April 7, 2005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT - MARCH MONTHLY OPERATING REPORT The enclosure provides the March Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.
If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.
Sincerely, Original signed by:
P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure S64 050407 800
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
MONTHLY OPERATING REPORT MARCH 2005 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79
OPERATING DATA REPORT 50-327 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
Sequoyah 1 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)
- 1.
- 2.
- 3.
- 4.
- 5.
- 6. Net Electrical Energy Generated (MWHrs)
Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours April 05, 2005 March 2005 744.00 2,160.00 142,243.18 744.00 2,160.00 140,172.58 879,525.00 2,546,173.00 153,471,866.0 0.00 0.00 0.00 1,160.00 1,148.00 Sharon Powell 423/843-7855 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)
Type F: Forced S: Scheduled Date No.
SUMMARY
- The gross maximum dependable capacity factor for Unit 1 was 102.60 for March 2005.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)
Page 1
OPERATING DATA REPORT 50-328 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:
Sequoyah 2 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)
- 1.
- 2.
- 3.
- 4.
- 5.
- 6. Net Electrical Energy Generated (MWHrs)
Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours April 05, 2005 March 2005 744.00 2,124.53 147,244.71 744.00 2,098.95 144,952.29 857,230.00 2,389,180.00 155,836,444.0 0.00 0.00 0.00 1,160.00 1,124.00 Sharon Powell 423/843-7855 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)
Type F: Forced S: Scheduled Date No.
SUMMARY
- The gross maximim dependable capacity factor was 102.07 for Unit 2 for March 2005.
1 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)
Page 2