BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2
ML20203E196
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 11/30/1997
From: Jefferson F, Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-97-0528, BSEP-97-528, NUDOCS 9712160411
Download: ML20203E196 (8)


Text

_ _ _ _ _ _ _ _ _ _ _ _

t Carolina Power & Ught Company P.O. Box 10429 Southport, NC 28461-0429 DEC 0 91997 SERIAL: BSEP 97-0528 FILE: B09-13510C U. S. Nuclear Regulatory Commission A'ITENTION: Document Control Desk Washington,DC 20555

- BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTIILY OPERATING REPORT Gentlemen:

In accordance with Technical Specification (TS) 6.9.1.11 for the Brunswick Steam Electric Plant, Unit Nos. I and 2, Carolina Power & Light Company is submitting the enclosed report of operating statistics and shutdown experience for th: month of November 1997. This report is being submitted to the NRC by the 15th day of the month following the calendar month covered by the report as specified in TS 6.9.1.11. No regulatory commitmemr are contained in this letter.

Please refer any questions regarding this submittal to Mr. Warren J. Dorman, Supervisor -

Licensing, at (910) 457-2068.

Sincerely,

$. /f hr A n.L4 '

Keith R. Jury Manager - Regulatory Affairs Brunswick Steam Electric Plant k

. WRM/wrm i

Enclosures:

I/

j

!. BSEP. Unit No.1 Monthly Operating Report

2. BSEP Unit No. 2 Monthly Operating Report

~

9712160411 971130-PDR R

ADOCK 05000324 lhll'lIli]

I 1 .

PDR;

Do'eument Control Desk BSEP 97-0528 / Page 2

- cc (with enclosures):

U. S. Nuclear Regulatory Commission, Region 11 NITENTION: Mr. Luis A. Reyes, Regional Administrator Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303 U. S. Nuclear Regulatory Commission ATTENTION: Mr. Charles A. Patterson, NRC Senior Resident Inspector 8470 Ris er Road Southport,NC 28461 U. S. Nuclear Regulatory Commission ATTENTION: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) 11555 Rockville Pike Rockville, MD 20852-2738 The lionorable J. A. Sanford Chairman - North Carolina Utilities Commission

. P.O. Box 29510 Raleigh, NC 27626-0510 ElectriCities of N.C., Inc. I ATTENTION: Mr. C. C. Wells ,

P.O. Box 29513 Raleigh, NC 27626-0513 4

t-6

~

~

ENCLOSURE 1

. BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. ! AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTIILY OPERATING REPORT s

BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 MONTilLY OPERATING REPORT NOVEMBER 1997 5

w e

. . i APPENDIX A OPERATING DATA REPORT--

DOCKI T NO. 50-325 UNIT NAME Brunswick Steam Electric Plant, Unit No.1 i DATE December 1,1997 l COMPLETED BY Frank Jefferson TELEPilONE (910)457 2064 I i

REPORTING PERIOD November 1,1997 to November 30,1997 (Month / Year)

YEAR TO MONTil DATE CUMULATIVE 821.0 N/A N/A

1. Design Electrical Rating:

(MWe-Net) 767.0 N/A N/A

2. Plaximum Dependable Capacity:

(MWe-Net).

545.2 7841.2 118,841.04

3. Number of flours the Reactor Was Critical:

518.1 7814.1 114,656.42

4. Number ofilours the Generator Was On Line:

0.00 0.00 0.00

5. Unit Reserve Shutdown flours:

399,729 6,229,609 81,314,479

6. Net Electrical Energy (MWil):

{

e

!v-S p N e r

1 ' O I t o

o T 7 C 9 N A /

4 t E S 1

/

i n V T 1 U I N 1 T E o L C M t n

a E

R M 7

9/

l P R O 6 .

/ s O C 1 le c C 1 i

r /

E nnd t

c S wu ob l

e U dl e E A t u u 7 C h f m9 t sd e a9 n4 inia l te1 o6 Uf S 1 s0 r

k rT e2 c ef e5 7-i 5

2 s wbmJ k) 4 F

OG) 2 3

- ne uc n0 DI N(

0 5 BDF( r e r9 a1 OTN 2 l

iU T

TWO l

EiD 7 MS 9

i S 9 N 1 BW Y 0 3

XO D B r e a

)

r )

1 DE I .

(

, DT OE b e N

m a

E N m Y nr NU NM O r c sS EH TA T EIO e

v h

/

S A Si r

c/ p )

in P A P S o n t r EN K

Ll N o E

/

pTna ol ir cit x p AIT CIT TM EPP E o M R Tia laa tauE l

N ONAOE L t ( :uun ot mirn(

U DUDCT 1 raa uotnh t e r

e MMACO b 1 2345 m Mu e

v N)

OS t

t e

o 5 M T R I

9 )

N AU 1 2

(

RO I 2 0

UI l

> D(

O I

R E

P D n E o G D L i

t a

NI EC U E n T PR D E F im a

x R YOl TFl

)

n E )

n C ia e O lp s n

i

  • .a F S P E x nec oi p

x -

E S

(

e e t

s it L E(

R rT u

ic/

t r

n g r o

r ener r) si l

ia o n f e c

RivEi ai la 7 y r ta lap E 9 t

n n agrTr nx T / e or s oE t 6 mel nnt at oi nt ( i A

i

/ pt el ai a r D 1 iui n f u ugemeh r r e i

q a c e pd pt EMRROAOO Y

r.

ABCDEFG1 1 R

A o s

O I M a e

N M R U 1)

S (

,I lllll!ll

ENCLOSURE 2

. BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTilLY OPERATING REPORT BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 MONTilLY OPERATING REPORT NOVEMBER 1997

4

~

^

APPENDIX A OPERATING DATA REPORT 150CKET NO. 50-324 UNIT NAME Brunswick Steam Electric Plant, Unit No. 2 DATE December 1,1997 COMPLETED HY Frank Jefferson s TELEPilONE (910)457-2064 H PORTING PERIOD November 1,1997 to November 30,1997 (Month / Year)

~

YEAR TO MONTil DATE CUMLLATIVE 821.0 N/A N/A

1. Design Electrical Rating:

(MWe-Net) s 754.0 N/A N/A

2. Maximum Dependable Capacity:

(MWe-Net).

720.0 7160.1 127,951.67

3. Number ofIlours the Reactor Was Critical:

i 720.0 7073.1 122,230.15

4. Number ofIlours the Generator Was On Line:

OM 0.00 0.00

5. Unit Reserve Shu:Jown flours:

600,478 5.433,708 82,671,043

6. Net Electrical Energy (MWil):

...___________m_._______ _ _ _ . _ _ _ , _ _ _ _ _ _ . _

APPENDIX B .

UNIT SIIUTDOWNS ., ,

DOCKLTNO. 50 324 UNIT NAME Brunswick Steam Electiic Plant. Unit No. 2 -

DATE December 1,1997 COMPLETED BY Frank JefTerson TELEPIIONE (910)457-2064 REPORTING PERIOD November I to November 30 1997 (Month / Year)

NO. DATE' TYPE DURATION RFASON (1) METIIOD OF ' CAUSE/ CORRECTIVE ACTIONS F: FORCED (IlOURS) SIIUTTING S: SCIIEDULED DOWN (2) COMMENTS N/A II/97 Unit 2 was not shutdown 6tring November 1997.

.g

SUMMARY

(I) Reason (2) Method A - Equipment Failure (Explain) I - Manual 11 - Maintenance or Test 2 - M: tua! Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F- Administratise G - Operational Error (Explain) 1I - Other (Explain)