October 2004 Monthly Operating Report for Sequoyah Nuclear Plant
ML043150385
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/10/2004
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043150385 (4)


Text

November 10, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT - OCTOBER MONTHLY OPERATING REPORT The enclosure provides the October Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.

If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely, Original signed by:

P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

MONTHLY OPERATING REPORT OCTOBER 2004 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

OPERATING DATA REPORT DOCKET NO. 50-327 UNIT NAME Sequoyah 1 DATE November 03, 2004 COMPLETED BY Renee McKaig TELEPHONE (423)843-8963 REPORTING PERIOD: October 2004

1. Design Electrical Rating 1,160.00
2. Maximum Dependable Capacity (MWe-Net) 1,148.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 576.00 7,057.20 139,045.65
4. Number of Hours Generator On-line 576.00 7,035.58 137,020.16
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 665,022.00 8,169,968.00 149,805,186.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 2 10/25/2004 S 169.00 C 1 Scheduled Unit 1 Cycle 13 refueling outage

SUMMARY

Unit 1 gross maximum dependable capacity factor was 77.79 for the month of October 2004.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1

OPERATING DATA REPORT DOCKET NO. 50-328 UNIT NAME Sequoyah 2 DATE November 03, 2004 COMPLETED BY Renee McKaig TELEPHONE (423)843-8963 REPORTING PERIOD: October 2004

1. Design Electrical Rating 1,160.00
2. Maximum Dependable Capacity (MWe-Net) 1,124.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 745.00 6,931.95 143,656.18
4. Number of Hours Generator On-line 745.00 6,889.38 141,389.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 844,611.00 7,788,075.00 151,770,446.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 gross maximum dependable capacity factor was 101.24 for the month of October 2004.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 2