BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2
ML20107H733
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 03/31/1996
From: Harrison F, Lopriore R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-96-0146, BSEP-96-146, NUDOCS 9604240203
Download: ML20107H733 (10)


Text

.

i

?. CP&L

... . ;. n ,.. . . ; . , , ;,.~. , . ; _. n Carolina Power & Light Company Carolina Power & Light Company tarsrarm u m am mar.c;raru n a P.O. Box lo429 Southport, NC 28461-o429 DATE APR 171996 SERIAL: BSEP 96-0146 FILE: B09-13510C U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.11 for the Brunswick Steam Electric Fiant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of March 1996.

Please refer any questions regarding this submittal to Ms. Frances Harrison at (910) 457-2756.

Sincerely, M Q, . .

R. P. Lopri'bre Pl ant General Manager Brunswick Nuclear Plant FH/jwf MSC/93-8524 Enclosures cc: Mr. S. D. Ebneter, Pcgional Administrator, Region 11 Mr. D. C. Trimble, Jr., NRR Project Manager - Brunswick Units 1 and 2 Mr. C. A. Patterson, NRC Senior Resident Inspector - Brunswick Units 1 and 2 The Honorable H. Wells, Chairman - North Carolina Utilities Commission 240074 9604240203 960331 PDR ADOCK 05000324 ,

R PDR

\

, \

ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2 l DOCKET NOS. 50-325 & 50-324 LICENSE NOS. DPR-71 & DPR-62 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT i

l

! 1 l

i i

f 1

-CP&L Cd .

PLANT PERFORMANCE DATA SYSTEM PAGE 1

~RUN DATE '04/03/96 APPENDIX B - AVERAGE DAILY POWER LEVEL- RPD39-000 RUN TIME 12:53:34 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 l

MARCH 1996 l DAY- AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL i 4 (MWE-NET) (MWE-NET) )

i: ,

! 1 800 17 773 2 793 18 16 4 3 802 19 -7 1

i 4 803 20 -6

l l 5 802 21 -5 I I

I j 6 801 22 -9 1 i

7 800 23 -11 8 801 -24 55 l

l 9 801 25 211 l 10 802 26 566 11 802 27 733 12 803 28 773 1

13 802 29 802 4

3 14 802 30 803 l

1 15 802 31 803 1-16- 802 i l

i j

i 1.16 - 8 i'

I

l CP&L C6- PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE '04/03/96 OPERATING DATA REPORT RPD36-000' RUN TIME 12:53:35 BRUNSWIC'; UNIT 1 DOCKET NO. 050-0325 l COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1 NOTES
2. REPORTING PERIOD: MARCH 96
3. LICENSED THERMAL POWER (MWT) : 2436

, 4. NAMEPLATE RATING (GROSS MWE) : 867.0.

5. DESIGN ELECTRICAL RATING (NET MWE): 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0
7. MAX DEPENDABLE CAPACITY (NET MWE) : 767.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY:

1 THIS YR TO CUMUL

MONTH DATE ATIVE
11. HOURS IN REPORTING PERIOD 744.00 2184.00 166896.00
12. NUMBER OF HOURS REACTOR CRITICAL 607.94 2018.46 105411.20
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 588.28 1982.31 101333.48
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1369583.51 4635651.49 223994222.32
17. GROSS ELEC. ENERGY GEN. (MWH) 453580.00 1547620.00 73654400.00
18. NET ELEC. ENERGY GENERATED (MWH) 439518.00 1507578.00 70884296.00 l
19. UNIT SERVICE FACTOR 79.07 90.77 60.72
20. UNIT AVAILABILITY FACTOR 79.07 90.77 60.72
21. UNIT CAP. FACTOR (USING MDC NET) 77.02 90.00 54.20
22. UNIT CAP. FACTOR (USING DER NET) 71.95 84.08 51.73
23. UNIT FORCED OUTAGE RATE 20.93 9.23 14.00
24. SHUTDONNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- -------- ,

i COMMERCIAL OPERATION -------- --------

1.16 - 9 4

CP&L C6 PLANT PERFORMANCE DATA SYSTEM PAGE 2 l RUN DATE '04/03/96 APPEFDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 12:53:34 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 I COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 l

MARCH 1996 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -5 17 362 2 -5 18 -14 3 -6 19 -13 4 -6 20 -13 5 -6 21 -14 6 -5 22 93 7 -6 23 456 8 -6 24 617 9 -11 25 696 10 -13 26 760 11 -14 27 790 12 -16 28 791 13 32 29 790 14 -7 30 790 15 222 31 745 16 265 1.16 - 8

CP&L CD PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE '04/03/96 OPERATING DATA REPORT RPD36-000 RUN TIME 12:53:35 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPORTING PERIOD: MARCH 96
3. LICENSED THERMAL POWER (MWT): 2436 4
4. NAMEPLATE RATING (GROSS MWE) : 867.O

! 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0

6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0
7. MAX DEPENDABLE CAPACITY (NET MWE) : 754.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMryL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 2184.00 178920.00
12. NUMBER OF HOURS REACTOR CRITICAL 395.29 1186.92 114502.62
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 306.18 1097.81 108975.52
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 576425.81 1750792.18 233935797.55
17. GROSS ELEC. ENERGY GEN. (MWH) 184350.00 565940.00 75634661.00
18. NET ELEC. ENERGY GENERATED (MWH) 173987.00 534275.00 72583492.00
19. UNIT SERVICE FACTOR 41.15 50.27 60.91
20. UNIT AVAILABILITY FACTOR 41.15 50.27 60.91
21. UNIT CAP. FACTOR (USING MDC NET) 31.02 32.44 51.96
22. UNIT CAP. FACTOR (USING DER NET) 28.48 29.80 49.41
23. UNIT FORCED OUTAGE RATE 32.11 11.65 11.21
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1.16 - 9 a

% l 2 .

J d

ENCLOSURE 2 l BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 l DOCKET NOS. 50-325 & 50-324

) LICENSE NOS. DPR-71 & DPR-62 UNIT SHUTDOWN AND POWER REDUCTION REPORT - MARCH 1996 I

l l

l I

l l

1 1

i I

1 l

l 1

DOCKET NO. 050-0325 UNIT NAME Brunswick I -

DATE April 1996 COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March 1996 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) PEASON (2) REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE 96-013 960318 F 155 hrs. A 2 1-96-03 WA PUMPXX Forced Outage due SW Pumps thru 43 min. problems. Shutdown by manual 960324 scram.

1: Type 2: Reason 3: Method 4: System Code: 5. Comoonent Code F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for 5 - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5 -- Load reductions IEEE Standard 805-1983. Standard 803A-1983.

restriction 6- Other per NUREG-1022. per NtJREG-1022.

E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Exa.aination F- Administrative G- Operational error (explain)

H- Other (explain)

i DOCKET NO. 050-0324 UNIT NAME Brunswick II -

DATE ADril 1996 COMPLETED BY Frances Harrison TELEPHONE 910-457-2/56 UNIT SHUTDOWNS AND PCEER REDUCTIONS REPORT MONTH March 1096 2

METHOD OF LICENSEE DURATION SHUTTING 0(MN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE 96-006  % 0202- S 951 hrs. C 2 NA RC FUELXX Refueling Outage Completed.

I thru 05 min.

4 960313 96-009 960313 F 32 hrs. A 2 NA HB XXXXXX Outage extended due to MSR 1 thru 16 min. Manway leaks. Unit was off 960314 line because of the Turbine Overspeed Trip Test. Manual scram was inserted to shut unit down.96-011  % 0316 F 00 A 5 NA RC INSTRU Rx power held at 35% due to TIP problems.96-013 960317 F 112 hrs. A 2 NA WA PUMPXX Manual scram due to SW pumps thru 32 min. problems.

960322 1

96-016 960331 F 00 A 5 NA HB XXXXXX Forced Outage due SW Pumps problems. Shutdown by manual scram.

l 1: Type 2: Reason 3: Method 4: System Code: 5. Comoonent Code F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for 5 - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data 4 - B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE-D- Regulatory 5- Load reductions IEEE Star.dard 805-1983. Standard 803A-1983.

< restriction 6- Other per NUREG-1022. per NUREG-1022.

4 E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination F- Administrative G- Operat*onal error (explain)

H- Other (explain) 4 i - - - - - _ _ -


------------_---u

, [ .

ENCLOSURE 3 l l

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS.60-325 & 50-324 OPERATING LICENSE NOS. DPR-71 Ci DPR-62 4

LIST OF REGULATORY COMMITMENTS l

The following table identifies those actions committed to by Carolina Power &

Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They l are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs at the Brunswick l Nuclear Plant of any questions regarding this document or any associated regulatory commitments.

l Commitment Committed date or outage

1. None i