BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1996 for BSEP
ML20101D431
Person / Time
Site: Brunswick  
Issue date: 02/29/1996
From: Harrison F, Lopriore R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-96-0097, BSEP-96-97, NUDOCS 9603200261
Download: ML20101D431 (9)


Text

{{#Wiki_filter:_ CP&L Carolina Power & Light Company i P.O. Box 10429 Southport, NC 28461-0429 MAR 141996 l SERIAL: BSEP 96-0097 FILE: B09-13510C U. S. Nuclear Regulatory Commission j ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 I MONTHLY OPERATING REPORT i l Gentlemen: j in accordance with Technical Specification 6.9.1.11 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of February 1996. Please refer any questions regarding this submittal to Ms. Frances Harrison at (910) 457-2756. Sincerely, M% e R. P. Loprio e Plant General Manager Brunswick Nuclear Plant FH/mcg MSC/93-8524 Enclosures cc: Mr. S. D. Ebneter, Regional Administrator, Region 11 l Mr. D. C. Trimble, Jr., NRR Project Manager - Brunswick Units 1 and 2 l Mr. C. A. Patterson, NRC Senior Resident inspector - Brunswick Units 1 and 2 i The Honorable H. Wells, Chairman - North Carolina Utilities Commission s 200030 9603200261 960229 / 77 B PDR ADOCK 05000324 rf R PDR t \\

ENCLOSURE 1 i BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324 LICENSE NOS. DPR-71 & DPR ; PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT l

'CP&L CO. 03/10/96APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN DATE PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN TIME 11:17:04 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 FEBRUARY 1996 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) ] 1 805 17 806 2 805 18 806 3 806 19 806 4 806 20 805 ) 1 5 806 21 804 6 806 22 803 ) 7 806 23 803 8 806 24 802 9 805 25 803 10 805 26 '802 11 805 27 802 .12 805 28 801 13 806 29 800 ~14 806 15 806 16 806 1.16 - 8

l 4 8 CP6L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 03/12/96 OPERATING DATA REPORT RPD36-000 RUN TIME 08:28:17 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1

] NOTES ]

2. REPORTING PERIOD: FEBRUARY 96

] }

3. LICENSED THERMAL POWER (MWT): 2436

) }

4. NAMEPLATE RATING (GROSS MWE):

867.0 ] }

5. DESIGN ELECTRICAL RATING (NET MWE):

821.0 ) )

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 )

) 7 MAX DEPENDABLE CAPACITY (NET MWE): 767.0 ---------------------------------------- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY-1 l

1 1 l THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 696.00 1440.00 166152.00
12. NUMBER OF HOURS REACTOR CRITICAL 696.00 1410.52 104803.26
13. REACTOR RESERVE SHUTDOWN HRS

.00 .00 1647.10

14. HOURS GENERATOR ON LINE 696.00 1394.03 100745.20
15. UNIT RESERVE SHUTDOWN HOURS

.00 .00 .00

16. GROSS THERMAL ENERGY GEN. (MWH) 1694695.97 3266067.98 222624638.81
17. GROSS ELEC. ENERGY GEN (MWH) 573330.00 1094040.00 73200820.00
18. NET ELEC. ENERGY GENERATED (MWH) 559906.00 1068060.00 70444778.00
19. UNIT SERVICE FACTOR 100.00 96.81 60.63
30. UNIT AVAILABILITY FACTOR 100.00 96.81 60.63
31. UNIT CAP. FACTOR (USING MDC NET) 104.88 96.70 54.10
22. UNIT CAP. FACTOR (USING DER NET) 97.99 90.34 51.64
23. UNIT FORCED OUTAGE RATE

.00 3.19 13.96

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

PLANT PERFORMANCE DATA SYSTEM PAGE 2

  • CP&L CO

. 03/10/96 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000

  • RUN DATE RUN TIME 11:17:04 BRUNSWICK UNIT 2 l

DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 FEBRUARY 1996 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 421 17 -3 2 396 18 -4 3 -14 19 -4 3 4 -9 20 -5 5 -8 21 -4 l 6 -8 22 -3 7 -7 23 -4 8 -6 24 -4 9 -6 25 -4 10 -5 26 -4 11 -5 27 -5 12 -5 28 -5 L 13 -5 29 -5 i 14 -4 15 -4 16 -4 3 i 1.16 - 8 i 5 i O

CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 03/12/96 OPERATING DATA REPORT RPD36-000 RUN TIME 08:28:17 BRUNSWICK UNIT 2 DOCKET NO. 050 0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2

] NOTES ]

3. REPORTING PERIOD: FEBRUARY 96

] ]

3. LICENSED THERMAL POWER (MWT): 2436

] ]

4. NAMEPLATE RATING (GROSS MWE):

867.0 ] ]

5. DESIGN ELECTRICAL RATING (NET MWE) 821.0 ]

]

6. MAX DEPENDABLE CAPACITY (CROSS MWE): 782.0 )

]

7. MAX DEPENDABLE CAPAC'TY (NET MWE):

754.0 ----------------.-----.-------.-------.- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTTNG PERIOD 696.00 1440.00 178176.00
12. NUMBER OF HOURS REACTOR CRITICAL 47.63 791.63 114107.33
13. REACTOR RESERVE SHUTDOWN HRS

.00 .00 .00

14. HOURS GENERATOR ON LINE 47.63 791.63 108669.34
15. UNIT RESERVE SHUTDOWN HOURS

.00 .00 .00

16. GROSS THERMAL ENERGY GEN. (MWH) 64339.63 1174366.37 233359371.74
17. GROSS ELEC ENERGY GEN (MWH) 20670.00 381590.00 75450311.00
18. NET ELEC. ENERGY GENERATED (MWH) 16134.00 360288.00 72409505.00
19. UNIT SERVICE FACTOR 6.84 54.97 60.99
30. UNIT AVAILABILITY FACTOR 6.84 54.97 60,99
31. UNIT CAP. FACTOR (USING M'DC NET) 3.07 33.18 52.04
23. UNIT CAP. FACTOR (USING DER NET) 2.82 30.48 49.50
23. UNIT FORCED OUTAGE RATE

.00 .00 11.13

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:3/13/96
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION l i l i 1.16 - 9 1 l i

I ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 DOCKET NOS. 50-325 & 50-324' LICENSE NOS. DPR-71 & DPR-62 i 1 UNIT SHUTDOWN AND POWER REDUCTION REPORT - FEBRUARY 1996 t E i i

DOCKET NO. 050-0324' I UNIT NAME Brunswick II t DATE March 1996 COWLETED BY Frances Harrison TELEPHONE 910-457-2756 i UNIT SHUTDOWNS AND POWER REDUCTIONS i REPORT K) NTH February 19% METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) -REPORT NO. (4) CODE (5) PREVENT RECURRENCE [ t 95-052 950827 5 H 5 N/A RC ZZ Core Coastdown completed. 96-014 960202 S C 2 N/A RC FUELXX Manually scrammed the Rx and i manually tripped the Main Turbine - start of Refueling Outace. e 1: Type 2: Reason 3: Method 4: System Code: 5. Component Code F - Forced A-Equipment Failure 1-Manual Instructions for-Instructions for 5 - Scheduled (explain) 2-Manual Scram preparation of data entry preparation of data B-Maintenance or test 3-Automatic scram sheets for Licensee Event entry sheets for LER [ C-Refueling 4-Continuations Report (LER) file from file from IEEE D-Regulatory 5-Load reductions IEEE Standard 805-1983. Standard 803A-1983, restriction 6-Other per NUREG-1022. per NUREG-1022. t E-Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination .{ F-Administrative G-Operational error ) (explain) i H-Other (explain) { i i i l l a

e ? ENCLOSURE 3 j BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 LIST OF REGULATORY COMMITMENTS - - The followin0 table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They l are described to the NRC for the NRC's information and are not regulatory L- - commitments. Please notify the Manager - Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments. l l l. Commitment Committed i date or outage 1. None t L l l l l i i =}}