ML20069K186
Jump to navigation
Jump to search
| ML20069K186 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/11/1983 |
| From: | Harrison F CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20069K012 | List: |
| References | |
| NUDOCS 8304260231 | |
| Download: ML20069K186 (1) | |
Text
-
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 04/11/83 COMPLETED BY FRANCES HARRIS 0N TELEPHONE (919)457-9521 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 2 i NOTES I
2.
REPORTING PERIOD: JANUARY 83 I
i 3.
LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
l S.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
l
.6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST' REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10.-REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 744.00 63529.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 721.25 721.25 39497.37
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 713.85 713.85 36864.59
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENCRGY GEN. IMWH) 1352780.96 1352780.96 67649764.32
- 17. GROSS ELEC. ENERGY GEN. (MWH) 458144.00 458144.00 22474836.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 443687.00 443687.00 21535613.00
- 19. UNIT SERVICE FACTOR 95.95 95.95 58.03
- 20. UNIT AVAILABILITY FACTOR 95.95 95.95 58.03
- 21. UNIT CAP. FACTOR (USING HDC NET) 75.49 75.49 42.91
- 22. UNIT CAP. FACTOR (USING DER NET) 72.64 72.64 41.29
- 23. UNIT FORCED OUTAGE RATE 4.05 4.05 16.59
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED-INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8304260231 830413 DR ADOCK 05000 1.16 - 9 DR