I i

)

l ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 j

LICENSE NOS. DPR-71 AND DPR-62 s

MONTHLY OPERATING REPORT l

l' L

I t

1 1:

l PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT DECEMBER 1996 UNIT 1 t

l l

l l;

l l

J 4

s i

1 9705070282 970429 I'

PDR ADOCK 05000324:

R PDR i 4

t

CPAL CO PLANT PERFORMANCE DATA SYSTEM PAGE 1

RUN DATE 03/13/97 OPERATING DATA REPORT RPD36-000 RUN TIME 16:58:59 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1.

I NOTES l

2. REPORTING PERIOD: DECEMBER 96 l

l

3. LICENSED THERMAL POWER (MWT): 2558

~l l

4. NAMEPLATE RATING (GROSS MWE): 867.0 l

l

5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l

l I

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

f THIS YR TO CUMUL i

MONTH DATE ATIVE i

11. HOURS IN REPORTING PERIOD 744.00 8784.00 173496.00 4
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 7607.02 110999.76 d
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10 e

14. HOURS GENERATOR ON LINE 744.00 7491.20 106842.37
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1811297.29 17533664.59 236892235.42 l
17. GROSS ELEC. ENERGY GEN. (MWH) 623055.00 5875895.00 77982675.00 i
18. UET ELEC. ENERGY GENERATED (MWH) 607572.00 5708152.00 75084870.00 1
19. UNIT SERVICE FACTOR 100.00 85.28 61.58 i
20. UNIT AVAILABILITY FACTOR 100.00 85.28 61.58
21. UNIT CAP. FACTOR (USING MDC NET) 106.47 84,72 55.27 3

1

22. UNIT CAP. FACTOR (USING DER NET) 99.47 79.15 52.71
23. UNIT FORCED OUTAGE RATE

.00

'2.62 13.38 24.. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 l