BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant
ML20096E740
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 12/31/1995
From: Harrison F, Lopriore R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-96-0008, BSEP-96-8, NUDOCS 9601230013
Download: ML20096E740 (9)


Text

I .

CP&L Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461-0429 JAN 161996 FILE: B09-13510C SERIAL: BSEP/96-0008 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.11 for the Brunswick Nuclear Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of December 1995.

If you have any questions regarding this report, please contact Ms. Frances Harrison at (910) 457-2756.

ery tr 'ly y rs, R. Lopriore Plant Manager Brunswick Nuclear Plant FH/mcg MSC/93-8524 Enclosures cc
Mr. S. D. Ebneter, Regional Administrator, Region 11 Mr. C. A. Patterson, NRC Senior Resident inspector - Brunswick Mr. D. C. Trimble, NRR Project Manager - Brunswick The Honorable H. Wells, Chairman - North Carolina Utilities Commission 9501230013 951231 PDR ADOCK 05000324 R PDR ,

I

~ . . _ . . - - . . _ _ . . - _ . _ _ _ _ _ _ - _ . _ . _ - . - . . _ . . _ _ _ _ . _ _ _ . . _ _ . _ _ _ _ . _ _ . _ _ _ _ . _ _ _ -

i

. i l

ENCLOSURE 1 l BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2 t DOCKET NOS. 50-325 & 50-324 LICENSE NOS. DPR-71 & DPR-62 '

PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT ,

t

?

.1

. _ . . . _ . . , _ . . _ . _ ~ . _ . . _ _ . . _ . . _ _ _ . _ . _ _ _ . . . . _ . . _ _ . _ . . _ . _ _ , _ - _ - _ - - . . - _ .

CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1

i 'RtJE DATE 01/09/96 APPEPDIX B - AVERAGE DAILY POWER LEVEL RPD39-000

.RUN TIME 07:21:44 BRUNSWICK UNIT 1 i i

DOCKET NO. 050-0325  !

COMPLETED BY FRANCES HARRISON  !

TELEPHONE (910)457-2756 j

' DECEMBER 1995 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET)  !

1 804 17 804 i

2 802 18 805 l

3 801 19 804 l 4' -802 20 803 l i

5- 803 21 804 I 6 804 22 805  :

I 7' 803 23 806 i

, i

~8 803 24 806 -

l

9. 803 25 806 j i

, 10 803 26 806 .

11 804 27 806 12 804 28 807 j

13 804 29 807 14 803 30 808 15 803 31 806 16 .803 1.16 - 8 i

l I

- - , _ _ . . _ - . .,_. _ . . _ . . ~ _ . . __- --- _ . ~ - . . _ . -

CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 01/15/96 OPERATING DATA REPDRT RPD36-000 -

RUN TIME 10:34:41 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 -

COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1 1 NOTES l
2. REPORTING PERIOD: DECEMBER 95 I I
3. LICENSED THERMAL POWER (MWT): 2436 l l
4. NAMEPLATE RATING (GROSS MWE): 867.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l I
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0 ----------------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 8760.00 164712.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 7521.42 193392.74
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 744.00 7394.18 99351.17
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1811682.43 17822843.94 219358570.83
17. CROSS ELEC. ENERGY GEN (MWH) 613320.00 5947055.00 72106780.00
18. NET ELEC. ENERGY GENERATED (MWH) 598363.00 5777679.00 69376718.00
19. UNIT SERVICE FACTOR 100.00 84.41 60.32
20. UNIT AVAILABILITY FACTOR 100.00 84.41 60.32
21. UNIT CAP. FACTOR (USING MDC NET) 104.86 85.99 53.73
22. UNIT CAP. FACTOR (USING DER NET) 97.96 80.34 51.30
23. UNIT FORCED OUTAGE RATE .00 2.05 14.09
24. SHUTDOWNS SCHED. DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

W(d.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

CP&L'CO .

WT PERFORMANCE DATA SYSTEM PAGE 2'  !

~RDN DATE 01/09/96 At c.ceDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 JtUN TIME 07:21:44 BRUNSWICK UNIT 2 ,

DOCKET NO. 050-0324 i COMPLETED BY FRANCES HARRISON '

TELEPHONE (910)457-2756 DECEMBER- 1995 -

DAY. AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l (MWE-NET) (MWE-NET)  ;

1 616 17 543 ,

.2 612 18 542 ,

i 3 601 19 538 i

4 603- 20 535  !

5 600 21 534 6 596 22 533.

7 595 23 527' 8 595 24 525 ]

9 348 25 526 l

10, 579 26 522  ;

11' 554 27 519 i

12 559 28 518 j 13 554 29 516 l 14 550 30 509 l 15 551 31 509  :

16 543 9

1.16 - 8

?

- ,--eec , , . - nn r~, r n.. y e .r~- - - - > y ----'

t CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 2 MUN DATE 01/15/96 OPERATING DATA REPDRT RPD36-000 *

  • RUN TIME 10:34:41 BRUNSWICK UNIT 2 1

DDCKET NO. 050-0324

  • COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756 -
1. UNIT NAME: BRUNSWICK UNIT 2 l NOTES l

=

2. REPORTING PERIOD: DECEMBER 95 l l
3. LICENSED THERMAL POWER (MWT): 2436 l l
4. NAMEPLATE RATING (GROSS MWE): 867.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 782.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 ----------------------------------------
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FDR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE ,

i

' 11. HOURS IN REPORTING PERIOD 744.00 8760.00 176736.00

12. NUMBER OF HOURS REACTOR CRITICAL 744.00 8760.00 113315.70
13. REACTDR RESERVE SHUTDOWN HRS .00 .00 . 00
14. HOURS GENERATOR ON LINE 744.00 8760.00 197877.71
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 . 00

. 16. GROSS THERMAL ENERGY GEN. (MWH) 1305828.52 19934668.87 232185005.37

17. GROSS ELEC. ENERGY GEN (MWH) 422940.00 6419100.00 75068721.00
18. NET ELEC. ENERGY GENERATED (MWH) 406806.00 6215958.00 72049217.00
19. UNIT SERVICE FACTOR 100.00 100.00 61.04
23. UNIT AVAILABILITY FACTOR 100.00 100.00 - 61.04
21. UNIT CAP. FACTOR (USING MDC NET) 72.52 94.11 52.19
22. UNIT CAP. FACTOR-(USING DER NET) 66.60 86.43 49.65 i
23. UNIT FORCED OUTAGE RATE .00 .00 11.20
24. SHUTDOWNS SCHED. OVER MEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

DO&lMk 00rA&6 f2/2/ 9h 49 PAYS i

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:  ;
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FDRECAST ACHIEVED i INITIAL CRITICALITY INITIAL ELECTRICITY l COW 9ERCIAL OPERATION t

1.16 - 9  ;

i i

m _ ____. m m_.__m_.____ _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . _ _ _ _ _ . _ . _ _ _ _ . _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ - . - . - . . _4 -. ..m. . - - . . - -. .,e..- , .

ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 DOCKET NOS. 50-325 & 50-324  :

LICENSE NOS. DPR-71 & DPR-62 i UNIT SHUTDOWN AND POWER REDUCTION ,

REPORT - DECEMBER 1995 ,

P e

t l

6 I

l I

a l

l l

1

,n

e =

DOCKET NO. 050-0324 UNIT NAME Brunswick 11 .

DATE January 1996 <

COWLETED BY Frances Harrison  ;

. TELEPHONE 910-457-2/56 UNIT SHUTDOWNS AND POWER REDUCTIONS -

l REPORT MONTH December 1995 i

METHOD OF LICENSEE  !~

DURATION SHUTTING DCWN EVENT SYSTEM CODE COWONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) ' CODE (5) PREVENT RECURRENCE 95-052 950827 S In H 5 N/A RC ZZ Core Coastdown.

progress ,95-065 951209 5 00 8 5 N/A CB PUMPXX Reduced power to 253 for . i drywell entry to add oil to  :

reactor recirculation pump. f 1: hpe 2: Reason 3: Method 4: System Code: 5. Component Code F - Forced' A- Equipment Failure 1- Manual Instructions for Instructions for 5 - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1983.

restriction 6- Other per NUREG-1022. per NUREG-1022.

E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination F- Administrative G- Operational error j (explain)

H- Other (explain)  ;

I a

k i i

. J ENCLOSURE 3 l i

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 i NRC DOCKET NOS. 50-325 & 50-324 I OPERATING LICENSE NOS. DPR-71 & DPR-62  ;

i LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power &

Light Company in this document; Any other actions discussed in the submittal -

represent intended or planned actions by Carolina Power & Light Company. They y are described to the NRC for the NRC's information and are not regulatory  ;

commitments. Please notify the Manager - Regulatory Affairs at the Brunswick i Nuclear Plant of any questions regarding this document or any associated regulatory commitments.

Commitment Committed l date or i outage i

1. ~None j

- ~-

O s o f

". em 1

l G

W '

' TOR A s, ,

> g.

1

, gg j " * ~

h "'

~

  • % h . . --

m Mr. William D. Travers, Director Spent Fuel Project Otlice P.O. Box 1671 Otlice of Nuclear Material Safety Tahlequah, OK 74465 and Safeguards U.S. Nuclear Regulatory Comnussion Washington, D C. 20555-0001 1  !