January 11, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT - DECEMBER MONTHLY OPERATING REPORT The enclosure provides the December Monthly Operating Report as required by Sequoyah Technical Specifications Section 6.9.1.10.
This letter is being sent in accordance with RIS 2001-05.
If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.
Sincerely, Original signed by J. D. Smith for Pedro Salas Licensing and Industry Affairs Manager Enclosure
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
MONTHLY OPERATING REPORT DECEMBER 2001 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79
E-1 OPERATING DATA REPORT Docket No.
50-327 Unit Name SQN Unit 1 Date January 4, 2002 Completed By T. J. Hollomon Telephone (423) 843-7528 Reporting Period 1.
Design Electrical Rating (Net MWe):
1148 2.
Maximum Dependable Capacity (MWe-Net) 1122 Month Yr-to-Date Cumulative 3.
Number of Hours Reactor was Critical 744.0 8,012.1 116,705.8 4.
Hours Generator On-Line 744.0 7,989.6 114,780.6 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 6.
Net Electrical Energy Generated (MWh) 854,592 9,018,985 124,330,560 Docket No.
50-328 Unit Name SQN Unit 2 Date January 4, 2002 Completed By T. J. Hollomon Telephone (423) 843-7528 Reporting Period 1.
Design Electrical Rating (Net MWe):
1148 2.
Maximum Dependable Capacity (MWe-Net):
1117 Month Yr-to-Date Cumulative 3.
Number of Hours Reactor was Critical 744.0 8,760.0 121,506.0 4.
Hours Generator On-Line 744.0 8,760.0 119,454.1 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 6.
Net Electrical Energy Generated (MWh) 855,265 9,939,871 127,182,060
E-2 UNIT SHUTDOWNS DOCKET NO:
50-327 UNIT NAME:
SQN-1 DATE:
January 4, 2002 COMPLETED BY: T. J. Hollomon TELEPHONE:
(423) 843-7528 REPORT PERIOD: DECEMBER 2001 No.
Date Type F:Forced S:Scheduled Duration (Hours)
Reason 1
Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence Summary : Unit 1 operated at 100 percent power throughout the month of December with a capacity factor of 105 percent. No PORVs or safety valves were challenged in December.
1 Reason:
2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-ContinuationOutage E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
E-3 UNIT SHUTDOWNS DOCKET NO:
50-328 UNIT NAME:
SQN-2 DATE:
January 4, 2002 COMPLETED BY: T. J. Hollomon TELEPHONE:
(423) 843-7528 REPORT PERIOD: DECEMBER 2001 No.
Date Type F:Forced S:Scheduled Duration (Hours)
Reason 1
Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence Summary: Unit 2 operated at 100 percent power throughout the month of December with a capacity factor of 105 percent. No PORVs or safety valves were challenged in December.
1 Reason:
2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-ContinuationOutage E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)