BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2
ML20132C159
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 11/30/1996
From: Harrison F, Turkal M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-96-0451, BSEP-96-451, NUDOCS 9612180168
Download: ML20132C159 (10)


Text

,

CP&L Carolina Power & Light Company ,

P.O. Box 10429 Southport, NC 28461-0429 DEC121996 SERIAL: BSEP 96-0451 FILE: B09-13510C U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.11 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company (CP&L) submits the enclosed report of operating statistics and shutdown experience for the month of November 1996. Also in accordance with Technical Specification 6.9.1.11, this report is being submitted to the NRC by the 15th day of the month following the calendar month covered by the report.

Please refer any questions regsrding this submittal to Mr. William Murray at (910) 457-2842.

Sincerely, Q

Mark A. Turkal Supervisor- Licensing Brunswick Nuclear Plant WRM/wrm Enclosures

1. Plant Performance Data System Operating Data Report
2. Unit Shutdown And Power Reduction Report- November 1996
3. Regulatory Commitments

\

9612180168 961130 \

PDR ADOCK 05000324 R PDR 1(UUd4

l Document Control Desk l BSEP 96-0451/ Page2 l l

i cc: U. S. Nuclear Regulatory Commission l l ATTN.: Mr. Stewart D. Ebneter, Regional Administrator

101 Marietta Street, N.W., Suite 2900 l- Atlanta, GA 303230199 l Mr. C. A. Patterson i NRC Senior Resident inspector- Brunswick Units 1 and 2

l U.S. Nuclear Regulatory Commission ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN14H22)

, 11555 Rockville Pike ,

Rockville, MD 20852L2738  !

The Honorable H. Wells

, Chairman - North Carolina Utilities Commission

! P.O. Box 29510 i Raleigh, NC 276260510 i

i l

l I I l

a 1

l

=

l i ENCLOSURE 1 4

l BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2

- DOCKET NOS. 50-325 AND 50-324 l LICENSE NOS. DPR-71 AND DPR-62  :

MONTHLY OPERATING REPORT 1

s PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT i

l

[

i I

l l

9 g y

CP&L.CO PLRNT PERFORMRNCE DATA SYSTEM PAGE 1

',RUN DATE. 12/09/96 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUM TIME 13:18:52 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 NOVEMBER 1996 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL ,

(MWE-NET) (MWE-NET) l 1 -7 17 816 2 -7 18 815 I l

3 -7 19 814

! 4 -10 20 814 5 -13 21 814 6 -14 22 815 7 47 23 802 I

8 244 24 784 9 353 25 815 10 497 26 815 l

, 11 683 27 816 12 801 28 817 13 541 29 817 14 756 30 816 15 813 l

16 816 3 l

i r

1.16 - 8

. Te CPil CO. ' PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE' 12/12/96 OPERATING DATA REPORT RPD36-000 RUN TIME 11:02:18 BRUNSWICK UNIT 1 DOCKET No. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1 l NOTES l
2. REPORTING PERIOD: NOVEMBER 96 l l
3. LICENSED THERMAL POWER (MWT): 2558 l l
4. NAMEPLATE RATING (GROSS MWE): 867.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0 ----------------------------------------
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

Item 3 has been uprated from 2436 to 2558, power uprating.

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 8040.00 172752.00
12. NUMBER OF HOURS REACTOR CRITICAL 600.95 6863.02 110255.76
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 559.05 6747.20 106098.37
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. CROSS THERMAL ENERGY GEN. (MWH) 1235151.79 16447917.49 246792426.62
17. GROSS ELEC. ENERGY GEN (MWH) 417240.00 5252840.00 77359620.00 1R. NET ELEC. ENERGY GENERATED (MWH) 404693.00 5100580.00 74477298.00
19. UNIT SERVICE FACTOR 77.65 83.92 61.42
20. UNIT AVAILABILITY FACTOR 77.65 83.92 61.42
21. UNIT CAP. FACTOR (USING MDC NET) 73.28 82.71 55.05
22. UNIT CAP. FACTOR (USING DER NET) 68.46 77.27 52.51
23. UNIT FORCED OUTAGE RATE .00 2.90 13.46
24. SHUTDOWNS SCHED. DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 t

e Q .$

CP&L.CO PLANT PERFORMANCE DATA SYSTEM PAGE 2

,RUN DATE, 12/09/96 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN' TIME 13:18:52 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 NOVEMBER 1996 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 773 17 780 l

2 772 18 780 l

3 766 19 781 4 780 20 779 I

5 779 21 778 6 776 22 777 7 774 23 779 1 8 771 24 778 9 774 25 776 10 776 26 774 11 777 27 775 12 778 28 776 13 779 29 777 14 780 30 776 15 780 16 780 1.16 - 8

. CP&L CO .

PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN,DATE. 12/09/96 OPERATING DATA REPORT RPD36-000

  • RUN TIME 13:18:52 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756
1. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPORTING PERIOD: NOVEMBER 96
3. LICENSED THERMAL POWER (MWT): 2436
4. NAMEPLATE RATING (GROSS MWE) : 867.0
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY:

l l

THIS YR TO CUMUL MONTH DATE ATIVE l

11. HOURS IN REPORTING PERIOD 720.00 8040.00 184776.00
12. NUMBER OF HOURS REACTOR CRITICAL 720.00 6731.85 120047.55

! 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00

14. HOURS GENERATOR ON LINE 720.00 6535.31 114413.02
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1751902.99 14705800.70 246890806.07 l 17. GROSS ELEC. ENERGY GEN. (MWH) 576915.00 4800030.00 79868751.00
18. NET ELEC. ENERGY GENERATED (MWH) 559204.00 4637023.00 76686240.00
19. UNIT SERVICE FACTOR 100.00 81.28 61.92 l 20. UNIT AVAILABILITY FACTOR 100.00 81.28 61.92
21. UNIT CAP. FACTOR (USING MDC NET) 103.01 76.49 53.22
22. UNIT CAP. FACTOR (USING DER NET) 94.60 70.25 50.55
23. UNIT FORCED OUTAGE RATE .00 3.14 10.78
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED l INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

l l COMMERCIAL OPERATION -------- --------

1 l

1.16 - 9 I l

l

, --.. . .. . . . - - - . ~ - . ~ . - - . . . ~ - . . . - . . - . ..~ _ .-. - . . . . . . _.. -

ENCLOSURE 2 i

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT l

l l

(

UNIT SHUTDOWN AND POWER REDUCTION REPORT- NOVEMBER 1996 l

i l

I l

4 5

+1 DOCKET NO 050-0325 .

UNIT NAME Brunswick I DATE December 1996 COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November 1996 NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM CODE (4) COMPONENT CAUSE & CORRECTIVE ACTION (1) (HOURS) (2) SHUTTING EVENT CODE (5) TO PREVENT RECURRENCE.

DOWN REACTOR REPORT NO.

(3)96-042 961005- S 802 hrs C 2 NA RC FUELXX Refueling Outage completed 961107 31 min 96-043 961107 5 2 hrs C 2 NA HA TURBIN Turbine Overspeed Trip 17 min Test 96-044 961123 S .00 B 5 NA RC CONROD Reduced power to 70% for rod improvement and bypass valve testing.

1. I.gg 2. h 3. MM 4. Svstem Code 5. Ccreonert Code F - Forced A- Equipment Failure 1- Manual Instructions for 5 - Scheduled (explain) 2- Manual Scram Instructions for preparation of preparation of data entry 8- Maintenance or test 3- Automatic scram data entry sheets for Licenser sheets for LER file fran 4- Continuations Event Report (LER) file from IEEE Standard 803A-1983 per C- Refueling 5- Load reductions IEEE Standard 805-1983 per NUREG-1022.Section VI.

D- Regulatory restriction 6- Other NUREG-1022 Section VI. Item 13. Item 13 c E- Operator Training & b License Examination F- Adninistrative G- Operational error (explain)

H- Other (explain)

l I

i i

DOCKET NO 050-0324 UNIT NAME Brunswick II DATE December 1996 '

COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 i

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November 1996 N0. DATE TYPE DURATION REASON METHOD OF LICENSEE . SYSTEM CODE (4) COMPONENT CAUSE & CORRECTIVE ACTION (1) (HOURS) (2) . SHUTTING EVENT CODE (5) TO PREVENT RECURRENCE -

DOWN REACTOR REPORT (3) N0.96-048 961103 5 .00 B 5- NA RC CONROD Reduced power for rod.

improvement and TSV testing.

1. Ist 2. Pegign 3. W 4. System Code 5. Comonent Code F - Forced A- Equipment Failure (explain) 1- Manual Instructions for preparation Instructions for preparation .

5 - Scheduled B- Maintenance or test 2- Manual Scram of data entry sheets for of data entry sheets for LER C- Refueling 3- Automatic scram Licensee Event Report (LER) file from IEEE Standard 0- Regulatory restriction 4- Continuations file from IEEE Standard 803A-1983 per NUREG-1022.

E- Operator Training & License 5- Load reductions 805-1983 per N' JREG-1022 Section VI. Item 13.c Examination 6- other Section VI. Item 13. b F- Achinistrative a G- Operational error (explain)

H- Other (explain) -

i

..ee- . , . . - . _ - _. ..e . . . , -

.n.~- . . . . ~ ... . . - , , , -. .er. ,,,s. .- , a

ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 NRC DOCKET NOS. 50-325 AND 50-324 OPERATING LICENSE NOS. DPR-71 AND DPR-62 l MONTHLY OPERATING REPORT l

l LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager-Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments.

Commitment Committed date or outage

1. None N/A 4

4