~ . - - . . . . . . .. -.

l CPSL CD' PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 03/07/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 i

'RUN TIME 13:57:14 BRUNSWICK UNIT 1 DOCKET No. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 FEBRUARY 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l (MWE-NET) (MWE-NET) l 1 795 17 797 i

2 794 18 820 3 792 19 820 4 793 20 819 I l

5 793 21 818 6 789 22 817 j 7 793 23 818 8 794 24 819 l

9 793 25 819 l

10 794 26 818 l 11 794 27 817 i

12 793 28 816 j i

13 794 14 758 15 232 16 581 l

1.16 - 8 t

_ _ _ . _ _ _ . _ _ _ _ m _ _ . _ - . _ _ _ . __ _ _. ._ _- . _.. . . - - _ _ . . _ . _ .

l

  • CPSL CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 03/07/97 OPERATING DATA REPORT RPD36-000

'RUN TIME 13:57:15 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1 l NOTES l
2. REPORTING PERIOD: FEBRUARY 97 l l
3. LICENSED THERMAL POWER (MWT): 2558 l l
4. NAMEPLATE RATING (GROSS MWE): 867.0 l l ,
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0 -------------------------------  :
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

!- THIS YR TO CUMUL

( MONTH DATE ATIVE l 11. HOURS IN REPORTING PERIOD 672.00 1416.00 174912.00

12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 112415.76
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 672.00 1416.00 108258.37
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 l 16. GROSS THERMAL ENERGY GEN. (MWH) 1577891.04 3346557.72 240238793.14

! 17. GROSS ELEC. ENERGY GEN. (MWH) 533310.00 1138180.00 79120855.00 l

18. NET ELEC. ENERGY GENERATED (MWH) 520271.00 1110248.00 76195118.00
19. UNIT SERVICE FACTOR 100.00 100.00 61.89
20. UNIT AVAILABILITY FACTOR 100.00 100.00 61.89
21. UNIT CAP. FACTOR (USING MDC NET) 100.94 102.23 55.64
22. UNIT CAP. FACTOR (USING DER NET) 94.30 95.50 53.06
23. UNIT FORCED OUTAGE RATE .00 .00 13.23 l 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

l r

1

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

l 1.16 - 9

- - . . . .- - -. . _ - - -._. - . - ~ . . . . . - . . . - . ~ - . - . . - - . . ~ . - - - - . . . - . ~..

"CPSL CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 03/07/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000

'RUN' TIME 13:57:14 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 FEBRUARY 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 785 17 786 l 2 784 18 785

3 784 19 784 ,

4 784 20 784 l

5 783 21 783 '

l 6 783 22 783 7 784 23 784 8 784 24 784 9 784 25 784 10 785 26 784 11 786 27 782 l 12 786 28 781 l 13 787-l-

l 14 787 l

15 786 l

16 785 I

l 1.16 - 8 4

on - -

. - , - - . - - - - ~ . - . - - - . . . . - - - - - . - . . - ~ . - . - . - . - .

'CPSL C0 PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 03/07/97 OPERATING DATA REPORT RPD36-000

'RUN TIME 13:57:15 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2 l NOTES l
2. REPORTING PERIOD: FEBRUARY 97 l l
3. LICENSED THERMAL POWER (MWT): 2436 l l l 4. NAMEPLATE RATING (GROSS MWE): 867.0 l l

' 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 782.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 -------------------------------
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

'9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY

i 1

THIS YR TO CUMUL MONTH DATE ATIVE l 11. HOURS IN REPORTING PERIOD 672.00 1416.00 186936.00  !

( 12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 122207.55

13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 l
14. HOURS GENERATOR ON LINE 672.00 1416.00 116573.02 '
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 l 16. GROSS THERMAL ENERGY GEN. (MWH) 1636115.04 3433959.04 252074890.80
17. GROSS ELEC. ENERGY GEN. (MWH) 541305.00 1132510.00 81569196.00
18. NET ELEC. ENERGY GENERATED (MWH) 527021.00 1101971.00 78339306.00
19. UNIT 3ERVICE FACTOR 100.00 100.00 62.36 l 20. UNIT AVAILABILITY FACTOR 100.00 100.00 62.36

! 21. UNIT CAP. FACTOR (USING MDC NET) 104.01 103.21 53.75

22. UNIT CAP FACTOR (USING DER NET) 95.52 94.79 51.04
23. UNIT FORCED OUTAGE RATE .00 .00 10.60
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

l

[

1.16 - 9

. . . . ~ . - - . . - . . - . . - . . . . . ~ . - _ . . . . . . . . - - - - - . . . - . . . . - . - - _ . . -

r- i

! . 1 l

  • ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62
MONTHLY OPERATING REPORT l .

1 I

1 l

l I

l L l l

l l

UNIT SHUTDOWN AND POWER REDUCTION REPORT - FEBRUARY 1997 ~ ..

?

l l

i J

l i

l l

l

?

I l

l r

i l  ;

i DOCKET NO OM-0325 ~

i l

UNIT NAME Brunswick I  :

DATE- Manh 1997 l COiPLETED BY- Frances Harrison ,

-TELEPHONE 910-457-2756 i i  !

t UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February 1997 [

' L'

- ND. DATE TYPE DURATION (HOURS) REASON (2) METHOD OF SHUTTING LICENSEE SYSTEM CODE (4) COMPONENT CAUSE & CORRECTIVE ACTION TO (1) DOWN REACTOR (3) EVENT - CODE (5) PREVENT RECURRENCE  !

REPORT NO. [

t 97-005 970201 F .00 A 5 NA HH PIPEXX Efficiency loss of 24MWe/HR due  ;

to reduced FFWT resulting from i isolation of the 4A/5A FWH's due to the crack in the 4A FWH drain line to the D/A tank r 97-006 970205 F .00 A '5 NA HH PIPEXX Reduced power due to abnormal FWH line-up to swap heater drain i pumps ,

5 97-007 970214 5 .00 A 5 NA HH PIPEXX DP to 30% to repair crack in 4B ,

FWH drain line to the D/A tank

1. Igg 2, Rggs.c!1 3. Method .
4. system Code 5. Comoonmt Code .

F - Fo-ced A- Equipment Failure 1- Manual Instructions for Instructions for [

S - Scheduled (explain) 2 - ' Manual Scram preparation of data entry preparation of data entry - t B- Maintenance or test 3- Automatic scram sheets for Licensee Event . sheets for LER file from' C- Refueling 4- Continuations Report (LER) file from IEEE Standard 803A-1983 2 0- Regulatory restriction 5- Load reductions IEEE Standard 805-1983 per per NUREG-1022. -Section E- Operator Training & 6- Othar NUREG-1022 Section VI. VI. Item 13.c .

License Examination Item 13. b F- Adninistrative G- Operational error .!

(explain) -!

H- Other (explain)  ;

I i

i i

I

1 t

l ENCLOSURE 3 I

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 l NRC DOCKET NOS. 50-325 AND 50-324  !

OPERATING LICENSE NOS. DPR-71 AND DPR-62 .

MONTHLY OPERATING REPORT I LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager- Regulatory Affairs at the Brunswick Steam Electric Plant of any questions regarding this document or any associated regulatory commitments.

Commitment Committed date or outage

1. None N/A l

l i