ML20069K168
Jump to navigation
Jump to search
| ML20069K168 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/11/1983 |
| From: | Harrison F CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20069K012 | List: |
| References | |
| NUDOCS 8304260224 | |
| Download: ML20069K168 (1) | |
Text
.
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 04/11/83 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I
2.
REPORTING PERIOD: DECEMBER 82 I
i 3.
LICENSED THERMAL P6WER (MWT): 2436 I
i 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
l 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YF TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 8760.00 62785.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 633.40 3609.22 38776.12
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 596.20 3381.44 36150.74
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1274129.34 6299443.39 66296983.36
- 17. GROSS ELEC. ENERGY GEN. (MWH) 433131.00 2022755.00 22016692.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 418113.00 1902524.00 21091926.00
- 19. UNIT SERVICE FACTOR 80.13 38.60 57.58
- 20. UNIT AVAILABILITY FACTOR 80.13 38.60 57.50
- 22. UNIT CAP. FACTOR (USING DER NET) 68.45 26.45 40.92
- 23. UNIT FORCED OUTAGE RATE 6.40 13.87 16.01
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITIFALITY i
INITIAL ELECTRICITY COMMERCIAL OPERATION 8304260224 830413 PDR ADOCK 05000324 1.16 - 9 R