ML020390411

From kanterella
Revision as of 04:22, 28 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
January 2002 Monthly Operating Report for Sequoyah Nuclear Plant
ML020390411
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/08/2002
From: Salas P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020390411 (6)


Text

February 8, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT - JANUARY MONTHLY OPERATING REPORT The enclosure provides the January Monthly Operating Report as required by Sequoyah Technical Specifications Section 6.9.1.10.

This letter is being sent in accordance with RIS 2001-05.

If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely, Original signed by Pedro Salas Licensing and Industry Affairs Manager Enclosure

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

MONTHLY OPERATING REPORT JANUARY 2002 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

OPERATING DATA REPORT Docket No. 50-327 Unit Name SQN Unit 1 Date February 5, 2002 Completed By T. J. Hollomon Telephone (423) 843-7528 Reporting Period

1. Design Electrical Rating (Net MWe): 1148
2. Maximum Dependable Capacity (MWe-Net) 1122 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744.0 744.0 117,449.8
4. Hours Generator On-Line 744.0 744.0 115,524.6
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 855,149 855,149 125,185,709 Docket No. 50-328 Unit Name SQN Unit 2 Date February 5, 2002 Completed By T. J. Hollomon Telephone (423) 843-7528 Reporting Period
1. Design Electrical Rating (Net MWe): 1148
2. Maximum Dependable Capacity (MWe-Net): 1117 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744.0 744.0 122,250.3
4. Hours Generator On-Line 744.0 744.0 120,198.1
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 857,349 857,349 128,039,409 E-2

UNIT SHUTDOWNS DOCKET NO: 50-327 UNIT NAME: SQN-1 DATE: February 5, 2002 COMPLETED BY: T. J. Hollomon TELEPHONE: (423) 843-7528 REPORT PERIOD: JANUARY 2002 No. Date Type Duration Reason Method of Cause and Corrective Action to Prevent Recurrence F:Forced 1 (Hours) Shutting S:Scheduled Down Reactor2 No power reductions of greater than 20 percent during January 2002.

Summary : Unit 1 operated at 100 percent power throughout the remainder of the month of January with a capacity factor of 102 percent. No PORVs or safety valves were challenged in January.

1 2 Reason: Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-ContinuationOutage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H- Other (Explain)

E-3

UNIT SHUTDOWNS DOCKET NO: 50-328 UNIT NAME: SQN-2 DATE: February 5, 2002 COMPLETED BY: T. J. Hollomon TELEPHONE: (423) 843-7528 REPORT PERIOD: JANUARY 2002 No. Date Type Duration Reason Method of Cause and Corrective Action to Prevent Recurrence F:Forced 1 (Hours) Shutting S:Scheduled Down Reactor2 No power reductions of greater than 20 percent during January 2002.

Summary: Unit 2 operated at 100 percent power throughout the month of January with a capacity factor of 103 percent. No PORVs or safety valves were challenged in January.

1 2 Reason: Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-ContinuationOutage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H- Other (Explain)

E-4