Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1
ML20138H782
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/30/1996
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20138H780 List:
References
NUDOCS 9705070280
Download: ML20138H782 (2)


Text

.

1 ENCLOSURE 1 4

i~

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 i

j.

DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 l

MONTHLY OPERATING REPORT -

a i

i i

4 i

8 I

1 i

.l l.

1-1 PLANT PERFORMANCE DATA SYSTEM i

OPERATING DATA REPORT NOVEMBER 1996 i

UNIT 1 4-fl' 1

l

'9705070280 970429 PDR ADOCK 05000324 R

PDR j

. ~.

4 J

CPkL CO PLANT PERFORMANCE DATA SYSTEM PAGE 1

RUN DATE. 03/13/97 OPERATING DATA REPORT RPD36-000 RUN TIME 16:58:46 BRUNSWICK UNIT 1 3

i

{.

DOCKET NO. 050-0325

)

COMPLETED BY FRANCES HARRISON i

OPERATING STATUS TELEPHONE- (910)457-2756

{

j

1. UNIT NAME: BRUNSWICK UNIT 1 1 NOTES l

)

i

2. REPORTING PERIOD: NOVEMBER. 96 l

l

3. LICENSED THERMAL POWER (MWT): 2558 l

l 7

4. NAMEPLATE RATING (GROSS MWE): 867.0 l

l

5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l

l

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

i

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 8040.00 172752.00 I
12. NUMBER OF HOURS REACTOR CRITICAL 600.95 6863.02 110255.76
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE 559.05 6747.20 106098.37
15. UNIT RESERVE SHUTDOWN HOURS'

.00

~. 0 0

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1235151.99 15722367.30 235080938.13 l
17. GROSS ELEC. ENERGY GEN. (MWH) 417240.69 5252840.00 77359620.00
18. NET ELEC. ENERGY GENERATED (MWH) 404693.00 5100580.00 74477298.00
19. UNIT SERVICE FACTOR 77.65 83.92 61.42
20. UNIT AVAILABILITY FACTOR 77.65 83.92 61.42
21. UNIT CAP. FACTOR (USING MDC NET) 73.28 82.71 55.05
22. UNIT CAP. FACTOR (USING DER NET) 68.46 77.27 52.51
23. UNIT FORCED OUTAGE RATE

.00 2.90 13.46

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

-