1 ENCLOSURE 1 4
i~
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 i
j.
DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 l
MONTHLY OPERATING REPORT -
a i
i i
4 i
8 I
1 i
.l l.
1-1 PLANT PERFORMANCE DATA SYSTEM i
OPERATING DATA REPORT NOVEMBER 1996 i
UNIT 1 4-fl' 1
l
'9705070280 970429 PDR ADOCK 05000324 R
PDR j
. ~.
4 J
CPkL CO PLANT PERFORMANCE DATA SYSTEM PAGE 1
RUN DATE. 03/13/97 OPERATING DATA REPORT RPD36-000 RUN TIME 16:58:46 BRUNSWICK UNIT 1 3
i
{.
DOCKET NO. 050-0325
)
COMPLETED BY FRANCES HARRISON i
OPERATING STATUS TELEPHONE- (910)457-2756
{
j
- 1. UNIT NAME: BRUNSWICK UNIT 1 1 NOTES l
)
i
- 2. REPORTING PERIOD: NOVEMBER. 96 l
l
- 3. LICENSED THERMAL POWER (MWT): 2558 l
l 7
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 l
l
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l l
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
i
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 720.00 8040.00 172752.00 I
- 12. NUMBER OF HOURS REACTOR CRITICAL 600.95 6863.02 110255.76
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 559.05 6747.20 106098.37
- 15. UNIT RESERVE SHUTDOWN HOURS'
.00
~. 0 0
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1235151.99 15722367.30 235080938.13 l
- 17. GROSS ELEC. ENERGY GEN. (MWH) 417240.69 5252840.00 77359620.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 404693.00 5100580.00 74477298.00
- 19. UNIT SERVICE FACTOR 77.65 83.92 61.42
- 20. UNIT AVAILABILITY FACTOR 77.65 83.92 61.42
- 22. UNIT CAP. FACTOR (USING DER NET) 68.46 77.27 52.51
- 23. UNIT FORCED OUTAGE RATE
.00 2.90 13.46
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
-