Site: Brunswick  Duke energy icon.png
Issue date: 09/30/1996
From: Harrison F, Turkal M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-96-0375, BSEP-96-375, NUDOCS 9610160306
Download: ML20128N157 (11)


Text

. . . _ __ _ . _ . . - _ _ . . .. . . _ _ _ . _ - - _ . _ _ _ . _ _ - - . __ _ _ _ _ _ _ . . _ _ _ - _ _ _ _ _ _

t

. . . j CP&L Carolina Power & Ught Company P.O. Box 10429 4 Southport NC 28461-0429 OCT 101996 SERIAL: BSEP 96-0375

FILE
B09-13510C U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk j Washington, DC 20555

! BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 l DOCKET NOS. 50-325 AND 50-324 UCENSE NOS. DPR-71 AND DPR-62

.- MONTHLY OPERATING REPORT Gentlemen:

i In accordance with Technical Specification 6.9.1.11 for the Brunswick Steam Electric Plant,

! Units 1 and 2, Carolina Power & Light Company (CP&L) submits the enclosed report of operating statistics and shutdown experience for the month of September 1996. Also in accordance with Technical Specification 6.9.1.11, this report is being submitted to the NRC by the 15th day of the  ;

month following the calendar month covered by the report.

Please refer any questions regarding this submittal to Mr. Bill Murray at (910) 457-2842.

Sincerely,

. Mark A. Turkal Supervisor- Licensing 4 Brunswick Nuclear Plant WRM/wrm i Enclosures kk

1. Plant Performance Data System Operating Data Report
2. Unit Shutdown And Power Reduction Report- September 1996
3. Regulatory Commitments [

./

9610160306 960930 PDR ADOCK 05000324 R PDR i

~ Docur'nent Control Desk BSEP 96-0375 / Page2 1

cc: U. S. Nuclear Regulatory Commission l ATTN.: Mr. Stewart D. Ebneter, Regional Administreor 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 303230199 Mr. C. A. Patterson NRC Senior Resident inspector- Brunswick Units 1 and 2:

U.S. Nuclear Regulatory Commission ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN14H22) 11555 Rockville Pike Rockville, MD 208522738 The Honorable H. Wells Chairman - North Carolina Utilities Commission i ., P.O. Box 29510 iy, Raleigh, NC 276260510

/,

e ENCLOSURE 1 1

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT 1

1

)

l l

PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT 1

4 l

I

CPkL CD. PLANT PERFORMANCE DATA SYSTEM PAGE 1 *

~

RUM DATE 10/03/96 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-e00 RUN TIME 14:19: 10 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 -

COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 SEPTEMBER 1996 .

DAY AVC. DAILY POKh LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 783 17 755 2 782 18 753 3 782 19 752 4 750 20 749 5 4 21 746 6 -11 22 739 7 -11 23 739 8 -10 24 740 9 -14 25 735 10 215 26 732 11 549 27 730 12 687 28 722 13 612 29 720 14 608 30 719 15 756 16 760 1.16 - 8

~

CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 10/03/96 OPERATING DATA REPORT RPD36-000 .

RUN TIME 14:19:10 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON -

OPERATING STATUS TELEPHONE (910)457-2756 1 UNIT NAME: BRUNSWICK UNIT 1 l NOTES I

2. REPORTING PERIOD: SEPTEMBER 96 l l
3. LICENSED THERMAL POWER (MWT): 2436 I i
4. NAMEPLATE RATING (CROSS MWE): 867.0 l l S. DESIGN ELECTRICAL RATING (NET MWE): 821.0 1 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0 ----------------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE 11 HOURS IN REPORTING PERIDD 720.00 6575.00 171287.00

12. NUMBER OF HOURS REACTOR CRITICAL 612.61 6160.92 199553.66
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 597.17 6087.00 105438.17
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1312838.35 14279305.83 233637876.66
17. GROSS ELEC. ENERGY GEN (MWH) 439510.00 4769205.00 76875985.00
18. NET ELEC. ENERGY GENERATED (MWH) 421694.00 4631713.00 74008431.00
19. UNIT SERVICE FACTOR 82.94 92.58 61.55
20. UNIT AVAILABILITY FACTOR 82.94 92.58 61 ? C
21. UNIT CAP. FACTOR (USING MDC NET) 76.36 91.84 55.??
22. UNIT CAP. FACTOR (USING DER NET) 71.34 85.80 52.63
23. UNIT FORCED OUTAGE RATE .00 3.21 13.53
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Outage 10-5-96 for 35 days

25. IF SHUTDOWN AT END OF REPORT PERIDD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COP 99ERCIAL OPERATION 1.16 - 9

. , _ _ . . - . - - . ... _ - . . . - . - _ - . . ,_-_---m.. m - .. . . _ . -_ . . _.- _ . _ .- - _ ..m.-_ . . ._. . .

~

CPa:L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 10/03/96 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 .

QUN TIME 14:19:10 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 -

COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 I

SEPTEMBER 1996 DAY AVG. DAILY POWER LEVEL DAY 8.YC. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 758 17 773 2 758 18 774 l 3 760 19 776 4 759 20 776 5 72 21 775 6 -11 22 777 7 -11 23 777 8 -8 24 777 9 -8 25 775 i 10 -8 26 773 11 -11 27 677 12 -14 28 8459 I

13 142 29 459  ;

r 14 691 30 459 i 15 734 16 775 i

1.16 - 8 l

CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 10/03/96 OPERATING DATA REPDRT RPD36-000 .

CUN TIME 14:19:10 BRUNSWICK UNIT 2 DDCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON -

OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I
2. REPORTING PERIOD: SEPTEMBER 96 I l
3. LICENSED THERMAL POWER (MWT): 2436 l l
4. NAMEPLATE RATING (GROSS MWE): 867.0 l l S. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 782.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 ----------------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 6575.00 183311.00
12. NUMBER OF HOURS REACTOR CRITICAL 567.16 5266.85 118582.55
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 521.98 5070.31 112948.02
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1178885.64 11150803.64 243335809.01
17. GROSS ELEC. ENERGY GEN (MWH) 378465.00 3627605.00 78696326.00
18. NET ELEC. ENERGY GENERATED (MWH) 364405.00 3499795.00 75549012.00
19. UNIT SERVICE FACTOR 72.50 77.11 61.62
23. UNIT AVAILABILITY FACTOR 72.50 77.11 61.62
21. UNIT CAP. FACTOR (USING MDC NET) 67.12 70.60 52.83
22. UNIT CAP. FACTOR (USING DER NET) 61.65 64.83 50.20
23. UNIT FORCED OUTAGE RATE .00 4.01 10.90
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY C0t#9ERCIAL OPERATION 1.16 - 9

ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT

/

t UNIT SHUTDOWN AND POWER REDUCTION REPORT- SEPTEMBER 1996 6

I l

I

DOCKET to 050-0325 .

UNIT NAME Brunswick I DATE October 1996 C01PLETED BY Frances Harrison .

TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT WNTH Sectmber 1996 NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM CODE (4) COMPONENT CAUSE & CORRECTIVE ACTION TD-(1) (HOURS) (2) SHUTTING EVENT CODE (5) PREVENT RECURRENCE DOWN PEACTOR PIPORT NO.

(3)96-035 960905 5 122 hrs. H 2 NA ZZ ZZZZZZ- Outage due to Hurricane Fran 50 min.96-037 960916 5 In Progress H 6 NA RC FUELXX Core Coast down

1. M 2. Perion 3. W 4. Systm Code 6. Convent Code F - Forted A- Equipent failure 1- Manual Instrucuans for preparation 5 - Scheduled (explain) 2- Nnual Sctas Inst 12ctions for preparation of data entry sheets for LIR B- Nintenance or test 3- Autanatic scran of data entry sheets for file frun IEEE 5tandar,1 C. - Refuelirn 4- Continuations Licensee Event Report (LER) 803A 1983 per NtEfG-1022.

D- Regulatory restriction 5- Load reductions file fran 1((E Standar11 Section VI. Iten 13.c E- Operator Training & 6- Other 805-1983 per NtEEG-1022 License Exantnation Section VI. Itsa 13. b F- Mnint strative G- Operational errw (explain)

H- Other (explain)

. l 050-0324  !

DOCKET NO UNIT NAME Brunswick II . I DATE October 19%

COMPLETED BY Frances Harrison , ,

TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS [

I REPORT MONTH S mtember 1996 t

NO. DATE TYP DURATION REASON METHOD OF LICENSEE SYSTEM CODE (4) COMP 0NENT CAUSE & CORRECTIVE ACTION l E (HOURS) (2) SHUTTING EVENT CODE (5) TO PREVENT RECURRENCE  !

(1) DOWN REACTOR REPORT ,

(3) NO.

l

% -042 960905 S 198 hrs. H 2 NA ZZ ZZZZZZ Outage due to Hurricane 1 min. Fran t 96-044 960915 5 .00 B 5 NA RC CONR00 Rod Improvement j 96-045 960927 F IN PROGRESS A 5 NA HH PUMPXX Red. Pwr to 60% for troubleshooting of 2A RFP  !

due to vibration problems

1. I n 2. Eggs 3. Method 4. System Code 5. Comoonent Code "

F - Forced A- Equipment Failure (eglain) 1- Manual Instructions for preparation Instructicris for preparation S - Scheduled B- Maintenance or test 2- Manual Scram of data entry sheets for of data entry sneets for LER C- Refueling 3- Automatic scram Licensee Event Report (LER) file from IEEE Standard i D- Regulatory restriction 4- Continuations file from IEEE Standard 803A-1983 per NUREG-1022.

E- Operator Training & License 5- Load reductions 805-1983 per NUREG-1022 Section VI. Itee 13.c +

Examination 6- Other Section VI. Item 13. b F- Ackninistrative G- Operational error (explain)

H- Other (explain) t i

4 l

1 i

j . .-

ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 i NRC DOCKET NOS. 50-325 AND 50-324 OPERATING LICENSE NOS. DPR-71 AND DPR-62 l MONTHLY OPERATING REPORT l

l LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned

actions by Carolina Power & Light Company. They are described to the NRC for the NRC's -

l information and are not regulatory commitments. Please notify the Manager-Regulatory Affairs at 4 the Brunswick Nuclear Plant of any questions regarding this document or any associated 3 regulatory commitments. i Commitment Committed date or l outage l l

3

1. None N/A i.

i d

T 1

4 4

1 4

i

~ , _ _ . .