Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant
ML20198J757
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/30/1997
From: Jefferson F, Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-97-0456, BSEP-97-456, NUDOCS 9710220067
Download: ML20198J757 (8)


Text

. .

l..-

CP&L Carolina Power & Light Company P.O. Box 10429 Southport, NC 28401 0429 OCT J 41997 SERIAL: IlSEP 97-0456 FILil:110913510C U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 0001 IIRUNSW.CK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50 324 LICENSE NOS DPR-71 AND DPR 62 MONTilLY OPERATING REPORTS Gentlemen:

In accordance with Technical Specification (TS) 6.9.1.11 for the llrunswick Steam Electric Plant (llSEP), Unit Nos. I and 2, Carolina Power & Light Company is submitting the enclosed reports of operating statistics and shutdown experience for the month of September 1997. As specified in TS 6.9.1.11, these reports are being submitted to the NRC by the 15th day of the month following the calendar month covered by the reports. No regulatory commitments are contained in this letter.

Please refer any questions regarding this submittal to Mr. Warren J. Donnan, Supervisor -

1.icensing, at (910) 457 2068.

Sincerely,

,p.,

A b, Keith R. Jury Manager-Regulatory Affairs 13runswick Steam Electric Plant $

C12CC1 WRM/wrm

Enclosures:

1. 11SEP Unit No. I Monthly Operating Report
2. BSEP Unit No. 2 Monthly Operating Report 9710220067 970930 I PDR ADOCK 05000324; R- PDR l

._ _ _. . .. - . . _ ._ _ ~

Document Control Desk ilSEP 97-0456 / Page 2 i ec (with enclosures):

U. S. Nuclear Regulatory Commission, Region 11 ATIN: Mr. Luis A. Reyes, Regional Administrator Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 U. S. Nuclear Regulatory Commission ,

NITN: Mr. Charles A. Patterson, NRC Senior Resident Inspector 8470 River Road Southport,NC 28461 U. S. Nuclear Regulatory Cornmission A'ITN: Mr. David C. Trimble, Jr. (Mr 1 Stop OWFN 141122) 8 11555 Rockville Pike Rockville, MD 20852 2738

'the lionorable Jo A. Sanford l Chairman North Carolina Utilities Commission P.O. Ilox 29510 Raleigh, NC 27626 0510 l

l l

l l

ENCLOSURE 1 IIRUNSWICK ST EAM ELECTRIC PLANT, UNIT NOS.1 AND 2  ;

DOCKET NOS 50 325 AND 50 324 LICENSE NOS. DPR 71 AND DPR 62 MONTilLY OPERATINO REPORTS i

IIRUNSWICK S1 EAM ELECTRIC PLANT, UNIT I MONTilLY OPERATING REPORT SEPTEMilER 1997 y y x.aq + - - _

y .,,,, _, , ,. . , _.-- - , < - . - . - ,,

__ _ _ _ _ _ . . _ _ _ . _ ~ . _ . . .._ ._ . . _ . __ -_- _ . . ~ _ _ __

I Ol'ERATINC DATA REl' ORT i

IX)CKET NO. 50 325 UNIT NAME Brunswick Steam Electric l'lant, Unit No. I DATE October 6,1997 COMI'LETED llY Frank Jefferson TELEl'IlONE (910)457 2064 1

I REl'ORTING l'ERIOD September 1,1997 to September 30,1997 (Month / Year)

YEAR TO MONTil DATE CUMUI.ATIVE

1. Design Electrical Rating: 821.0 N/A N/A (MWe Net)
2. Maximum Dependable Capacity: 767.0 N/A N/A e (MWe Net).
3. Number ofIlours the Reactor Was Critical: 720,00 6551 117,550.76
4. Number ofIlours the Generator Was On 1.ine: 720.00 6551 113,393.37 5, Unit Reserve Shutdown llours: 0.00 0.00 0.00
6. Net Electrical Energy (MWil): 573,245 5,244,202 80,329,072

~

~

t -4

~

UNIT SHUTDOWNS .

~

DOCKET NO- 50-325 UNIT NAME Bnnsvick Steam Electric Plant. Unit No 1 '

DATE October 6,1997

, COMPLETED BY FrankJefferson TELEPHONE (910) 457-2064 i

REPORTING PERIOD September 1 to September 30,1997 (Month / Year) i

$ NO. DAlli TYPE DURATION REASON (1) MET 110D " CAUSE/COrtRECUVE ACTIONS l

F: FORCED (HOURS) SHtTITINm S: SCilEDULED DOWN (2) COMMENTS 7

N/A 9/97 No unit shutdoum for September 1997.

g

SUMMARY

1-j (I) Reason C)A h d d

A - Equipment Failure (Esplam) 1 -Manual i B- Maintenance er Test 2 - Manral Trip 5 cram

, C- Refucimg 3 - Automanc Trip 5crarn D- Regulatay Restnction 4 -Coatmusema

E - Operssor Trammg/!.keme Exarmaation 5 -Other (Explain) 2 F - Adminatrative i

G -Operauunal Enor (Explain)

II-Other(Emplam) l l

i'

l t

ENCLOSURE 2

)

i BI1UNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 i DOCKET NOS. 50 325 AND 50-324 i LICENSE NOS. DPR 71 AND DPR 62 l MONTilLY OPERATING REPORTS -

i 1  :

e

-[

i 4

1

-t ilRUNSWICK STEAM ELECTRIC PLANT UNIT 2 , ,

MONTiiLY OPERATING REPORT SEPTEMBER 1997 t

A

{

9 e

I

~

, = _ _ .. =

g-w----Mve,sm.e % + - e-m N ? We -w r wy gw rwet-e%rw--h-e ) -ww y vy g - -g m y3 2ef 7* g g t-y-yng y h*a M- moveNM94w gat yWqpm p i e ep-,e go d t-pey--'1ss- g -yupw,e 4 -#'T Y' j F'--'<"---'-FW'"

OPERATING 1)ATA REPORT i

DOCKET NO. 50 324  ;

UNIT NAME 11runswick Steam Electric Plant, Unit No. 2 .

DATE October 6,1997 COMPLETED HY Frank Jefferson TELEPilONE (910)457 2064 REPORTING PERIGI) September 1,1997 to September 30,1997 (Month / Year)

YEAR TO MONTil DATE CUMUI.ATIVE

l. Design Electrical Rating: 821.0 N/A N/A (MWe Net)
2. Masimum Dependablo Capacity: 754.0 N/A N/A (MWe Net).
3. Number ofliours the Reactor Was Critical: 291.5 6122.5 126,914.05
4. Number orilours the Generator Was On Line: 28G.$ 6119.5 121,276.52
5. Unit Reserve Shutdown llours: 0.00 0.00 0.00
6. Net Electrical Energy (MWil): 210,851 4,677,709 81,915,044

e UNIT SHUTDOWNS --

DOCKETNO- 50-324 UNITNAME Brunswick Steam Electric Plant, Unit No. 2 DATE October 6,1997 COMPLETED BY Frank Jefferson TELEPIlONE (910)457-2064 REPORTING PERIOD September I to September 301997 (MonthlYear)

NO. DATE TYPE' DURATION REASON (1) METIIOD OF CAUSECORRECTIVE ACTIONS F: FORCED (HOURS) 511UTTING S: SCIIEDUI.ED DOWN(2) COMMENTS I 9/13/97 S 428.5 C  ! 2 Unit was sk.adown (unit went sub-critical) on September 13,1997 at 0331. The unit was shutdown for a scheduled refueling outage.

Oatage dates are Sepember 13,1997, tc, October 15,1997.

StlMMARY:

(I) Reasta (2) Method

' A- Equipenent Failure (Esplain) I -Manual B - Mamtenance or Test 2 -Manual Trip 5crun C- Refuelmg 3 - Automatac Trip 5crarn D - R.gulatory Restriction 4 -Continuance E - Opermor Trammst.aceme Esarnination 5 -Other(Emplam)

F - Admi16strative G -0;mtsonal Enur(Explain)

II-other (Explain) t.

. - - -