October 7, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos.50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT - SEPTEMBER MONTHLY OPERATING REPORT The enclosure provides the September Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.

This letter is being sent in accordance with NRC RIS 2001-05.

If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely, Original signed by Pedro Salas Licensing and Industry Affairs Manager Enclosure

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

MONTHLY OPERATING REPORT SEPTEMBER 2002 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

E-1 OPERATING DATA REPORT Docket No.

50-327 Unit Name SQN Unit 1 Date October 3, 2002 Completed By Tanya Hollomon Telephone (423) 843-7528 Reporting Period 1.

Design Electrical Rating (Net MWe):

1160 2.

Maximum Dependable Capacity (MWe-Net) 1126 Month Yr-to-Date Cumulative 3.

Number of Hours Reactor was Critical 720.0 6,551.0 123,256.8 4.

Hours Generator On-Line 720.0 6,551.0 121,331.6 5.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 6.

Net Electrical Energy Generated (MWh) 804,149 7,419,372 131,749,932 Docket No.

50-328 Unit Name SQN Unit 2 Date October 3, 2002 Completed By Tanya Hollomon Telephone (423) 843-7528 Reporting Period 1.

Design Electrical Rating (Net MWe):

1160 2.

Maximum Dependable Capacity (MWe-Net):

1120 Month Yr-to-Date Cumulative 3.

Number of Hours Reactor was Critical 720.0 5,637.8 127,144.0 4.

Hours Generator On-Line 720.0 5,562.3 125,016.3 5.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 6.

Net Electrical Energy Generated (MWh) 801,712 6,169,560 133,351,620

E-2 UNIT SHUTDOWNS DOCKET NO:

50-327 UNIT NAME:

SQN-1 DATE:

October 3, 2002 COMPLETED BY: Tanya Hollomon TELEPHONE:

(423) 843-7528 REPORT PERIOD: SEPTEMBER 2002 No.

Date Type F:Forced S:Scheduled Duration (Hours)

Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence No power reductions of greater than 20 percent during September 2002.

Summary : Unit 1 operated at 100 percent power throughout the month of September with a capacity factor of 99.2 percent. No PORVs or safety valves were challenged in September.

1 Reason:

2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-ContinuationOutage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

E-3 UNIT SHUTDOWNS DOCKET NO:

50-328 UNIT NAME:

SQN-2 DATE:

October 3, 2002 COMPLETED BY: Tanya Hollomon TELEPHONE:

(423) 843-7528 REPORT PERIOD: SEPTEMBER 2002 No.

Date Type F:Forced S:Scheduled Duration (Hours)

Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence No power reductions of greater than 20 percent during September 2002.

Summary: Unit 2 operated at 100 percent power throughout the month of September with a capacity factor of 99.3 percent. No PORVs or safety valves were challenged in September.

1 Reason:

2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-ContinuationOutage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)