OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 04/11/83 COMPLETED BY FRANCES HARRISON l
, OPERATING STATUS TELEPHONE (919)457-9521 1.
UNIT NAME: BRUNSWICK-UNIT 2 1 NOTES I
2.
REPORTING' PERIOD: NOVEMBER 82-1 I
-3.1 LICENSED THERMAL POWER (MWT): 2436 I
i 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
i 5.
DESIGN ELECTRICAL RATING (NET MWE): 821 0
-l I
6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l-l 7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST-REPORT, GIVE REASONS:
i 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
I THIS YR TO CUMUL MONTH DATE ATIVE'
~
- 11. HOURS.IN REPORTING PERIOD 720.00 8016.00 62041.00-
- 12. NUMBER OF HOURS REACTOR-CRITICAL
.00 2975.82 38142.72
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE
.00 2785.24 35554.54
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH)
.00 5025314.05 65022854.02
' 17. GROSS ELEC. ENERGY GEN. (MWH)
.00 1589624.00 21583561.00
- 18. NET'ELEC.- ENERGY GENERATED (MWH)
-7387.00 1484411.00 20673813.00
- 19. UNIT SERVICE FACTOR-
.00 34.75 57.31
- 20. UNIT AVAILABILITY FACTOR
.00 34.75 57.31 21 UNIT CAP.-FACTOR (USING MDC NET).
-1.30 23.44 42.18
- 22. UNIT-CAP. FACTOR.(USING DER NET)
-1.25 22.56 40.59
- 23. UNIT FORCED OUTAGE. RATE
.00 15.32 16.96 i'
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
. 26. UNITS IN TEST STATUS'(PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY I
INITIAL ELECTRICITY COMMERCIAL OPERATION l
l 8304260219 830413 PDR ADDCK 05000324 1'16 - 9
/
R PDR l.u