Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 July 10, 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket Nos.50-327 50-328 SEQUOYAH NUCLEAR PLANT -
JUNE MONTHLY OPERATING REPORT The enclosure provides the June Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.
This letter is being sent in accordance with NRC RIS 2001-05.
If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.
Lice ng and Industry Affairs Manager Enclosure cc (Enclosure):
Mr. Michael L. Marshall, Jr., Senior Project Manager U.S. Nuclear Regulatory Commission MS O-8G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 P-inted -n -ecyded paper
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
MONTHLY OPERATING REPORT JUNE 2003 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79
OPERATING DATA REPORT Docket No.
50-327 Unit Name SQN Unit 1 Date July 8, 2003 Completed By Tanya Hollomon Telephone (423) 843-7528 Reporting Period June 2003
- 1.
Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1160 1125 Month Yr-to-Date Cumulative
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh) 381.9 2,185.1 127,650.9 320.6 2,123.8 125,664.4 0.0 0.0 0.0 299,616 2,366,975 136,651,065 Docket No.
Unit Name Date Completed By Telephone 50-328 SQN Unit 2 July 8, 2003 Tanya Hollomon (423) 843-7528 Reporting Period June 2003
- 1.
Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net):
1160 1126
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 720.0 3,913.6 133,139.1 720.0 3,863.5 130,961.1 0.0 0.0 0.0 810,189 4,335,788 140,059,890 E-1
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-327 SQN-1 July 8, 2003 Tanya Hollomon (423) 843-7528 2
030617 S
9.9 B
unit I Cycle I 2 refueling and steam generator replacement outage was completed when the unit was tied to the grid on June 17 at 0532 EDT.
Unit 1 generator was removed from the grid for turbine balance shot test on June 17 at 1411 EDT. Reactor remained at power. The generator was tied online on June 18 at 0004 EDT.
5 Summary: Unit 1 Cycle 12 refueling and steam generator replacement outage ended on June 17 at 0532 EDT. Unit 1 gross maximum dependable capacity factor was 37.9 percent for the month of June.
'Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refiueling D-Regulatoiy Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 2 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-ContinuationOutage 5-Other (Explain)
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-328 SQN-2 July 8, 2003 Tanya Hollomon (423) 843-7528 Summary: Unit 2 gross maximum dependable capacity factor was 99.6 percent for the month of June. Unit 2 operated at 100 percent reactor power throughout the month of June.
' Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 2 Method I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-ContinuationOutage 5-Other (Explain)